Professional Documents
Culture Documents
34%
Value $49,700,000 $16,898,000
AT $0 $0 $0
Bob Cook $1,800,000 $1,800,000 $1,800,000
DiCarpegna $1,800,000 $1,800,000 $1,800,000
Hatfield $500,000 $500,000 $500,000
$4,100,000 $4,100,000 $4,100,000
Rent $0
Michaela $0
$16,000,000 $17,000,000 Robert $2,000
5% 5% Utilties $0
8% 8% Product $0
3% 3% Misc $0
$800,000 $850,000
$1,280,000 $1,360,000 Month $2,000
$720,000 $765,000 Annual $24,000
$2,800,000 $2,975,000
Annual Overhead
$13,200,000 $14,025,000
CT $60,000
$5,500,000 $5,500,000 Carlos $36,000
$500,000 $500,000 AT $60,000
$166,000 $166,000 Bella $0
$130,000 $130,000 Benefits $0
$2,000,000 $3,000,000 Ofc Hermo - Rent $13,200
$495,000 $495,000 Ofc Tucson - Rent $0
$95,000 $95,000 House SC - Rent $25,600
Ofc Hermo - Util $1,500
$94,000 $94,000 Ofc Tucson - Util $0
$0 $0 House SC - Util $3,000
Travel $0
Cell $6,000
Ofc Supplies $0
$8,980,000 $9,980,000 Legal $6,000
Cars $43,000
$4,220,000 $4,045,000 Biscuit $24,000
Total $278,300
$0 $0
$1,800,000 $1,800,000
$1,800,000 $1,800,000
$500,000 $500,000
$4,100,000 $4,100,000
$120,000 -$55,000
Supplies
$10,000
$60,000
$36,000
$60,000
$0
$0
$13,200
$0
$31,000
$1,500
$0
$3,000
$0
$6,000
$0
$6,000
$216,700
LAS PALMAS 2017
1300
HAS ACS
1904 4705
83 205
259 640
2246 5550
$22,128.23 $8,955.17
Interest 0% $0 $0
$12,368,050 $12,368,050
$12,481,950 $12,481,950
AT -$1,800,000 -$1,800,000
Bob Cook -$1,500,000 -$1,500,000
DiCarpegna -$1,800,000 -$1,800,000
Hatfield -$500,000 -$500,000
-$5,600,000 -$5,600,000
$6,881,950 $6,881,950
Rent $800
Robert $700 $1,000
Michaela
Cell $440 $450
Bus. Prop Tax
Bus. Supply $0
Bus. Lic. Fee
Tax
Med. Past Due $0
CC $0 $0
TEP $0
G
Dining
Bakers Mobile
Carlos $300 $0
Mom $0 $450
Ins
Medical
Dentist
CT $550
Bijou
Wedding Gif
Hotel Denver
MGX Copy
San Carlos $3,200
$1,990 $5,900
$7,890
$ -
2
HAS ACS
1904 4705
83 205
259 640
2246 5550
$33,704 $13,640
$75,700,000 $75,700,000
50.0% 50.0%
$37,850,000 $37,850,000
$0 $0
$5,500,000 $5,500,000
$500,000 $500,000
$166,000 $166,000
$5,344,550 $5,344,550
$1,370,500 $1,370,500
$192,500 $192,500
$13,073,550 $13,073,550
$24,776,450 $24,776,450
-$1,800,000 -$1,800,000
-$1,500,000 -$1,500,000
-$1,800,000 -$1,800,000
-$500,000 -$500,000
-$5,600,000 -$5,600,000
$19,176,450 $19,176,450
$19,176,450 $19,176,450
Jan
Interest Best Good OK
AT $ 1,300,000 $ 300,000 $ -
Bob Cook $ 1,400,000 $ 800,000 $ -
DiCarpegna $ 1,800,000 $ 800,000 $ -
Hatfield $ 500,000 $ 500,000 $ -
$ 5,000,000 $ 2,400,000 $ -
JV/ACQUISITION $ 15,000,000
DEVELOPMENT COSTS:
Engineering & Design $ 5,344,550
Infrastructure $ 98,338,101
REVENUE ( OPERATIONAL)
Operating Revenue $ 3,224,960
Maintenance & Servicing $ (2,555,771)
VILAGE / TOWNCENTERS
Unit / POD Type Lot/Pad Size Acs / Village Total Lots Total Acreage
Avg Sqft/Unit Build Cost / Sqft. Sell Price / Sqft. Avg Home Price
Lot Revenue
29%
1%
6%
1%
2%
0%
0%
5%
0%
15%
1.18%
1.18%
0.63%
0.76%
4%
1%
1%
1%
1%
4%
22%
9%
30%
52%
29%
1081
Profit / Sqft. Profit / Unit Revenue
Build Revenue
$ 138,040,000
$ 111,150,000
$ 97,240,000
$ 84,240,000
$ 48,600,000
$ 36,816,000
$ 31,152,000
$ 25,344,000
$ 572,582,000
DETAIL OF SALES
# UNITS SALES NET CONST 2017 2018 2019 2020 2021 2022
$ 1,807,277 $ 1,807,277
$ 1,807,277 $ 1,807,277
100%
$ 64,260,000
$ 34,580,000
$ 37,026,000
$ 30,240,000
$ 166,106,000
242
$ 19,958,400
$ 13,593,600
$ 12,564,640
$ 9,216,000
$ 55,332,640
$ 472
$ 6,634,616
$ 5,769,231
$ 3,835,925
$ 4,486,154
$ 20,725,926
$ 6,634,616
$ 4,615,385
$ 3,682,488
$ 5,607,693
$ 20,540,181
$ 262,704,747
$ 88,379,711
$ 11,277,619
$ 99,657,330
$ 18,072,767
$ 18,072,767
$ 380,434,844
PROFORMA INCOME
ANEGADOS 2018-2032
Sales Absorption
# Units Sold 57 71 100
Sales Revenue
Coastal / Large Lots 13,288,480 16,610,600 23,254,840
Mid / Small Lots 4,426,611 5,533,264 7,746,570
POD A - D 5,181,481 5,181,481 5,181,481 5,181,481
POD E - H 5,135,045 5,135,045 5,135,045 5,135,045
Gross Revenue - Lots 10,316,527 10,316,527 28,031,618 32,460,391 31,001,410
