IMBURSA

34%
Value $49,700,000 $16,898,000

Loan Amount $15,000,000 $15,000,000 $15,000,000


Broker Fees 8% 6% 5%
Bank - Cash 8% 8% 8%
Interest Rate - Annually 3% 3% 3%
Broker Fees $1,200,000 $900,000 $750,000
Bank - Cash $1,200,000 $1,200,000 $1,200,000
Total Interest - 24 Months $675,000 $675,000 $675,000
$3,075,000 $2,775,000 $2,625,000

Tiaga $11,925,000 $12,225,000 $12,375,000

Murray $5,500,000 $5,500,000 $5,500,000


82 Has $500,000 $500,000 $500,000
Attny - Hector $166,000 $166,000 $166,000
Attny - Max $130,000 $130,000 $130,000
Engineering $500,000 $1,000,000 $1,100,000
G&A $495,000 $495,000 $495,000
Closing Costs - Taxes/Fees $95,000 $95,000 $95,000

Orange $94,000 $94,000 $94,000


Geremiah $0 $0
CP $0 $0 $0
Misc. $0 $0 $0

Total $7,480,000 $7,980,000 $8,080,000

Reserve Funds $4,445,000 $4,245,000 $4,295,000

AT $0 $0 $0
Bob Cook $1,800,000 $1,800,000 $1,800,000
DiCarpegna $1,800,000 $1,800,000 $1,800,000
Hatfield $500,000 $500,000 $500,000
$4,100,000 $4,100,000 $4,100,000

Tiaga $345,000 $145,000 $195,000


SALE Biscuit

Rent $0
Michaela $0
$16,000,000 $17,000,000 Robert $2,000
5% 5% Utilties $0
8% 8% Product $0
3% 3% Misc $0
$800,000 $850,000
$1,280,000 $1,360,000 Month $2,000
$720,000 $765,000 Annual $24,000
$2,800,000 $2,975,000

Annual Overhead
$13,200,000 $14,025,000
CT $60,000
$5,500,000 $5,500,000 Carlos $36,000
$500,000 $500,000 AT $60,000
$166,000 $166,000 Bella $0
$130,000 $130,000 Benefits $0
$2,000,000 $3,000,000 Ofc Hermo - Rent $13,200
$495,000 $495,000 Ofc Tucson - Rent $0
$95,000 $95,000 House SC - Rent $25,600
Ofc Hermo - Util $1,500
$94,000 $94,000 Ofc Tucson - Util $0
$0 $0 House SC - Util $3,000
Travel $0
Cell $6,000
Ofc Supplies $0
$8,980,000 $9,980,000 Legal $6,000
Cars $43,000
$4,220,000 $4,045,000 Biscuit $24,000

Total $278,300
$0 $0
$1,800,000 $1,800,000
$1,800,000 $1,800,000
$500,000 $500,000
$4,100,000 $4,100,000

$120,000 -$55,000
Supplies

Ofc Tucson Ofc Hermo Ofc SC


Desk $1,000 $800
Computer $1,200 $800 $1,000
Printer $400 $400 $0
Phone $200 $200
TV $0 $500 $0
AC $3,500 $0

$2,800 $6,200 $1,000

$10,000

$60,000
$36,000
$60,000
$0
$0
$13,200
$0
$31,000
$1,500
$0
$3,000
$0
$6,000
$0
$6,000

$216,700
LAS PALMAS 2017

1300

HAS ACS
1904 4705
83 205
259 640
2246 5550

$22,128.23 $8,955.17

Appraisal 2017 - Value $49,700,000 $49,700,000

FINANCING - Loan / Value 50.0% 50.0%


$24,850,000 $24,850,000

Interest 0% $0 $0

Murray $5,500,000 $5,500,000


82 Has $500,000 $500,000
Attny $166,000 $166,000
Engineering $5,344,550 $5,344,550
G&A $665,000 $665,000
Closing Costs - Taxes/Fees $192,500 $192,500

$12,368,050 $12,368,050

$12,481,950 $12,481,950

AT -$1,800,000 -$1,800,000
Bob Cook -$1,500,000 -$1,500,000
DiCarpegna -$1,800,000 -$1,800,000
Hatfield -$500,000 -$500,000
-$5,600,000 -$5,600,000

$6,881,950 $6,881,950

Tiaga $6,881,950 $6,881,950


2018 May June July

Rent $800
Robert $700 $1,000
Michaela
Cell $440 $450
Bus. Prop Tax
Bus. Supply $0
Bus. Lic. Fee
Tax
Med. Past Due $0
CC $0 $0
TEP $0
G
Dining
Bakers Mobile
Carlos $300 $0
Mom $0 $450
Ins
Medical
Dentist
CT $550
Bijou
Wedding Gif
Hotel Denver
MGX Copy
San Carlos $3,200

$1,990 $5,900

$7,890
$ -
2

HAS ACS
1904 4705
83 205
259 640
2246 5550

$33,704 $13,640

$75,700,000 $75,700,000

50.0% 50.0%
$37,850,000 $37,850,000

$0 $0

$5,500,000 $5,500,000
$500,000 $500,000
$166,000 $166,000
$5,344,550 $5,344,550
$1,370,500 $1,370,500
$192,500 $192,500

