Spares and Consumablesfor 07yearsoperation after Warrantyperiod, to be supplied for the entire FLEET as one set –
Area-1
Sl Description QTY Total Value (Rs.)
st
Basic FOR destination price for spares and consumables for 1 year of
3 5265052.00
Guarantee period without NPV
st 1 Set
Add: GST as quoted for spares and consumables for 1 year of
1298365.06
Guarantee period without NPV
nd
Basic FOR Destination price for spares and consumables for 2 year of
4 12376770.00
Guarantee period without NPV
nd 1 Set
Add: GST as quoted for spares and consumables for 2 year of
3232619.60
Guarantee period without NPV
rd
Basic FOR Destination price for spares and consumables for 3 year of
5 23567655.00
Guarantee period without NPV
rd 1 Set
Add: GST as quoted for spares and consumables for 3 year of
6399082.50
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 4 year of
6 30422526.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 4 year of
8312190.78
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 5 year of
7 32818124.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 5 year of
9032665.92
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 6 year of
8 15831674.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 6 year of
4217260.42
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 7 year of
9 13867658.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 7 year of
3734156.94
Guarantee period without NPV
Total cost of spares and consumables for 08 years including GST
17,48,99,971.52
without NPV
Total cost of spares and consumables for 08 years excluding GST
13,78,40,344.00
without NPV
1
Landed price for the Fleet inclusive of spares and consumables for 08 years in INR Before ITC
47,15,02,994.37
without NPV for Area-1
Landed price for the Fleet inclusive of spares and consumables for 08 years in INR after ITC
36,95,61,455.60
without NPV for Area-1
2. Area-2
Equipment:
Item SN Description of Item QTY UNIT RATE (Rs) EXT Value (Rs.)
Supply of Diesel Powered, Self-Propelled, Wheeled Rear Dumper with not less than 60Ton (54.4 Tonne)
Rock Body including design, manufacture, delivery, erection, commissioning and performance testing along
with spares and consumables for 01 year warranty period and 08 years guarantee period beyond warranty
1 period. – Model: BH60M, Make- BEML.
Basic Ex-works price for equipment 02 nos 20660000.00 41320000.00
Packing & Forwarding charges 0.00 0.00
Freight charges 401567.59 803135.18
Transit Insurance 3936.00 7872.00
Landed price of Equipment without GST 2,10,65,503.59 4,21,31,007.18
Add: GST @28% 58,98,341.01 1,17,96,682.01
Landed price of Equipment with GST 2,69,63,844.60 5,39,27,689.19
Spares and consumables during Warranty Period:
Basic FOR destination price for spares and
02 sets 335535.00 671070.00
consumables during warranty period without NPV
2
Add: GST as quoted on cost of warranty spares & 02
75753.30 151506.60
consumables without NPV Sets
Spares and Consumables for 07 years operation after Warranty period, to be supplied for the entire FLEET as one set
– Area-2
Sl Description QTY Total Value (Rs.)
st
Basic FOR destination price for spares and consumables for 1 year of
3 1007310.00
Guarantee period without NPV
st 1 Set
Add: GST as quoted for spares and consumables for 1 year of
252201.40
Guarantee period without NPV
nd
Basic FOR Destination price for spares and consumables for 2 year of
4 1032184.00
Guarantee period without NPV
nd 1 Set
Add: GST as quoted for spares and consumables for 2 year of
248881.92
Guarantee period without NPV
rd
Basic FOR Destination price for spares and consumables for 3 year of
5 5720455.00
Guarantee period without NPV
rd 1 Set
Add: GST as quoted for spares and consumables for 3 year of
1562447.20
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 4 year of
6 6048077.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 4 year of
1658375.36
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 5 year of
7 7085511.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 5 year of
1957966.28
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 6 year of
8 3268838.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 6 year of
877317.64
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 7 year of
9 3857060.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 7 year of
1047026.20
Guarantee period without NPV
Total cost of spares and consumables for 08 years including GST
3,64,46,227.60
without NPV
Total cost of spares and consumables for 08 years excluding GST
2,86,90,505.00
without NPV
2
Landed price for the Fleet inclusive of spares and consumables for 08 years in INR Before ITC
9,03,73,916.79
without NPV for Area-2
Landed price for the Fleet inclusive of spares and consumables for 08 years in INR after ITC
7,08,21,512.18
without NPV for Area-2
3. Area-3
Equipment:
Item SN Description of Item QTY UNIT RATE (Rs) EXT Value (Rs.)