Total Revenue - Lots & Features 32,411,454 36,929,646 67,729,633 58,169,872 32,808,686
Hotel Revenue
Hotel - Condo Revenue 1,490,327
Development Costs
G & A Expenses
Project Management 515,000 515,000 515,000 515,000
Employee Benefits 30,000 30,000 30,000 30,000
Payroll Taxes
Tucson- San Carlos Ofc. / Leases 60,000 60,000 60,000 60,000
PROFORMA INCOME
ANEGADOS 2018-2032
Utilities 2,500 2,500 2,500 2,500
Repairs and maintenance
Insurance 0 0 0 0
Travel 20,000 20,000 20,000 20,000
Telephone 6,000 6,000 6,000 6,000
Postage
Office supplies / IF 7,500 2,500 2,500 2,500
Advertising
Marketing / Promotion 0 0 0 0
Professional Fees 24,000 24,000 24,000 24,000
Training and Development
Bank charges
Depreciation
Interest Expense
Other (contingency)
Total G & A Expenses (665,000) (660,000) (660,000) (660,000) 0 0 0
VAT Taxes
Net Income (Loss) Before IT (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363
Cumulative Net Income (Loss) Before IT (3,604,503) (6,669,550) (26,759,421) (82,985,599) (52,924,929) (11,292,272) 28,499,091
Net Income (Loss) Before IT (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363
Cash From Operations (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363
FINANCING ACTIVITIES -
TOTAL DEBT PAYMENTS (15,000,000) (800,000) (1,791,537) (7,552,581) (7,552,581) (7,552,581) (7,552,581)
Cash from Financing Activities 1,000,000 18,208,463 52,447,419 (7,552,581) (7,552,581) (7,552,581)
Distributions (8,708,500)
Net Cash Flow (3,604,503) (3,065,048) (1,881,408) (3,778,759) 22,508,089 34,080,076 32,238,782
Cummulative Net Cash (11,313,003) (14,378,050) (16,259,458) (20,038,218) 2,469,871 36,549,947 68,788,729
SUMMARY:
Beginning Cash 16,000,000 3,686,998 621,950 (1,259,458) (5,038,218) 17,469,871 51,549,947
Cash Flow (3,604,503) (3,065,048) (1,881,408) (3,778,759) 22,508,089 34,080,076 32,238,782
Contributions
Distributions (8,708,500)
Ending Cash 3,686,998 621,950 (1,259,458) (5,038,218) 17,469,871 51,549,947 83,788,729
IRR CALCULATION:
78.06% (3,604,503) (3,065,048) (1,881,408) (3,778,759) 22,508,089 34,080,076 32,238,782
PROFORMA INCOME
ANEGADOS 2018-2032
Sales Absorption
# Units Sold 57 71 100
Sales Revenue
Coastal / Large Lots 13,288,480 16,610,600 23,254,840
Mid / Small Lots 4,426,611 5,533,264 7,746,570
POD A - D 5,181,481 5,181,481 5,181,481 5,181,481
POD E - H 5,135,045 5,135,045 5,135,045 5,135,045
Gross Revenue - Lots 10,316,527 10,316,527 28,031,618 32,460,391 31,001,410
Total Revenue - Lots & Features 32,411,454 36,929,646 67,729,633 58,169,872 32,808,686
Hotel Revenue
Hotel - Condo Revenue 1,490,327
Development Costs
G & A Expenses
Project Management 515,000 515,000 515,000 515,000
Employee Benefits 30,000 30,000 30,000 30,000
Payroll Taxes
Tucson- San Carlos Ofc. / Leases 60,000 60,000 60,000 60,000
PROFORMA INCOME
ANEGADOS 2018-2032
Utilities 2,500 2,500 2,500 2,500
Repairs and maintenance
Insurance 0 0 0 0
Travel 20,000 20,000 20,000 20,000
Telephone 6,000 6,000 6,000 6,000
Postage
Office supplies / IF 7,500 2,500 2,500 2,500
Advertising
Marketing / Promotion 0 0 0 0
Professional Fees 24,000 24,000 24,000 24,000
Training and Development
Bank charges
Depreciation
Interest Expense
Other (contingency)
Total G & A Expenses (665,000) (660,000) (660,000) (660,000) 0 0 0
VAT Taxes
Net Income (Loss) Before IT (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363
Cumulative Net Income (Loss) Before IT (3,604,503) (6,669,550) (26,759,421) (82,985,599) (52,924,929) (11,292,272) 28,499,091
Net Income (Loss) Before IT (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363
Cash From Operations (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363
FINANCING ACTIVITIES -
TOTAL DEBT PAYMENTS (15,000,000) (800,000) (1,791,537) (7,552,581) (7,552,581) (7,552,581) (7,552,581)
Cash from Financing Activities 1,000,000 18,208,463 52,447,419 (7,552,581) (7,552,581) (7,552,581)
Distributions (8,708,500)
