You are on page 1of 16
Total No. of Questions : 5 Time : Roll No. Candidate should write his/her Roll No. here. M0912012 CIVIL ENGINEERING First Paper No. of Printed Pages : 8 3 Hou [Total Marks : 300 Instructions to the candidates : 1 There are five questions in this question paper. All the five questions have to be answered. The total number of marks is 300 and the time allotted is 3 hours. All questions carry equal marks, unless specifically stated. The first question will be of short answer type consisting 20 questions, each one is to be answered in one or two lines. Questions should be answered preferably in order in which they appear in the question paper. Answers to the various parts of the same question should be written together compulsorily and no answers of other questions should be inserted between them. Assume suitable data wherever required. All symbols have their usual meanings, unless mentioned otherwise. Give neat sketches or diagrams wherever necessary. Wherever word limit has been given it must be adhered to. Use of 1.8. Codes is permitted. 091) P.T.O. (A) (B) «c) (D) (E) (F) (A) @ () M0912012 Write answer in one or to lines of the following questions; 20x3=60 Define “degrees of freedom", Define “statie and kinematic indeterminacy”. Explain “Mullar Breslau’s” principle. State “Castigliano’s Theorem”. Differentiate between flexibility and stiffness approach of analysis. Why is the compaction essential in concrete ? Classify the rivet connections. What is the mode of failure of a R.C. beam ? Differentiate between expansion and contraction joints in concrete. Differentiate between Bond stress and Diagonal tension. 09(1) (K) (L) (™) (Ny (O) (P) @ (R) (Ss) ) M0912012 Write a note on “Contract Document”. List. out the classification of Scheduling. What do you mean by PERT ? What is a critical path ? How is it identified ? What is present worth of money ? Discuss its uses. What do you mean by “Per Capita Sewage” ? Describe the laying of a sewer line in a trench, Differentiate between “Manhole” and “Drop Manhole”. Explain “BOD” and “COD” in a sewage. Describe the aim of the ‘Sedimentation” in sewage treatment. 091) P.T.O.

You might also like