Supply of Diesel Powered, Self-Propelled, Wheeled Rear Dumper with not less than 60Ton (54.4 Tonne)
Rock Body including design, manufacture, delivery, erection, commissioning and performance testing along
1 with spares and consumables for 01 year warranty period and 08 years guarantee period beyond warranty
period. – Model: BH60M, Make- BEML.
Basic Ex-works price for equipment 10 nos 20660000.00 206600000.00
Packing & Forwarding charges 0.00 0.00
Freight charges 401614.60 4016146.00
Transit Insurance 3936.00 39360.00
Landed price of Equipment without GST 2,10,65,550.60 21,06,55,506.00
Add: GST @28% 58,98,354.17 5,89,83,541.68
Landed price of Equipment with GST 2,69,63,904.77 26,96,39,047.68
Spares and consumables during Warranty Period:
Basic FOR destination price for spares and
10 sets 335535.00 3355350.00
consumables during warranty period without NPV
2
Add: GST as quoted on cost of warranty spares 10
75753.30 757533.00
&consumables without NPV Sets
Spares and Consumables for 07 years operation after Warranty period, to be supplied for the entire FLEET as one set
– Area-3
Sl Description QTY Total Value (Rs.)
st
Basic FOR destination price for spares and consumables for 1 year of
3 4773638.00
Guarantee period without NPV
st 1 Set
Add: GST as quoted for spares and consumables for 1 year of
1175691.84
Guarantee period without NPV
nd
Basic FOR Destination price for spares and consumables for 2 year of
4 10181323.00
Guarantee period without NPV
nd 1 Set
Add: GST as quoted for spares and consumables for 2 year of
2638071.44
Guarantee period without NPV
rd
Basic FOR Destination price for spares and consumables for 3 year of
5 18137279.00
Guarantee period without NPV
rd 1 Set
Add: GST as quoted for spares and consumables for 3 year of
4895027.52
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 4 year of
6 27282366.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 4 year of
7450489.08
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 5 year of
7 29256208.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 5 year of
8048317.84
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 6 year of
8 14475180.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 6 year of
3856420.60
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 7 year of
9 11409810.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 7 year of
3062304.70
Guarantee period without NPV
Total cost of spares and consumables for 08 years including GST
15,07,55,010.02
without NPV
Total cost of spares and consumables for 08 years excluding GST
11,88,71,154.00
without NPV
3
Landed price for the Fleet inclusive of spares and consumables for 08 years in INR Before ITC
42,03,94,057.70
without NPV for Area-3
Landed price for the Fleet inclusive of spares and consumables for 08 years in INR after ITC
32,95,26,660.00
without NPV for Area-3
4. Area-4
Equipment:
Item SN Description of Item QTY UNIT RATE (Rs) EXT Value (Rs.)
Supply of Diesel Powered, Self-Propelled, Wheeled Rear Dumper with not less than 60Ton (54.4 Tonne)
Rock Body including design, manufacture, delivery, erection, commissioning and performance testing along
1 with spares and consumables for 01 year warranty period and 08 years guarantee period beyond warranty
period. – Model: BH60M, Make- BEML.