$13,073,550 $13,073,550

$24,776,450 $24,776,450

-$1,800,000 -$1,800,000
-$1,500,000 -$1,500,000
-$1,800,000 -$1,800,000
-$500,000 -$500,000
-$5,600,000 -$5,600,000

$19,176,450 $19,176,450

$19,176,450 $19,176,450
Jan
Interest Best Good OK

8% $ 17,000,000 $ 10,000,000 $ 8,000,000

$ 1,360,000 $ 800,000 $ 640,000

Murray $5,500,000 $5,500,000 $5,500,000


82 Has $450,000 $450,000 $450,000
Attny $166,000 $166,000 $166,000
Engineering $4,292,550 $613,000 $613,000
G&A $665,000 $665,000 $665,000
Closing Costs - Taxes/Fees $192,500 $192,500 $192,500

$ 11,266,050 $ 7,586,500 $7,586,500

AT $ 1,300,000 $ 300,000 $ -
Bob Cook $ 1,400,000 $ 800,000 $ -
DiCarpegna $ 1,800,000 $ 800,000 $ -
Hatfield $ 500,000 $ 500,000 $ -
$ 5,000,000 $ 2,400,000 $ -

$ 16,266,050 $ 9,986,500 $7,586,500

$ 733,950 13,500 $ 413,500


ANEGADOS 2018 - ASSUMPTIONS

JV/ACQUISITION $ 15,000,000

DEVELOPMENT COSTS:
Engineering & Design $ 5,344,550
Infrastructure $ 98,338,101

Resort Build Cost $ 106,376,352


$ 210,059,003

REVENUE ( OPERATIONAL)
Operating Revenue $ 3,224,960
Maintenance & Servicing $ (2,555,771)

NET OPERATING INCOME $ 669,189

TOTAL FINANCING $ 80,000,000


INTEREST RATE 4.25%

VILAGE / TOWNCENTERS

Total SFR 714


Total TH/Condo 1064

Total Units 1778

SFR PODs 221


Condo PODs 183
TH PODs 183
588

PROJECT / SITE ACREAGE BREAKDOWN

Acreage Distribution Total Acres Open Space Developable Acs

Preserved/Untouched - Open Space 4910 3467 1443


2.471
Eco Resort/Spa Feature 45
Resort / Hotel Pads 584.0182374499 295
Commercial 32
Plazas / Open Space 83
Energy Feature (offsite) 0
Golf Course (Open Space) 0
Roadways / Easements 245
Water/Waste/Comm. 14
714

POD A - Village 1 (Bahia) 58


POD B - Village 2 (Catalina) 58
POD C - Village 3 (Mirrador) 31
POD D - Village 4 (Anegados) 37
183

POD E - Village 1 (Bahia) 58


POD F - Village 2 (Catalina) 58
POD G - Village 3 (Mirrador) 31
POD H - Village 4 (Anegados) 37
183

Total SFR PADs 221


Estate Lots - Coastal 141
362

Total Buildable Acreage 1443


DENSITIES & ACREAGE - RESIDENTIAL

Unit / POD Type Lot/Pad Size Acs / Village Total Lots Total Acreage

Estate Lots - Coastal 3.00 N/A 28 84


1.50 N/A 38 57

Lrg Lot A 0.65 11 68 44


Lrg Lot B 0.45 12 108 49

Mid Lot A 0.35 9 108 38


Mid Lot B 0.30 9 118 35

Sml Lot A 0.25 7 118 30


Sml Lot B 0.20 6 128 26

POD A - Village 1 (Bahia) 58 58 128 58


POD B - Village 2 (Catalina) 58 58 148 58
POD C - Village 3 (Mirrador) 31 31 68 31
POD D - Village 4 (Anegados) 37 37 88 37

POD E - Village 1 (Bahia) 58 58 148 58


POD F - Village 2 (Catalina) 58 58 168 58
POD G - Village 3 (Mirrador) 31 31 88 31
POD H - Village 4 (Anegados) 37 37 228 37

AVG TOTALS 147 1778 729

LOT SALE REVENUE - RESIDENTIAL

Unit / POD Type Acres # of Lots Lot/Acre Price Total Sales

Estate Lots - Coastal 3.00 28 $ 2,295,000 $ 64,260,000


1.50 38 $ 910,000 $ 34,580,000

Lrg Lot A 0.65 68 $ 544,500 $ 37,026,000


Lrg Lot B 0.45 108 $ 280,000 $ 30,240,000

Mid Lot A 0.35 108 $ 184,800 $ 19,958,400


Mid Lot B 0.30 118 $ 115,200 $ 13,593,600

Sml Lot A 0.25 118 $ 106,480 $ 12,564,640


Sml Lot B 0.20 128 $ 72,000 $ 9,216,000

POD A - Village 1 (Bahia) 58 128 $ 115,000 $ 6,634,616


POD B - Village 2 (Catalina) 58 148 $ 100,000 $ 5,769,231
POD C - Village 3 (Mirrador) 31 68 $ 125,000 $ 3,835,925
POD D - Village 4 (Anegados) 37 88 $ 120,000 $ 4,486,154

POD E - Village 1 (Bahia) 58 148 $ 115,000 $ 6,634,616


POD F - Village 2 (Catalina) 58 168 $ 80,000 $ 4,615,385
POD G - Village 3 (Mirrador) 31 88 $ 120,000 $ 3,682,488
POD H - Village 4 (Anegados) 37 228 $ 150,000 $ 5,607,693

Totals 1778 $ 262,704,747


CONSTRUCTION COSTS & PRICE / SQFT.