Net Cash Flow (3,604,503) (3,065,048) (1,881,408) (3,778,759) 22,508,089 34,080,076 32,238,782
Cummulative Net Cash (11,313,003) (14,378,050) (16,259,458) (20,038,218) 2,469,871 36,549,947 68,788,729
SUMMARY:
Beginning Cash 16,000,000 3,686,998 621,950 (1,259,458) (5,038,218) 17,469,871 51,549,947
Cash Flow (3,604,503) (3,065,048) (1,881,408) (3,778,759) 22,508,089 34,080,076 32,238,782
Contributions
Distributions (8,708,500)
Ending Cash 3,686,998 621,950 (1,259,458) (5,038,218) 17,469,871 51,549,947 83,788,729
IRR CALCULATION:
78.06% (3,604,503) (3,065,048) (1,881,408) (3,778,759) 22,508,089 34,080,076 32,238,782
PROFORMA COST DETAIL
Engineering
Infrastructure Construction
Off Site Primary - Infrastructure Costs 6,590,227 6,559,127
On Site Primary - Infrastructure Costs 5,482,458 10,864,258
On Site Secondary - Infrastructure Costs 9,549,130 12,580,140
Total 21,621,815 30,003,526
Electrical
Electrical Transmission & Distribution Substations 1,842,500 3,685,000
Telecommunication 650,000 650,000
Energy Feature - 18 MegaWatts Solar Facility 21,208,857 42,417,714
Total 23,701,357 46,752,714
Uilities
Biokinetic Waste Treatment Systems ( 38 Units ) 990,000 990,000
Waste Treatment Facility (MBR Waste Plant) 648,300 1,105,600
Desalination Plant (3.65 x 1M GPD) 4,934,600 12,524,700
Water Storage & Distribution System 2,374,000 5,935,000
Total 8,946,900 20,555,300
Fees / Permits
Permits 298,073 1,026,561
Total 298,073 1,026,561
RESORT AMENITIES
Commercial Features
Medical / Surgical Center 6,379,783 6,379,783
Office / Retail Center 2,088,844 4,177,688
Research Center / Facilities 1,972,110 3,944,220
Total 10,440,737 14,501,691
Environmental Features
Percent of Total
Development Master Plan Costs Project Costs Planning & Design
Total Architectural Plan $ 1,052,000 100% $ 1,052,000 Project Total As % of Construction Cst
GN ENGINEERING - DESAL / SOLAR / WASTE
$ 613,000 100%
TS
GRADING & PAVING (Onsite) 1 5,280 GRADING & PAVING (Onsite) 1 5,280
1 43,560 Km 2.19 Km 7.16
Roadway (Primary) 7,216 LF Mi 1.37 Roadways (Secondary) 23,616 LF Mi 4.47
GRADING & PAVING (Coastal Road) 1 5,280 GRADING & PAVING (Coastal Road) 1 5,280
1 43,560 Km 4.37 Km 3.18
Roadway (Primary) 14,433 LF Mi 2.73 Roadways (Secondary) 10,500 LF Mi 1.99
Clearing / Grubbing - 75' CS 24.85 AC $ 1,250 $ 31,063 Clearing / Grubbing - 64' CS 15.43 AC $ 1,250 $ 19,284
Rough Grading - 45' CS 649,485 SQFT $ 0.25 $ 162,371 Rough Grading - 32' CS 336,000 SQFT $ 0.25 $ 84,000
Subgrade 1/10th grade AB 4" - 45' CS 649,485 SQFT $ 0.35 $ 227,320 Subgrade 1/10th grade AB 4" - 32' CS 336,000 SQFT $ 0.35 $ 117,600
Paving 2.5" AC - 48' CS 649,485 SQFT $ 2.25 $ 1,461,341 Paving 2" AC - 32' CS 336,000 SQFT $ 2.25 $ 756,000
Thickened Edge 14,433 LF $ 0.35 $ 5,052 Thickened Edge 10,500 LF $ 0.35 $ 3,675
Water Adjustments 10 SF $ 125 $ 1,250 Water Adjustments 12 SF $ 125 $ 1,500
Hydrants Markers 3 SF $ 52 $ 156 Hydrants Markers 6.00 SF $ 52 $ 312
Survey Monuments 3 SF $ 240 $ 720 Survey Monuments 6.00 SF $ 240 $ 1,440
CONCRETE, CULVERTS & RIP RAP (Onsite) CONCRETE, CULVERTS & RIP RAP (Onsite)
Excavation - Waterline Trench 7,216 LF $ 14 $ 101,024 Excavation - Waterline Trench 23,616 LF $ 12 $ 283,392
Waterline PVC Sched. 40 8" & 12" 7,216 LF $ 22 $ 158,752 Waterline PVC Sched. 40 6" & 8" 23,616 LF $ 20 $ 472,320
Hydrant Lines 866 LF $ 19 $ 16,236 Hydrant Lines 2,834 LF $ 19 $ 53,136
Service Lines 1,588 LF $ 14 $ 22,225 Service Lines 5,196 LF $ 14 $ 72,737
Sand / Backfill 7,216 LF $ 3 $ 23,452 Sand / Backfill 23,616 LF $ 3 $ 76,752
Test 1 LSUM $ 4,200 $ 4,200 Test 1 LSUM $ 12,600 $ 12,600
Barricades 1 LSUM $ 3,500 $ 3,500 Barricades 1 LSUM $ 9,500 $ 9,500
Electric / Tel. Trench / Pads / Conduit 4" 7,216 LF $ 18 $ 127,002 Electric / Tel. Trench / Pads / Conduit 4" 23,616 LF $ 18 $ 415,642
Install 2.5" Primary Electric Line 7,216 LF $ 5 $ 32,472 Install 2.5" Primary Electric Line 23,616 LF $ 5 $ 106,272
Transformers 11 EA $ 1,250 $ 13,750 Transformers 27 EA $ 1,250 $ 33,750