Basic Ex-works price for equipment 16 nos 20660000.00 330560000.00
Packing & Forwarding charges 0.00 0.00
Freight charges 403603.95 6457663.20
Transit Insurance 3936.00 62976.00
Landed price of Equipment without GST 2,10,67,539.95 33,70,80,639.20
Add: GST @28% 58,98,911.19 9,43,82,578.98
Landed price of Equipment with GST 2,69,66,451.14 43,14,63,218.18
Spares and consumables during Warranty Period:
Basic FOR destination price for spares and
16 sets 335535.00 5368560.00
consumables during warranty period without NPV
2
Add: GST as quoted on cost of warranty spares & 16
75753.30 1212052.80
consumables without NPV Sets
Spares and Consumables for 07 years operation after Warranty period, to be supplied for the entire FLEET as one set
– Area-4
Sl Description QTY Total Value (Rs.)
st
Basic FOR destination price for spares and consumables for 1 year of
3 7285883.00
Guarantee period without NPV
st 1 Set
Add: GST as quoted for spares and consumables for 1 year of
1789584.24
Guarantee period without NPV
nd
Basic FOR Destination price for spares and consumables for 2 year of
4 17712358.00
Guarantee period without NPV
nd 1 Set
Add: GST as quoted for spares and consumables for 2 year of
4626260.24
Guarantee period without NPV
rd
Basic FOR Destination price for spares and consumables for 3 year of
5 35839582.00
Guarantee period without NPV
rd 1 Set
Add: GST as quoted for spares and consumables for 3 year of
9752970.56
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 4 year of
6 41977286.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 4 year of
11459808.08
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 5 year of
7 45275060.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 5 year of
12455666.00
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 6 year of
8 21992534.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 6 year of
5847408.72
Guarantee period without NPV
th
Basic FOR Destination price for spares and consumables for 7 year of
9 21397632.00
Guarantee period without NPV
th 1 Set
Add: GST as quoted for spares and consumables for 7 year of
5778123.66
Guarantee period without NPV
Total cost of spares and consumables for 08 years including GST
24,97,70,769.30
without NPV
Total cost of spares and consumables for 08 years excluding GST
19,68,48,895.00
without NPV
4
Landed price for the Fleet inclusive of spares and consumables for 08 years in INR Before ITC
68,12,33,987.48
without NPV for Area-4
Landed price for the Fleet inclusive of spares and consumables for 08 years in INR after ITC
53,39,29,534.20
without NPV for Area-4
Grand Total:
Total Landed price of all 04 Fleets inclusive of spares and consumables for 08 years in INR Before
166,35,04,956.34
ITC without NPV
Total Landed price of all 04 Fleets inclusive of spares and consumables for 08 years in INR after
130,38,39,161.98
ITC without NPV
Salient Terms and Conditions of the Supply Order to be placed on M/s BEML Limited shall be as under:
1. Basis of Price: The above unit basic prices of Equipment and Spares & Consumables are FIRM and
for supply on FOR destination basis, inclusive of packing & forwarding charges. Freight charges and
Transit Insurance charges shall be paid extra on Equipment as indicated below, and are inclusive for
Spares & Consumables. Supplier shall be responsible for safe delivery of material up to destination.
3. Freight Charges shall be payable extra @ Rs. 4,01,619.60 per Equipment for Area-1, @
Rs.4,01,567.59 per Equipment for Area-2, @ Rs.4,01,614.60 per Equipment for Area-3 and @
Rs.4,03,603.95 per Equipment for Area-4; excluding GST or at actual whichever is lower against
documentary evidence. Freight charges for Spares & Consumables are inclusive in its basic prices.
4. Transit Insurance shall be payable extra @ Rs.3936.00per Equipment for Area-1, Area-2, Area-3 and
Area-4 excluding GST or at actual, whichever is lower, against documentary evidence. Transit
Insurance charges are inclusive in basic prices.
5. IGST: IGST as applicable shall be paid extra on the value of taxable supply pertaining to the goods to
be supplied. Current applicable rate for Equipment is@ 28% and the current applicable rate for Spares
& consumables is 18%/28% as quoted in the Offer.
The Tax Invoice raised by the supplier must be in compliance of relevant GST Act,Rules &Notifications
made thereunder and should bear the MCL’s GST Registration no.21AABCM5188P1Z3. The rate and
amount of IGST related to supply of goods, shall be shown separately in tax invoice for each item of
supply. In case the bidder has opted for composition levy, the Bill of supply shall be raised by him in
compliance of relevant GST Act, Rules &Notifications made there under.
