Q: Miss Olulu has a rechargeable lamp fan manufacturing factory situated at Ogume, Delta State. On a daily basis, 630 rechargeable fans are manufactured on an 8 hours working day. The following table illustrates the tasks, their precedence relationships and their time requirements. Tasks Precedence Relationship Time - 8.68 0.15 B 0.25 0.30 0.35 E 8.58 0.55 The actual number of work stations obtained is e OAnmMoAoD. TNTOAOOD: Select one: a3 b.4 Q: Which of the following best describe Job sequencing problem Select one: a. ordering of jobs b. Time of Job c. Processing of jobs d. Quantification of jobs Q: A game is said to be fair if Select one: a. upper value is more than lower value of the game values of the c. upper value is less than lower value of the game d. upper and lower values of the game are not equal