Avg Sqft/Unit Build Cost / Sqft. Sell Price / Sqft. Avg Home Price

Estate Lots - Coastal 8500 $320.00 $900 $7,650,000


6500 $250.00 $700 $4,550,000

Lrg Lot A 5500 $190.00 $450 $2,475,000


Lrg Lot B 4000 $155.00 $350 $1,400,000

Mid Lot A 3000 $130.00 $280 $840,000


Mid Lot B 2400 $110.00 $240 $576,000

Sml Lot A 2200 $100.00 $220 $484,000


Sml Lot B 1800 $90.00 $200 $360,000

GROSS LOT SALES & BUILD REVENUE

Lot Revenue

Estate Lots - Coastal $ 64,260,000


$ 34,580,000

Lrg Lot A $ 37,026,000


Lrg Lot B $ 30,240,000

Mid Lot A $ 19,958,400


Mid Lot B $ 13,593,600

Sml Lot A $ 12,564,640


Sml Lot B $ 9,216,000

POD A - Village 1 (Bahia) $ 6,634,616


POD B - Village 2 (Catalina) $ 5,769,231
POD C - Village 3 (Mirrador) $ 3,835,925
POD D - Village 4 (Anegados) $ 4,486,154

POD E - Village 1 (Bahia) $ 6,634,616


POD F - Village 2 (Catalina) $ 4,615,385
POD G - Village 3 (Mirrador) $ 3,682,488
POD H - Village 4 (Anegados) $ 5,607,693

Gross Revenue Lots/Land $ 262,704,747


Resort PODs (4 @ 35 +/- Acs) $300,000 295 $ 88,379,711
Eco/Spa Feature $250,000 45 $ 11,277,619
Commercial Pads - Sale Revenue SqFt $13 $ 18,072,767

Total Feature Revenue $ 117,730,097

Total Gross Revenue - Land $ 380,434,844


(%) of project

29%

1%
6%
1%
2%
0%
0%
5%
0%
15%

1.18%
1.18%
0.63%
0.76%
4%

1%
1%
1%
1%
4%

22%
9%
30%

52%

29%
1081
Profit / Sqft. Profit / Unit Revenue

$580.00 $4,930,000 $138,040,000


$450.00 $2,925,000 $111,150,000

$260.00 $1,430,000 $97,240,000


$195.00 $780,000 $84,240,000

$150.00 $450,000 $48,600,000


$130.00 $312,000 $36,816,000

$120.00 $264,000 $31,152,000


$110.00 $198,000 $25,344,000

Build Revenue

$ 138,040,000
$ 111,150,000

$ 97,240,000
$ 84,240,000

$ 48,600,000
$ 36,816,000

$ 31,152,000
$ 25,344,000

$ 572,582,000
DETAIL OF SALES

# UNITS SALES NET CONST 2017 2018 2019 2020 2021 2022

Lot Sales Absorption 0% 0% 25% 25% 8% 10%

Estate Lots - Coastal 28 $ 64,260,000 $ - $ 5,140,800 $ 6,426,000


38 $ 34,580,000 $ 2,766,400 $ 3,458,000

Lrg Lot A 68 $ 37,026,000 $ - $ 2,962,080 $ 3,702,600


Lrg Lot B 108 $ 30,240,000 $ - $ 2,419,200 $ 3,024,000
242 $ 166,106,000 $ - $ 13,288,480 $ 16,610,600
Lots Sold 19 24

Mid Lot A 108 $ 19,958,400 $ - $ 1,596,672 $ 1,995,840


Mid Lot B 118 $ 13,593,600 $ - $ 1,087,488 $ 1,359,360
Sml Lot A 118 $ 12,564,640 $ - $ 1,005,171 $ 1,256,464
Sml Lot B 128 $ 9,216,000 $ - $ 737,280 $ 921,600
472 $ 55,332,640 $ 4,426,611 $ 5,533,264
Lots Sold 38 47

POD A - Village 1 (Bahia) 128 $ 6,634,616 $ - $ 1,658,654 1,658,654 $ 1,658,654 $ 1,658,654


POD B - Village 2 (Catalina) 148 $ 5,769,231 $ - $ 1,442,308 1,442,308 $ 1,442,308 $ 1,442,308
POD C - Village 3 (Mirrador) 68 $ 3,835,925 $ - $ 958,981 958,981 $ 958,981 $ 958,981
POD D - Village 4 (Anegados) 88 $ 4,486,154 $ - $ 1,121,539 1,121,539 $ 1,121,539 $ 1,121,539
432 $ 20,725,926 $ - $ 5,181,481 5,181,481 $ 5,181,481 $ 5,181,481

POD E - Village 1 (Bahia) 148 $ 6,634,616 $ 1,658,654 1,658,654 $ 1,658,654 $ 1,658,654