Test 1 EA $ 4,200 $ 4,200 Test 1 EA $ 11,600 $ 11,600
Excavation - Sewer Trench 7,216 LF $ 28 $ 202,048 Excavation - Sewer Trench 23,616 LF $ 28 $ 661,248
Sewer 8" & 12" PVC Pipe / Backfill 1,200 LF $ 25 $ 30,000 Sewer 6" & 8" PVC Pipe / Backfill 13,500 LF $ 35 $ 472,500
Sewer 8" & 12" DIP/ Backfill 1,000 LF $ 35 $ 35,000 Sewer 6" & 8" DIP / Backfill 1,500 LF $ 35 $ 52,500
Manholes / Cleanouts 7 EA $ 2,300 $ 16,100 Manholes / Cleanouts 14 EA $ 2,300 $ 32,200
MISC.(Onsite) MISC.(Onsite)
Multi Use Trail / Ped (graded) 60,000 LF $ 12 $ 720,000 Multi Use Trail / Ped (graded) 30,000 LF $ 12 $ 360,000
Const. Fencing / Signage / Run Off 6 LSUM $ 3,500 $ 21,000 Const. Fencing / Signage / Run Off 4 LSUM $ 3,500 $ 14,000
Retention / Detention Basins 25,000 SQFT $ 5 $ 131,250 Retention / Detention Basins 12,500 SQFT $ 5 $ 65,625
Landscaping (ROW) 20 LSUM $ 2,750 $ 55,000 Landscaping (ROW) 30 LSUM $ 2,750 $ 82,500
5' Wall / Fencing / Drainage 12,500 LF $ 8 $ 100,000 5' Wall / Fencing / Drainage 5,000 LF $ 8 $ 40,000
Stripping 7,216 LF $ 1 $ 10,463 Stripping 23,616 LF $ 1 $ 34,243
Signage 50 EA $ 175 $ 8,750 Signage 70 EA $ 175 $ 12,250
Entry Feature / Gate / Guard House 1 LSUM $ 85,000 $ 85,000 Entry Feature / Gate 6 LSUM $ 75,000 $ 450,000
Subtotal $ 3,217,062
Subtotal $ 1,659,472
Subtotal $ 1,206,410
MISC. (Offsite)
Subtotal $ 507,283
Rough Grading - PADS Phase II & III 1,599,620 SQYD $ 0.27 $ 431,897
Subtotal $ 3,163,133
GRADING & PAVING (Coastal Road) 1 5,280 GRADING & PAVING (Coastal Road)
1 43,560 Km 4.37
Roadway (Primary) 14,433 LF Mi 2.73 Roadways (Secondary)
Rough Grading - 45' CS 649,485 SQFT $ 0.25 $ 162,371 Rough Grading - 28' CS
Finish Subgrade 1/10th AB 4" - 30 CS 432,990 SQFT $ 0.35 $ 151,547 Finish Subgrade 1/10th grade AB 4" -
Paving 2.5" AC - 30' CS 432,990 SQFT $ 2.25 $ 974,228 Paving 2.5" AC - 24' CS
Thickened Edge 14,433 LF $ 0.35 $ 5,052 Thickened Edge
Water Adjustments 10 SF $ 125 $ 1,250 Water Adjustments
Hydrants Markers 3 SF $ 52 $ 156 Hydrants Markers
Survey Monuments 3 EA $ 240 $ 720 Survey Monuments
Subtotal $ 1,316,031
CONCRETE, CULVERTS & RIP RAP (Onsite) CONCRETE, CULVERTS & RIP RAP (On
Subtotal $ 3,253,817
Electric / Tel. Trench / Pads / Conduit 4" 19,024 LF $ 18 $ 334,822 Electric / Tel. Trench / Pads / Conduit
Install 2.5" Primary Electric Line 19,024 LF $ 4.50 $ 85,608 Install 2.5" Primary Electric Line
Transformers 23 SF $ 1,250 $ 28,750 Transformers
Test 1 SF $ 5,500 $ 5,500 Test
Transmission & Distribution Substations See Cost Detail Transmission & Distribution Substatio
Subtotal $ 1,982,692
MISC.(Onsite) MISC.(Onsite)
Multi Use Trail / Ped (graded) 60,000 LF $ 12 $ 720,000 Multi Use Trail / Ped (graded)
Construction Fencing / Signage / Run Off 6 LSUM $ 3,500 $ 21,000 Construction Fencing / Signage / Run
Retention / Detention Basins 25,000 SQFT $ 5 $ 131,250 Retention / Detention Basins
Landscaping (ROW) 20 LSUM $ 2,750 $ 55,000 Landscaping (ROW)
5' Wall / Fencing / Drainage 12,500 LF $ 8 $ 100,000 5' Wall / Fencing / Drainage
Stripping 19,024 LF $ 1 $ 27,585 Stripping
Signage 50 EA $ 175 $ 8,750 Signage
Entry Feature / Gate / Guard House 1 LSUM $ 85,000 $ 85,000 Entry Feature / Gate
Subtotal $ 1,148,585
Subtotal $ 3,217,062
Subtotal $ 1,659,472
Subtotal $ 1,195,310
MISC. (Offsite)
Subtotal $ 487,283
1 5,280
Km 14.71
48,544 LF Mi 9.19
Subtotal $ 3,557,694
1 5,280
Km 3.18
10,500 LF Mi 1.99
Subtotal $ 744,666
Subtotal $ 2,445,322
N (Onsite - Secondary)
48,544 LF $ 12 $ 582,528
48,544 LF $ 20.00 $ 970,880
44 SF $ 2,400 $ 105,600
5,825 LF $ 19 $ 109,224
500 LF $ 475 $ 237,500
10,680 LF $ 14 $ 149,516
48,544 LF $ 3 $ 157,768
1 LSUM $ 5,500 $ 5,500
1 LSUM $ 3,500 $ 3,500
48,544 LF $ 24 $ 1,165,056
13,500 LF $ 20 $ 270,000
1,500 LF $ 30 $ 45,000
26 SF $ 2,300 $ 59,800
Subtotal $ 5,007,694
30,000 LF $ 12 $ 360,000
Signage / Run Off 4 LSUM $ 3,500 $ 14,000
12,500 SQFT $ 5 $ 65,625
30 LSUM $ 2,750 $ 82,500
5,000 LF $ 8 $ 40,000