If MCL fails to claim Input Tax Credit (ITC) on eligible Inputs and capital goods or the ITC claimed is
disallowed due to failure on the part of supplier of goods and services in incorporating the tax invoice
issued to MCL in its relevant return of GST, (i.e. payment of IGST shown in tax invoice to the tax
authorities, issue of proper tax invoice or any other reason whatsoever), the applicable taxes & cess
paid based on such Tax invoice shall be recovered from the current bills or any other dues of the
supplier.
NOTE: “For Items supplied on Free of Cost basis, any liability of taxes shall be of M/s BEML Ltd”
Statutory variation: if there is any statutory change in IGST within contractual delivery period, the
same shall be admissible and will be paid at actual based on the documentary evidence. However, no
upward revision in the same beyond original delivery period shall be admissible.
GST on Liquidated Damages deducted against supplies and EMD / Security Deposit / Performance
Guarantee forfeited against tenders / supplies shall be borne by bidder / supplier.
6. Delivery:
6.1 For Equipment along with first year Warranty Spares and consumables for all 04 Areas:
To supply six (06) nosDumpers 60T along with first year Warranty Spares and Consumables within 07
months from the date of receipt of supply order and thereafter @ six (06) nos Dumpers 60T per month
along with first year Warranty Spares & Consumables on FOR destination basis. However, early supply
is also accepted.
5
6.2 Spares & consumables for the Guarantee period of 07 years beyond warranty period(Starting
after warranty period of Equipment):To supply Spares &Consumables for each year of Guarantee
period in minimum two (02) lots. However, successful bidder will have to supply the Spares
&Consumables well in advance to ensure that Spares & Consumables required during guarantee period
of Equipment are available as and when required to ensure guaranteed availability of the Equipment as
per NIT / Order provision.
7. Payment Terms:
7.1 Payment terms for Equipment :
Payment of 80% basic cost of equipment and 100% taxes, duties, freight & insurance shall be made
through e-Payment within 21 days of receipt and acceptance of equipment at consignee’s end or
submission of bill along with all requisite / relevant documents whichever is later and receipt &
acceptance of Performance Bank Guarantee by the order placing authority. Payment of balance 20%
basic cost of equipment shall be made within 21 days of successful commissioning of equipment.
Note: Payment of Rs.13.00 Lakhs/Equipment (Total Rs.507.00 Lakhs for 39 Equipments) shall be
retained from the value of equipment supplied and the same shall be released against the
receipt and acceptance of 6 nos. additional tyresagainst each equipment as per terms of
NIT/Order.
9. Consignee& Allocation:-
Item SN Qty Consignee & Allocation
Area-1 11Nos Depot Officer, Regional Stores, MCL, Ib-Valley Area, P.O. – Brajrajnagar-768216, Distt –
Jharsuguda (Orissa); Nr. Railway Station – Brajrajnagar (ECoR). Allocation – LajkuraOCP –
03nos; Samleswary OCP – 08nos
Area-2 02nos Depot Officer, Regional Stores, MCL, BasundharaGarjanbahal Area, P.O. – Balinga, Distt –
Sundargarh - 770076 (Orissa); Nr. Railway Station – Brajrajnagar (ECoR). Allocation –
Basundhara (W) OCP – 02nos
Area-3 10nos Depot Officer, Regional Stores, MCL, Bharatpur Area, Near Bharatpur CHP, P.O. – Balanda,
Talcher, Distt – Angul - 759116 (Orissa). Allocation – BharatpurOCP – 10nos
Area-4 16nos Depot Officer, Regional Stores, MCL, Jagannath Area, P.O. – Balanda, Talcher, Distt – Angul -
759116 (Orissa); Nr. Rly Stn.-Talcher. Allocation – Ananta OCP – 08nos; Jagannath OCP –
08nos
The warranty shall cover for total equipment so that ultimate responsibility lies only with the
Equipment Bidder although components may be supplied by different suppliers to the Bidder.