POD F - Village 2 (Catalina) 168 $ 4,615,385 $ 1,153,846 1,153,846 $ 1,153,846 $ 1,153,846
POD G - Village 3 (Mirrador) 88 $ 3,682,488 $ 920,622 920,622 $ 920,622 $ 920,622
POD H - Village 4 (Anegados) 228 $ 5,607,693 $ 1,401,923 1,401,923 $ 1,401,923 $ 1,401,923
632 $ 20,540,181 $ 5,135,045 5,135,045 $ 5,135,045 $ 5,135,045
Gross Revenue Lots/Land 1778 $ 262,704,747 $ - $ 10,316,527 $ 10,316,527 $ 28,031,618 $ 32,460,391

Resort PODs (4 @ 35 +/- Acs) $ 88,379,711 22,094,928 $ 22,094,928 $ 22,094,928 $ 22,094,928


Eco/Spa Feature $ 11,277,619 $ 11,277,619
$ 99,657,330 22,094,928 $ 22,094,928 $ 33,372,547 $ 22,094,928

Commercial Pads - Sale Revenue $ 18,072,767 $ 4,518,192 $ 6,325,468 $ 3,614,553

$ 18,072,767 $ 4,518,192 $ 6,325,468 $ 3,614,553

Total Gross Revenue - Land $ 380,434,844 $ - $ 32,411,454 $ 36,929,646 $ 67,729,633 $ 58,169,872


2023 2024 2025 2026 2027 2028 2029 2030 2031

14% 18% 16% 14% 12% 8% 0% 0% 0%

$ 8,996,400 $ 11,566,800 $ 10,281,600 $ 8,996,400 $ 7,711,200 $ 5,140,800 $ - $ - $ -


$ 4,841,200 $ 6,224,400 $ 5,532,800 $ 4,841,200 $ 4,149,600 $ 2,766,400 $ - $ -

$ 5,183,640 $ 6,664,680 $ 5,924,160 $ 5,183,640 $ 4,443,120 $ 2,962,080 $ - $ - $ -


$ 4,233,600 $ 5,443,200 $ 4,838,400 $ 4,233,600 $ 3,628,800 $ 2,419,200 $ - $ - $ -
$ 23,254,840 $ 29,899,080 $ 26,576,960 $ 23,254,840 $ 19,932,720 $ 13,288,480 $ - $ - $ -
34 44 39 34 29 19 -

$ 2,794,176 $ 3,592,512 $ 3,193,344 $ 2,794,176 $ 2,395,008 $ 1,596,672 $ - $ - $ -


$ 1,903,104 $ 2,446,848 $ 2,174,976 $ 1,903,104 $ 1,631,232 $ 1,087,488 $ - $ - $ -
$ 1,759,050 $ 2,261,635 $ 2,010,342 $ 1,759,050 $ 1,507,757 $ 1,005,171 $ - $ - $ -
$ 1,290,240 $ 1,658,880 $ 1,474,560 $ 1,290,240 $ 1,105,920 $ 737,280 $ - $ - $ -
$ 7,746,570 $ 9,959,875 $ 8,853,222 $ 7,746,570 $ 6,639,917 $ 4,426,611 $ - $ - $ -
66 85 76 66 57 38
$ 31,001,410 $ 39,858,955 $ 35,430,182 $ 31,001,410 $ 26,572,637 $ 17,715,091

$ 1,807,277 $ 1,807,277

$ 1,807,277 $ 1,807,277

$ 32,808,686 $ 41,666,232 $ 35,430,182 $ 31,001,410 $ 26,572,637 $17,715,091


Totals

100%

$ 64,260,000
$ 34,580,000

$ 37,026,000
$ 30,240,000
$ 166,106,000
242

$ 19,958,400
$ 13,593,600
$ 12,564,640
$ 9,216,000
$ 55,332,640
$ 472

$ 6,634,616
$ 5,769,231
$ 3,835,925
$ 4,486,154
$ 20,725,926

$ 6,634,616
$ 4,615,385
$ 3,682,488
$ 5,607,693
$ 20,540,181
$ 262,704,747

$ 88,379,711
$ 11,277,619
$ 99,657,330

$ 18,072,767

$ 18,072,767

$ 380,434,844
PROFORMA INCOME
ANEGADOS 2018-2032

2018 2019 2020 2021 2022 2023 2024

Sales Absorption
# Units Sold 57 71 100

Sales Revenue
Coastal / Large Lots 13,288,480 16,610,600 23,254,840
Mid / Small Lots 4,426,611 5,533,264 7,746,570
POD A - D 5,181,481 5,181,481 5,181,481 5,181,481
POD E - H 5,135,045 5,135,045 5,135,045 5,135,045
Gross Revenue - Lots 10,316,527 10,316,527 28,031,618 32,460,391 31,001,410

Resort Features 22,094,928 22,094,928 22,094,928 22,094,928


Eco - Spa Features 11,277,619
Sales - Commercial Lots 4,518,192 6,325,468 3,614,553 1,807,277
Gross Revenue - Features 22,094,928 26,613,119 39,698,015 25,709,481 1,807,277

Total Revenue - Lots & Features 32,411,454 36,929,646 67,729,633 58,169,872 32,808,686