48,544 LF $ 1 $ 70,389
70 EA $ 175 $ 12,250
4 LSUM $ 45,000 $ 180,000
Subtotal $ 824,764
Total $ 5,935,000
Total $ 3,685,000
TELECOMMUNICATIONS SYSTEM
Total $ 650,000
BOUTIQUE HOTEL-CONDO / SPA / BEACH CLUB
CONSTRUCTION DETAIL
Total Hotel- Condo Dev Costs $ 40,360,000 $ 597,525 $ 202 $ 7,115,278 $ 5,676,389
Total Beach Club Dev Costs $ 3,527,970 $ 435,299 $ 641 $ 413,449 $ 388,549
225,500 sf
ROOM DATA 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Number of Rooms 88 88 88 88 88 88 88 88 88 88 88 88 88 88
Number of Condo-Hotel Rooms in Program 35.0% 31 11 22 22 22 27 27 27 28 28 29 30 30 30
Annual Rooms Available 28,105 24,090 24,090 24,090 22,265 22,265 22,265 21,900 21,900 21,535 21,170 21,170 21,170
Annual Condo-Hotel Rooms Available 4,015 8,030 8,030 8,030 9,855 9,855 9,855 10,220 10,220 10,585 10,950 10,950 10,950
Paid Occupied Rooms - 8,913 9,154 9,395 8,906 9,351 9,797 9,855 10,950 11,306 11,125 11,136 11,136
Paid Occupied Condo-Hotel Rooms - 2,971 3,051 3,132 3,942 4,139 4,336 4,599 5,110 5,557 5,754 5,760 5,760
Paid Occupancy 0% 37% 38% 39% 40% 42% 44% 45% 50% 53% 53% 53% 53%
Average Room Rate 3.0% $165.00 $178.20 $187.11 $192.72 $198.50 $204.46 $210.59 $216.91 $223.42 $230.12 $237.03 $244.14 $251.46
RevPAR $0.00 $65.93 $71.10 $75.16 $79.40 $85.87 $92.66 $97.61 $111.71 $120.81 $124.56 $128.43 $132.28
REVENUE
Rooms $0 $1,588,350 $1,712,842 $1,810,655 $1,767,886 $1,911,968 $2,063,105 $2,137,666 $2,446,439 $2,601,727 $2,636,993 $2,718,819 $2,800,384
Condo-Hotel Rooms $0 $529,450 $570,947 $603,552 $782,507 $846,281 $913,178 $997,577 $1,141,672 $1,278,815 $1,363,962 $1,406,286 $1,448,474
Food 10% $0 $211,780 $228,379 $241,421 $255,039 $275,825 $297,628 $313,524 $358,811 $388,054 $400,096 $412,511 $424,886
Beverage 7% $0 $148,246 $159,865 $168,994 $178,527 $193,077 $208,340 $219,467 $251,168 $271,638 $280,067 $288,757 $297,420
Telecommunications 4% $0 $84,712 $91,352 $96,568 $102,016 $110,330 $119,051 $125,410 $143,524 $155,222 $160,038 $165,004 $169,954
Spa 30% $0 $535,274 $578,941 $613,812 $624,266 $680,222 $739,471 $775,973 $905,183 $981,932 $1,006,137 $1,037,579 $1,068,706
Rental & Other Income $0 $118,844 $122,056 $125,268 $128,480 $134,904 $141,328 $144,540 $160,600 $168,630 $168,799 $168,967 $168,967
TOTAL REVENUE $0 $3,216,656 $3,464,382 $3,660,269 $3,838,721 $4,152,607 $4,482,100 $4,714,156 $5,407,397 $5,846,018 $6,016,092 $6,197,924 $6,378,792
DEPARTMENTAL EXPENSES
Rooms - (16% of Rooms Revenue) 16% $0 $338,848 $365,406 $386,273 $408,063 $441,320 $476,205 $501,639 $574,098 $620,887 $640,153 $660,017 $679,817
Food & Beverage - (60% of F&B Revenues) 60% $0 $216,016 $232,947 $246,249 $260,140 $281,341 $303,581 $319,795 $365,987 $395,815 $408,097 $420,761 $433,384
Telecommunications - (60% of Tele Revenues) 60% $0 $50,827 $54,811 $57,941 $61,209 $66,198 $71,431 $75,246 $86,115 $93,133 $96,023 $99,003 $101,973
Spa - (22% of Spa Revenues) 18% $0 $96,349 $104,209 $110,486 $112,368 $122,440 $133,105 $139,675 $162,933 $176,748 $181,105 $186,764 $192,367
Rental & Other Income - (10% of Oth. Rev.) 10% $0 $11,884 $12,206 $12,527 $12,848 $13,490 $14,133 $14,454 $16,060 $16,863 $16,880 $16,897 $16,897
TOTAL DEPARTMENTAL EXPENSES $0 $713,925 $769,579 $813,476 $854,628 $924,790 $998,454 $1,050,808 $1,205,193 $1,303,446 $1,342,258 $1,383,441 $1,424,437
DEPARTMENTAL INCOME $0 $2,502,732 $2,694,804 $2,846,794 $2,984,093 $3,227,818 $3,483,646 $3,663,348 $4,202,204 $4,542,572 $4,673,834 $4,814,483 $4,954,355
TOTAL UNDISTRIBUTED OPERATING EXPENSES $0 $675,498 $727,520 $768,657 $806,131 $872,048 $941,241 $989,973 $1,135,553 $1,227,664 $1,263,379 $1,301,564 $1,339,546
INCOME AFTER UOE $0 $1,827,234 $1,967,283 $2,078,137 $2,177,961 $2,355,770 $2,542,405 $2,673,375 $3,066,651 $3,314,908 $3,410,455 $3,512,919 $3,614,809
FIXED CHARGES
Property Taxes 1% $0 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167
