Professional Documents
Culture Documents
It is important to fully understand the information provided in the technical notice before
using this complementary information
1. Once the hauling system is in place, raising the victim moves the knots toward the system.
2. Move the TIBLOC-type rope clamp below the knot to the other side of the knot. The TIBLOC
is not loaded and can simply be removed.
3. With the weight still on the pulley, install a long sling (120 cm) onto the anchor and connect it
to the TIBLOC. Push the TIBLOC downward until the sling is at maximum tension.
4. Carry out a small pull on the system to briefly release the cam of the MICRO TRAXION.
Allow the load to descend under tension onto the sling and TIBLOC.
5. With the load on the TIBLOC, only the sling and the lower rope are taut. Untie the knot.
6. After untying the knot, check that the MICRO TRAXION's cam is engaged and continue
normal hauling on the system. After the first movement, disconnect the sling from the TIBLOC,
until the next knot.