Hotel Revenue
Hotel - Condo Revenue 1,490,327

Medical Facility Revenue


Medical Facility Revenue 867,477

Commercial Bldg Lease Revenue


Office & Retail 345,708

Facilities & Amenity Revenue


PROFORMA INCOME
ANEGADOS 2018-2032
Solar Energy 297,861 340,808 460,257
Water - Desalination 41,383 96,837 214,850
Waste 22,277 52,629
Golf 32,850
Marina
Equestrian 41,820 52,275

Gross Revenue - Facilities 297,861 501,742 3,516,373

Total Revenues 32,411,454 36,929,646 68,027,494 58,671,614 36,325,059


% of Total Infrastructure & Development Cost 50% 40% 10% 0% 0%
% of Total Resort Feature Cost 0% 50% 30% 20% 0%

Development Costs

Engineering & Design 2,939,503 2,405,048


Infrastructure & Development - - 51,841,326 41,473,061 10,368,265
Resort Features - - 53,188,176 31,912,906 21,275,270
Boutique Hotel
Total Development Costs (2,939,503) (2,405,048) (51,841,326) (94,661,236) (42,281,171) (21,275,270)

Gross Profit (2,939,503) (2,405,048) (19,429,871) (57,731,590) 25,746,324 37,396,343 36,325,059

G & A Expenses
Project Management 515,000 515,000 515,000 515,000
Employee Benefits 30,000 30,000 30,000 30,000
Payroll Taxes
Tucson- San Carlos Ofc. / Leases 60,000 60,000 60,000 60,000
PROFORMA INCOME
ANEGADOS 2018-2032
Utilities 2,500 2,500 2,500 2,500
Repairs and maintenance
Insurance 0 0 0 0
Travel 20,000 20,000 20,000 20,000
Telephone 6,000 6,000 6,000 6,000
Postage
Office supplies / IF 7,500 2,500 2,500 2,500
Advertising
Marketing / Promotion 0 0 0 0
Professional Fees 24,000 24,000 24,000 24,000
Training and Development
Bank charges
Depreciation
Interest Expense
Other (contingency)
Total G & A Expenses (665,000) (660,000) (660,000) (660,000) 0 0 0

Operating Income (3,604,503) (3,065,048) (20,089,871) (58,391,590) 25,746,324 37,396,343 36,325,059

Solar - O&M 167,342 171,525 175,813


Desalination - O&M 463,968 463,968 463,968
Waste - O&M 46,000 55,200 64,830
Golf - O&M 626,827 639,364 645,757 658,672
Marina - O&M 52,375 54,993
Equestrian - O&M 121,200 124,836 128,581 133,724

Commissions - 3% (Total Sales) 1,417,385 2,872,838 2,718,908 1,914,303


Other income (expense)

Total Nonoperating (Income) Expense 2,165,412 4,314,347 4,236,314 3,466,304


PROFORMA INCOME
ANEGADOS 2018-2032
Income (Loss) Before Taxes (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363

VAT Taxes

Net Income (Loss) Before IT (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363

Cumulative Net Income (Loss) Before IT (3,604,503) (6,669,550) (26,759,421) (82,985,599) (52,924,929) (11,292,272) 28,499,091

PROFORMA - CASH FLOW


LAS PALMAS 2016-2030

2018 2019 2020 2021 2022 2023 2024

Net Income (Loss) Before IT (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363

Cash From Operations (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363

FINANCING ACTIVITIES -

Acquisition - Initial Draw 16,000,000


Loan Draw 1 - 20,000,000
Loan Draw 2 - 60,000,000
Loan Draw 3 -
Loan Draw 4 -
Total Draws 16,000,000 20,000,000 60,000,000

Principal & Interest Payments @ 12% IY (15,000,000) (800,000)


PROFORMA INCOME
ANEGADOS 2018-2032
Principal & Interest Payments - Draw 1 (1,791,537) (1,791,537) (1,791,537) (1,791,537) (1,791,537)
Principal & Interest Payments - Draw 2 (5,761,044) (5,761,044) (5,761,044) (5,761,044)
Principal & Interest Payments - Draw 3
Principal & Interest Payments - Draw 4

TOTAL DEBT PAYMENTS (15,000,000) (800,000) (1,791,537) (7,552,581) (7,552,581) (7,552,581) (7,552,581)

Cash from Financing Activities 1,000,000 18,208,463 52,447,419 (7,552,581) (7,552,581) (7,552,581)
Distributions (8,708,500)
Net Cash Flow (3,604,503) (3,065,048) (1,881,408) (3,778,759) 22,508,089 34,080,076 32,238,782
Cummulative Net Cash (11,313,003) (14,378,050) (16,259,458) (20,038,218) 2,469,871 36,549,947 68,788,729

SUMMARY:
Beginning Cash 16,000,000 3,686,998 621,950 (1,259,458) (5,038,218) 17,469,871 51,549,947
Cash Flow (3,604,503) (3,065,048) (1,881,408) (3,778,759) 22,508,089 34,080,076 32,238,782
Contributions
Distributions (8,708,500)
Ending Cash 3,686,998 621,950 (1,259,458) (5,038,218) 17,469,871 51,549,947 83,788,729