Insurance - (% of Revenues) 1.2% $0 $38,600 $39,372 $40,159 $40,962 $41,782 $42,617 $43,470 $44,339 $45,226 $46,130 $47,053 $47,994
Restaurant Lease Income $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Spa Lease Income $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Reserves for Replacement - (1% - 3% of Rev.) $0 $32,167 $34,644 $36,603 $76,774 $83,052 $89,642 $94,283 $108,148 $116,920 $120,322 $123,958 $127,576
1.0% 1% 1% 1% 2% 2% 2% 2% 2% 2% 2% 2% 2%
TOTAL FIXED CHARGES $0 $102,933 $106,182 $108,929 $149,903 $157,000 $164,426 $169,919 $184,654 $194,313 $198,619 $203,178 $207,736
EBITDA $0 $1,724,301 $1,861,101 $1,969,208 $2,028,058 $2,198,770 $2,377,979 $2,503,456 $2,881,997 $3,120,595 $3,211,836 $3,309,741 $3,407,072
CONSTRUCTION DETAIL
8000 2015
MEDICAL FACILITIES 16 500
Total per key per sq ft Q1 Q2
Recovery Room Modules 8000 $ 720,000 $ 45,000 $ 90.00 $ 90,000 $ 90,000
Main Lobby 3000 $ 225,000 $ 14,063 $ 75.00 $ 157,500 $ 67,500
Circulation (9,200 per floor) 1333 $ 73,333 $ 4,583 $ 55.00 $ 9,167 $ 9,167
Site Development $ 40,810 $ 2,551 $ 3.71 $ 40,810
Builders risk insurance $ 18,810 $ 1,176 $ 1.71 $ 2,351 $ 2,351
Permitting $ 35,000 $ 2,188 $ 0.01 $ 35,000
Telecom Systems $ 39,710 $ 2,482 $ 3.61
Equipment $ 500,060 $ 31,254 $ 45.46
Supplies $ 183,480 $ 11,468 $ 16.68
Operating Systems $ 70,880 $ 4,430 $ 8.86
FF&E $ 181,760 11,360 $ 22.72
Contingency $ 62,665 $ 3,917 3.0% $ 7,833 $ 7,833
Developer Fee $ 41,777 $ 2,611 2.0% $ 5,222 $ 5,222
Q3 Q4 Q1 Q2 Q3 Q4
$ 90,000 $ 90,000 $ 90,000 $ 90,000 $ 90,000 $ 90,000 $ 720,000
$ 225,000
$ 9,167 $ 9,167 $ 9,167 $ 9,167 $ 9,167 $ 9,167 $ 73,333
$ 40,810
$ 2,351 $ 2,351 $ 2,351 $ 2,351 $ 2,351 $ 2,351 $ 18,810
$ 35,000
$ 15,884 $ 23,826 $ 39,710
$ 125,015 $ 125,015 $ 125,015 $ 125,015 $ 500,060
$ 45,870 $ 45,870 $ 45,870 $ 45,870 $ 183,480
$ 17,720 $ 17,720 $ 17,720 $ 17,720 $ 70,880
$ 45,440 $ 45,440 $ 45,440 $ 45,440 $ 181,760
$ 7,833 $ 7,833 $ 7,833 $ 7,833 $ 7,833 $ 7,833 $ 62,665
$ 5,222 $ 5,222 $ 5,222 $ 5,222 $ 5,222 $ 5,222 $ 41,777
$ -
$ 114,573 $ 114,573 $ 348,618 $ 348,618 $ 364,502 $ 372,444 $ 2,193,286
$ -
2015 2016
Q3 Q4 Q1 Q2 Q3 Q4
$ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 600,000
$ 5,625 $ 5,625 $ 5,625 $ 5,625 $ 5,625 $ 5,625 $ 45,000
$ 12,000 $ 12,000 $ 12,000 $ 12,000 $ 12,000 $ 60,000
$ 407,000
$ 60,000
$ 8,664 $ 12,996 $ 21,660
$ 412,500 $ 412,500 $ 412,500 $ 412,500 $ 1,650,000
$ 225,000 $ 225,000 $ 225,000 $ 225,000 $ 900,000
$ 20,790 $ 20,790 $ 20,790 $ 20,790 $ 83,160
$ 40,080 $ 40,080 $ 40,080 $ 40,080 $ 160,320
$ 14,952 $ 14,952 $ 14,952 $ 14,952 $ 14,952 $ 14,952 $ 119,614
$ 9,968 $ 9,968 $ 9,968 $ 9,968 $ 9,968 $ 9,968 $ 79,743
INCOME DETAIL
CALENDAR YEAR 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
Number of Recovery Rooms 16 16 16 16 16 16 16 16 16 16 16 16 16 16
Annual Rooms Available 5,840 5,840 5,840 5,840 5,840 5,840 5,840 5,840 5,840 5,840 5,840 5,840 5,840
Paid Occupied Rooms - 1,752 1,927 2,120 2,226 2,449 2,693 2,963 2,963 2,963 2,963 3,052 3,052
Paid Occupancy 0% 30% 33% 36% 38% 42% 46% 51% 51% 51% 51% 52% 52%
Average Rate 1.0% $185.00 $185.00 $194.25 $196.19 $198.15 $200.14 $202.14 $204.16 $206.20 $208.26 $210.34 $212.45 $214.57
RevPAR $0.00 $55.46 $64.06 $71.17 $75.47 $83.85 $93.16 $103.50 $104.54 $105.58 $106.64 $110.93 $112.04
REVENUE
Rooms $0 $324,120 $374,359 $415,912 $441,075 $490,034 $544,428 $604,860 $610,908 $617,017 $623,188 $648,302 $654,785
General Medical Procedures @ $450/per $450 $788,400 $867,240 $953,964 $1,001,662 $1,101,828 $1,212,011 $1,333,212 $1,333,212 $1,333,212 $1,333,212 $2,628,000 $1,373,209
Surgical Procedures @ $14.5K/per $7,500 $2,430,000 $2,673,000 $2,940,300 $3,087,315 $3,396,047 $3,735,651 $4,109,216 $4,109,216 $4,109,216 $4,109,216 $4,232,493 $4,232,493
Pharmaceutical @ $ 300/per $200 $64,800 $71,280 $78,408 $82,328 $90,561 $99,617 $109,579 $109,579 $109,579 $109,579 $112,866 $112,866
Food & Beverage 8% $0 $25,930 $29,949 $33,273 $35,286 $39,203 $43,554 $48,389 $48,873 $49,361 $49,855 $51,864 $52,383