In case any tyre is found to be defective. it will be intimated immediately to the supplier to arrange for
inspection. If after examination any tyre is found warrantable, then supplier shall replace the defective
tyre with a new tyre at purchase order price after providing compensation on pro rata based on the
estimated balance life of defective tyres as per following formula:
Compensation = (B/A) x C
6
Where,
A = Original tread depth of the tyre
B = remaining tread depth when the tyre fails.
C = Landed cost of the tyre as per purchase order as considered for furnishing PBG.
Warranty replacement with a new tyre at purchase order price after providing compensation on pro
rata basis, as per the above formula, should be completed within one month from the date of claim for
indigenous tyres. The tyre so replaced shall also carry a warranty period as defined above. Safe
delivery of the replaced tyre to the consignee’s end will be the responsibility of the supplier. The
consignee will render help to the supplier, if required by them.
10.2.B Guarantee
a. The Supplier shall guarantee that the Equipment supplied pursuant to the Contract shall be
available to the Purchaser at the level hereinafter defined to perform to criteria of not less than that
defined in the Technical Specifications incorporated in the Contract.
b. The Supplier shall guarantee that the Equipment shall be available to perform its duty to minimum
criteria and to the minimum availability percentage level as defined in the individual Equipment
Specifications included as the Attachment to the Technical Specifications. The method of assessment
applied shall be as follows:
Method of Assessment:
Downtime shall also specifically include all hours lost due to failures determined to be guarantee
failures.
The Supplier shall state the number of hours per day required to carry out (i) and (ii) above. The time
stated shall, with the agreement of the Purchaser, form the basis of the assessment of the availability.
The Purchaser will assist the Supplier, without relieving the Supplier of any other obligations under
the Contract, to achieve the guaranteed availability by:
7
• Providing normal and proper maintenance, including preventative maintenance in
accordance with the Supplier’s standard/published recommendations, and making all
necessary repairs using only genuine manufacturer's spares.
• Providing co-operation to all Suppliers’s authorised representatives, complying with all
reasonable procedural suggestions to improve efficiency of machine operation or reduce
downtime.
• Where appropriate, providing and maintaining such conditions as:
· Proper electrical Supply
· Terrain Area
· Bench preparation
· Reasonable floor conditions
• Providing all Supplier’s authorised representatives access at all reasonable times to the
machine service and repair facilities.
Maintaining a log-book for each shift wherein the working hours, breakdown times,maintenance
hours, idle time, etc. shall be recorded. This record will be available forexamination and signature by
the Supplier’s representative.
11. Pre dispatch Inspection: Pre-despatch inspection of materials at supplier’s premises shall be carried
out by Chief Manager (Excavation) /EED Bangalore under intimation to General Manager (Excavation),
CIL Hq. In case the materials are rejected on first inspection, all charges, boarding, lodging, TA,
inspection fee etc. for subsequent inspection shall be borne by the supplier.
12. Final Inspection: Final inspection of materials shall be carried out at the consignee’s end before
acceptance of materials by SO (EXcv) of the concerned area. The purchaser shall at its discretion have
the right to test the supplied materials in any Government testing laboratory. The sample of materials
used for testing shall be on Supplier’s account. If the test shows that the materials are conforming to the
specification, the supplied materials shall be accepted and the testing charges shall be borne by the
department. However, if the test shows that the materials are not conforming to the specifications, the
supplied materials shall not be accepted and the testing charges shall be borne by the Supplier and the
materials shall be removed and replaced by the supplier.
8
13. Security Deposit: Exempted being a PSU.
14. Performance Guarantee: 10% of Landed Value of the order i.e. Rs.16,63,50,600.00 as per NIT
Provision in the form of Bank Guarantee. [i.e. Rs.42,65,400.00 per machine (rounded-off to next
hundred)].
15. All Other Terms and Conditions including Pre-contract Integrity Pact, Technical Specification, Price
Certificate, Liquidated Damage, Price Fall Clause, Force Majeure, Risk Purchase, Arbitration etc shall
be incorporated in the supply order as per NIT / offer.