IRR CALCULATION:
78.06% (3,604,503) (3,065,048) (1,881,408) (3,778,759) 22,508,089 34,080,076 32,238,782
PROFORMA INCOME
ANEGADOS 2018-2032

2018 2019 2020 2021 2022 2023 2024

Sales Absorption
# Units Sold 57 71 100

Sales Revenue
Coastal / Large Lots 13,288,480 16,610,600 23,254,840
Mid / Small Lots 4,426,611 5,533,264 7,746,570
POD A - D 5,181,481 5,181,481 5,181,481 5,181,481
POD E - H 5,135,045 5,135,045 5,135,045 5,135,045
Gross Revenue - Lots 10,316,527 10,316,527 28,031,618 32,460,391 31,001,410

Resort Features 22,094,928 22,094,928 22,094,928 22,094,928


Eco - Spa Features 11,277,619
Sales - Commercial Lots 4,518,192 6,325,468 3,614,553 1,807,277
Gross Revenue - Features 22,094,928 26,613,119 39,698,015 25,709,481 1,807,277

Total Revenue - Lots & Features 32,411,454 36,929,646 67,729,633 58,169,872 32,808,686

Hotel Revenue
Hotel - Condo Revenue 1,490,327

Medical Facility Revenue


Medical Facility Revenue 867,477

Commercial Bldg Lease Revenue


Office & Retail 345,708

Facilities & Amenity Revenue


PROFORMA INCOME
ANEGADOS 2018-2032
Solar Energy 297,861 340,808 460,257
Water - Desalination 41,383 96,837 214,850
Waste 22,277 52,629
Golf 32,850
Marina
Equestrian 41,820 52,275

Gross Revenue - Facilities 297,861 501,742 3,516,373

Total Revenues 32,411,454 36,929,646 68,027,494 58,671,614 36,325,059


% of Total Infrastructure & Development Cost 50% 40% 10% 0% 0%
% of Total Resort Feature Cost 0% 50% 30% 20% 0%

Development Costs

Engineering & Design 2,939,503 2,405,048


Infrastructure & Development - - 51,841,326 41,473,061 10,368,265
Resort Features - - 53,188,176 31,912,906 21,275,270
Boutique Hotel
Total Development Costs (2,939,503) (2,405,048) (51,841,326) (94,661,236) (42,281,171) (21,275,270)

Gross Profit (2,939,503) (2,405,048) (19,429,871) (57,731,590) 25,746,324 37,396,343 36,325,059

G & A Expenses
Project Management 515,000 515,000 515,000 515,000
Employee Benefits 30,000 30,000 30,000 30,000
Payroll Taxes
Tucson- San Carlos Ofc. / Leases 60,000 60,000 60,000 60,000
PROFORMA INCOME
ANEGADOS 2018-2032
Utilities 2,500 2,500 2,500 2,500
Repairs and maintenance
Insurance 0 0 0 0
Travel 20,000 20,000 20,000 20,000
Telephone 6,000 6,000 6,000 6,000
Postage
Office supplies / IF 7,500 2,500 2,500 2,500
Advertising
Marketing / Promotion 0 0 0 0
Professional Fees 24,000 24,000 24,000 24,000
Training and Development
Bank charges
Depreciation
Interest Expense
Other (contingency)
Total G & A Expenses (665,000) (660,000) (660,000) (660,000) 0 0 0

Operating Income (3,604,503) (3,065,048) (20,089,871) (58,391,590) 25,746,324 37,396,343 36,325,059

Solar - O&M 167,342 171,525 175,813


Desalination - O&M 463,968 463,968 463,968
Waste - O&M 46,000 55,200 64,830
Golf - O&M 626,827 639,364 645,757 658,672
Marina - O&M 52,375 54,993
Equestrian - O&M 121,200 124,836 128,581 133,724

Commissions - 3% (Total Sales) 1,417,385 2,872,838 2,718,908 1,914,303


Other income (expense)

Total Nonoperating (Income) Expense 2,165,412 4,314,347 4,236,314 3,466,304


PROFORMA INCOME
ANEGADOS 2018-2032
Income (Loss) Before Taxes (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363

VAT Taxes

Net Income (Loss) Before IT (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363

Cumulative Net Income (Loss) Before IT (3,604,503) (6,669,550) (26,759,421) (82,985,599) (52,924,929) (11,292,272) 28,499,091

PROFORMA - CASH FLOW


LAS PALMAS 2016-2030

2018 2019 2020 2021 2022 2023 2024

Net Income (Loss) Before IT (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363

Cash From Operations (3,604,503) (3,065,048) (20,089,871) (56,226,178) 30,060,670 41,632,657 39,791,363

FINANCING ACTIVITIES -

Acquisition - Initial Draw 16,000,000


Loan Draw 1 - 20,000,000
Loan Draw 2 - 60,000,000
Loan Draw 3 -
Loan Draw 4 -
Total Draws 16,000,000 20,000,000 60,000,000

Principal & Interest Payments @ 12% IY (15,000,000) (800,000)