Telecommunications 4% $0 $12,965 $14,974 $16,636 $17,643 $19,601 $21,777 $24,194 $24,436 $24,681 $24,928 $25,932 $26,191
TOTAL REVENUE $0 $3,646,214 $4,030,802 $4,438,494 $4,665,310 $5,137,275 $5,657,039 $6,229,451 $6,236,225 $6,243,067 $6,249,978 $7,699,458 $6,451,927
DEPARTMENTAL EXPENSES
Rooms - (16% of Rooms Revenue) 16% $0 $51,859 $59,897 $66,546 $70,572 $78,406 $87,109 $96,778 $97,745 $98,723 $99,710 $103,728 $104,766
Food & Beverage - (60% of F&B Revenues) 60% $0 $15,558 $17,969 $19,964 $21,172 $23,522 $26,133 $29,033 $29,324 $29,617 $29,913 $31,119 $31,430
Telecommunications - (60% of Tele Revenues) 60% $0 $7,779 $8,985 $9,982 $10,586 $11,761 $13,066 $14,517 $14,662 $14,808 $14,957 $15,559 $15,715
Surgery - (20% of Surgical Proceedures) 20% $0 $486,000 $534,600 $588,060 $617,463 $679,209 $747,130 $821,843 $821,843 $821,843 $821,843 $846,499 $846,499
Rental & Other Income - (0% of Other Rev.) 0% $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
TOTAL DEPARTMENTAL EXPENSES $0 $561,196 $621,451 $684,552 $719,792 $792,897 $873,438 $962,171 $963,574 $964,991 $966,423 $996,905 $998,409
DEPARTMENTAL INCOME $0 $3,085,019 $3,409,350 $3,753,942 $3,945,517 $4,344,377 $4,783,602 $5,267,280 $5,272,651 $5,278,076 $5,283,555 $6,702,553 $5,453,519
TOTAL UNDISTRIBUTED OPERATING EXPENSES $0 $2,042,523 $2,250,269 $2,476,103 $2,600,764 $2,861,792 $3,149,027 $3,465,104 $3,466,289 $3,467,487 $3,468,696 $4,295,520 $3,575,286
INCOME AFTER UOE $0 $1,042,496 $1,159,081 $1,277,839 $1,344,753 $1,482,586 $1,634,574 $1,802,176 $1,806,362 $1,810,589 $1,814,859 $2,407,033 $1,878,233
FIXED CHARGES
Property Taxes 1% $0 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462
Insurance - (% of Revenues) 1.8% $0 $65,632 $66,944 $68,283 $69,649 $71,042 $72,463 $73,912 $75,390 $76,898 $78,436 $80,005 $81,605
Reserve for Replacement - (1.0% - 5.0% of Rev.) $0 $72,924 $80,616 $88,770 $93,306 $102,745 $113,141 $124,589 $124,725 $124,861 $125,000 $153,989 $129,039
1.0% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
Total Fixed Charges $0 $175,018 $184,023 $193,515 $199,417 $210,250 $222,066 $234,963 $236,577 $238,222 $239,898 $270,456 $247,106
EBITDA $0 $867,477 $975,059 $1,084,324 $1,145,336 $1,272,336 $1,412,509 $1,567,213 $1,569,785 $1,572,368 $1,574,961 $2,136,577 $1,631,127
GRAND TOTALS
$ 15,111,933 $ 368,584 $ 141 $ 1,724,472 $ 1,251,371 $ 1,129,046 $ 1,129,046 $ 1,932,776 $ 2,870,776 $ 2,984,834 $ 2,089,613 $ 15,111,933
COMMERCIAL DEVELOPMENT
Annual Sq.Ft. Office Space Available 40% 13,382 13,382 13,382 13,382 13,382 13,382
Annual Sq.Ft. Retail Space Available 60% 20,074 20,074 20,074 20,074 20,074 20,074
Annual Sq.Ft. Research Space Available 100% 24,000 24,000 24,000 24,000 24,000 24,000
Annual Sq.Ft. Organic Farming Space Available 100% 50,000 50,000 50,000 50,000 50,000 50,000
REVENUE
DEPARTMENTAL EXPENSES
Rooms - (12% of Revenue) 6% $0 $29,106 $36,903 $41,405 $46,457 $52,124
Telecommunications - (60% of Tele Revenues) 60% $0 $4,545 $5,564 $6,242 $7,004 $7,858
FIXED CHARGES
Property Taxes 1% $0 $4,927 $6,243 $7,005 $7,860 $8,818
Insurance - (% of Revenues) 1.2% $0 $5,912 $6,030 $6,151 $6,274 $6,399
Reserves for Replacement - (1% - 3% of Rev.) $0 $9,853 $12,486 $14,010 $15,719 $17,637
0% 2% 2% 2% 2% 2%
TOTAL FIXED CHARGES $0 $20,692 $24,760 $27,166 $29,852 $32,855
CASH FLOW AFTER OTHER ITEMS $0 $345,708 $440,320 $494,655 $555,630 $624,057
$0 $0 $0 $0 $0 $0 $0
1 Seawater supply costing includes one weel for each two RO trains plus a spare, one concentrate disposal well and typical permitting fees
2 Pretreatment costing includes bag filtration, cartridge filtration, scale control and plant interconnecting piping
3 SWRO Process and Electrical includes controls and electrical switchgear for entire plant
4 Post treatment includes chemical feed system for pH adjustment, corrosion inhibitor addition, disinfection and alkalinity/hardness adjustment.