PROFORMA INCOME
ANEGADOS 2018-2032
Principal & Interest Payments - Draw 1 (1,791,537) (1,791,537) (1,791,537) (1,791,537) (1,791,537)
Principal & Interest Payments - Draw 2 (5,761,044) (5,761,044) (5,761,044) (5,761,044)
Principal & Interest Payments - Draw 3
Principal & Interest Payments - Draw 4

TOTAL DEBT PAYMENTS (15,000,000) (800,000) (1,791,537) (7,552,581) (7,552,581) (7,552,581) (7,552,581)

Cash from Financing Activities 1,000,000 18,208,463 52,447,419 (7,552,581) (7,552,581) (7,552,581)
Distributions (8,708,500)
Net Cash Flow (3,604,503) (3,065,048) (1,881,408) (3,778,759) 22,508,089 34,080,076 32,238,782
Cummulative Net Cash (11,313,003) (14,378,050) (16,259,458) (20,038,218) 2,469,871 36,549,947 68,788,729

SUMMARY:
Beginning Cash 16,000,000 3,686,998 621,950 (1,259,458) (5,038,218) 17,469,871 51,549,947
Cash Flow (3,604,503) (3,065,048) (1,881,408) (3,778,759) 22,508,089 34,080,076 32,238,782
Contributions
Distributions (8,708,500)
Ending Cash 3,686,998 621,950 (1,259,458) (5,038,218) 17,469,871 51,549,947 83,788,729

IRR CALCULATION:
78.06% (3,604,503) (3,065,048) (1,881,408) (3,778,759) 22,508,089 34,080,076 32,238,782
PROFORMA COST DETAIL

ENGINEERING & DEVELOPMENT PHASE I & II PROJECT TOTAL

Engineering

Planning & Design 613,000 613,000


Engineering - Civil / Environmental - Infrastructure 4,517,550 4,517,550
Engineering - Desalination - Solar - Waste 214,000 214,000
Total 5,344,550 5,344,550

Infrastructure Construction
Off Site Primary - Infrastructure Costs 6,590,227 6,559,127
On Site Primary - Infrastructure Costs 5,482,458 10,864,258
On Site Secondary - Infrastructure Costs 9,549,130 12,580,140
Total 21,621,815 30,003,526

Electrical
Electrical Transmission & Distribution Substations 1,842,500 3,685,000
Telecommunication 650,000 650,000
Energy Feature - 18 MegaWatts Solar Facility 21,208,857 42,417,714
Total 23,701,357 46,752,714

Uilities
Biokinetic Waste Treatment Systems ( 38 Units ) 990,000 990,000
Waste Treatment Facility (MBR Waste Plant) 648,300 1,105,600
Desalination Plant (3.65 x 1M GPD) 4,934,600 12,524,700
Water Storage & Distribution System 2,374,000 5,935,000
Total 8,946,900 20,555,300
Fees / Permits
Permits 298,073 1,026,561
Total 298,073 1,026,561

Total Infrastructure Development 59,912,696 103,682,651

RESORT AMENITIES

Resort / Amenity Features


Boutique Hotel (Spa & Beach Club) - 80 Units 47,512,970 47,512,970

Equestrian Center 1,456,000 1,456,000


Golf Course / Country Club - JV 12,536,541 12,536,541
Inland Marina & Waterfront 19,879,125 19,879,125
Total 81,384,636 81,384,636

Commercial Features
Medical / Surgical Center 6,379,783 6,379,783
Office / Retail Center 2,088,844 4,177,688
Research Center / Facilities 1,972,110 3,944,220
Total 10,440,737 14,501,691

Environmental Features

Organic Farming Facilities 6,990,025


Reef / Beach Rejuvenation Project 2,000,000 3,500,000
Total 2,000,000 10,490,025
Total Resort Amenities 93,825,373 106,376,352

Total Development Costs 159,082,618 210,059,003


ENGINEERING, PLANNING & DESIGN (ENTITLEMENTS)

ENGINEERING COSTS PLANNING & DESIGN

Percent of Total
Development Master Plan Costs Project Costs Planning & Design

Surveying - Aerial @ 1 Foot Contour $ 115,000 5% $ 115,000 Inventory / Site Analysis