5 Pipeline costing assumes 2,100 feet of 18-inch diameter for feedwater and 2,100 feet of 12-inch HDPE for concentrate disposal.
6 Building budget assumes entire building is constructed at a unit cost of $ 115 per f2.
7 Project management includes equipment installation and commissioning.
8 Cost does not include IVA.
9 DBO is design, build and operate. Under this arrangement, plant and equipment would be purchase outright by Las Palmas and TSG/EWU would
operate for 10 years. Under TSG/EWU's operation and maintenance contract, TSG/EWU assumes 100% of the risk of operation, maintenance, repair and
replacement of the plant and in effect provides a full 10 year warranty on the plant. Under this arrangement, the owner insures the plant and pays the power
cost directly, and TSG/EWU's fees are adjusted annually for inflation but are otherwise fixed for the term of the arrangement.
10 Fixed cost includes labor, cartridge filter and SWRO membrane repalcement, G&A.
11 Variable fee includes chemicals, energy at annual average cost of $0.104 per KWH, lubricants, and part replacement.
Construction Costs
MWh Production
Revenue
Total $ 336,922.50
O Cart Paths $ 264,530.00
P Landscaping $ 272,500.00
Q Finish Grade $ 157,000.00
R Seedbed Preparation $ 780,185.00
Total $ 1,474,215.00
S Grassing $ 3,047,945.00
T Specialty Construction $ 315,000.00
U Clubhouse $ 2,000,000.00
V Workshop / Storage Facilities $ 750,000.00
X Gof Carts $ 500,000.00
Y Design / Architect
Total $ 6,612,945.00
TOTAL $ 12,536,541.01
$ 12,536,541.01
Total Total
Membership Annual Paid Revenue Total
Fees/Dues Rounds Round Revenue
$ - 0 $ - $ -
$ - 730 $ 32,850 $ 32,850
$ 2,999 1095 $ 54,750 $ 186,269
$ 7,711 1314 $ 72,270 $ 240,631
$ 15,422 1460 $ 80,300 $ 395,602
$ 26,775 1606 $ 88,330 $ 500,665
$ 35,343 1752 $ 96,360 $ 645,783
$ 42,840 1898 $ 123,370 $ 616,030
$ 49,266 2044 $ 132,860 $ 696,206
$ 53,550 2190 $ 142,350 $ 581,460
$ 53,550 2336 $ 151,840 $ 205,390
MARINA
Berth
Marina Services Building $ 750,000 Dock Length
Landscaping & Irrigation $ 56,500 A 40
Signage $ 30,000 B 40
Site Surveying & Engineering $ 122,000 C 50
Architectural & Engineering Fees $ 367,000 D 50
Project Management Fees $ 554,322 E 50
F 60
Entrance Channel $ 955,000 G 60
Turning Basin $ 2,250,000 H 70
Main Access Channel $ 1,256,000 I 70
North Breakwater $ 850,000 J 80
South Breakwater $ 745,000 K 80
Wave Absorber $ 475,000 L 90
Circulation Channels $ 458,000 M 90
Navigation Aids $ 248,000 N 100
Rock Work $ 652,000 O 100
Island Work $ 1,654,000 P 110
Q 110
Total Costs $ 19,879,125 R 130
S 150
T 150
U 170
V 170
W 190
X 210
Y 230
Z 250
ENUE
al base rate
Costs
Improvements & Facilities
Fencing $ 200,000
Facilities / Stables $ 850,000
Water System $ 184,000
Horses (10) $ 50,000
Saddles / Equipment (10) $ 55,000
Equipment
Pick-up Trucks (2) $ 50,000
Horse Trailers (2) $ 17,000
Manure Handling Equipment $ 50,000
Total $ 1,456,000
Total
OPERATING EXPENSES
Costs
Commercial Feed $ 1,451
Grass Hay $ 5,119
Salt & mineral $ 280
Bedding $1.00/stall/day $ 3,650
Hired labor (2) 2,000 hours @ $11.50 $ 46,000
Utilities $ 6,600
Equipment operating costs $ 3,900
Facilities repairs $ 3,450
Insurance $ 5,750
Operator labor (1) 2,000 hours @ $15.00 $ 30,000
Veterinary Care $ 15,000
Total $ 121,200
REVENUE
Total $ 167,280
Cost per No. of
Head Heads Total Cost
$ 145.09 10 $ 1,450.88
$ 511.91 10 $ 5,119.13
$ 6,570.00