Localization Plan $ 85,000 3% $ 85,000 Comprehensive Plan / Site Use
Polygon Plan $ 65,000 3% $ 65,000 Codes & Guidelines
Subdivision Plan $ 365,000 14% $ 365,000 Neighborhood / District Plans
Concept Site Plan $ 90,000 4% $ 90,000 Intergovernmental Coordination
Zoning and Services Plan $ 75,000 3% $ 75,000 Schematic Design
Topographic Plan $ 125,000 5% $ 125,000 Lanscape and Land Use
Building Placement Plan $ 65,000 3% $ 65,000 Detailed Design Development
Block Plan $ 60,000 2% $ 60,000 Contract Documents
Land Use Plan $ 115,000 5% $ 115,000 Bidding & Contracting
Outlines and Slope Plan $ 85,000 3% $ 85,000
Road Plan $ 165,000 7% $ 165,000 Total Planning & Design
Water System and Fire Hydrant Plan $ 230,000 9% $ 230,000
Sewer System Plan $ 275,000 11% $ 275,000
STUDIES & PERMITS
Electrical System Plan $ 220,000 9% $ 220,000
Street Lighting Plan $ 70,000 3% $ 70,000
Hydrlogy Plan $ 185,000 7% $ 185,000 Studies & Permiting
Special Facilities Plan (Amenities) $ 90,000 4% $ 90,000
Land Movement Budget $ 12,500 0% $ 12,500
Building Budget $ 14,500 1% $ 14,500 Land Use Feasibility Study (zoning)
Urban Budget $ 14,000 1% $ 14,000 CFE Feasibility Study
Development Timeline $ 12,500 0% $ 12,500 COAPAES Feasibility Study
Construction Feasibility Study
Total Development Master Plan $ 2,533,500 100% $ 2,533,500 Electrical Project Authorization (CFE)
Land Use (SEMARNAT)
Environmental Impact Report
ARCHITECTURAL COSTS
Hydrology Study
Land Use License
Architectural Plan Development Agreement
SIUE Resolution
Structural Calculation $ 65,000 6% $ 65,000 SEMARNAT resolution
Architectural Concept Plan $ 115,000 11% $ 115,000
Architectural Plan $ 250,000 24% $ 250,000
Façade Plan $ 75,000 7% $ 75,000
Cross Section Plan $ 68,000 6% $ 68,000 Total Studies & Permiting
Structure Plan $ 88,000 8% $ 88,000
Construction Details Plan $ 185,000 18% $ 185,000 Engineering / Architectural / Studies & Permits Tot
Electrical Installations Plan $ 85,000 8% $ 85,000 Planning & Design Total
Hydro-Sanitary Installation Plan $ 67,000 6% $ 67,000 Utility Systems Engineering / Design Total
Special Facilities Installation Plan $ 54,000 5% $ 54,000
Project Management / Coordination

Total Architectural Plan $ 1,052,000 100% $ 1,052,000 Project Total As % of Construction Cst
GN ENGINEERING - DESAL / SOLAR / WASTE

Percent Amenity Design Plan Costs


Costs Completed
Desalination $ 64,000
$ 88,000 14% Solar $ 83,000
$ 85,000 14% Waste $ 67,000
$ 38,000 6%
$ 68,000 11% Total Eng. - Desal / Solar / Waste $ 214,000
$ 35,000 6%
$ 60,000 10%
$ 87,000 14%
$ 138,000 23%
$ 6,500 1%
$ 7,500 1%

$ 613,000 100%

TS

$ 52,500 13% $ 52,500


$ 28,500 7% $ 28,500
$ 27,000 7% $ 27,000
$ 44,000 11% $ 44,000
$ 32,000 8% $ 32,000
$ 41,000 10% $ 41,000
$ 75,000 18% $ 75,000
$ 65,000 16% $ 65,000
$ 17,500 4% $ 17,500
$ 11,500 3% $ 11,500
$ 7,500 2% $ 7,500
$ 7,500 2% $ 7,500

$ 409,000 100% $ 409,000

ral / Studies & Permits Total $ 3,994,500 75% $ 3,994,500


$ 613,000 11% $ 613,000
ing / Design Total $ 214,000 4% $ 214,000

$ 523,050 10% $ 523,050

5.15% $ 5,344,550 100% $ 5,344,550


INFRASTRUCTURE DEVELOPMENT - PHASE I

PRIMARY - ONSITE CONSTRUCTION SECONDARY - ONSITE CONSTRUCTION

Quantity Unit Unit/Cost Total Quantity Unit Unit/Cost Total

GRADING & PAVING (Onsite) 1 5,280 GRADING & PAVING (Onsite) 1 5,280
1 43,560 Km 2.19 Km 7.16
Roadway (Primary) 7,216 LF Mi 1.37 Roadways (Secondary) 23,616 LF Mi 4.47

Mobilization 1 LSUM $ 50,000 $ 50,000 Mobilization 1 LSUM $ 10,000 $ 10,000


Clearing / Grubbing - 60' CS 12.42 AC $ 1,500 $ 18,636 Clearing / Grubbing - 40' CS 49.88 AC $ 1,500 $ 74,817
Rough Grading - 54' CS 396,880 SQFT $ 0.25 $ 99,220 Rough Grading - 34' CS 1,794,816 SQFT $ 0.25 $ 448,704
Finish Subgrade 1/10th grade AB 4" - 48' CS 396,880 SQFT $ 0.35 $ 138,908 Finish Subgrade 1/10th grade AB 4" - 24' CS 1,464,192 SQFT $ 0.35 $ 512,467
Paving 2.5" AC - 48' CS 396,880 SQFT $ 2.25 $ 892,980 Paving 2.5" AC - 24' CS 1,464,192 SQFT $ 2.25 $ 3,294,432
Thickened Edge 7,216 LF $ 0.35 $ 2,526 Thickened Edge 23,616 LF $ 0.35 $ 8,266
Water Adjustments 26 SF $ 125 $ 3,250 Water Adjustments 88 SF $ 125 $ 11,000
Hydrants Markers 7 SF $ 52 $ 364 Hydrants Markers 24 SF $ 52 $ 1,248
Survey Monuments 29 SF $ 240 $ 6,960 Survey Monuments 94 SF $ 240 $ 22,560

Rough Grading - PADS Phase II & III 606,752 SQYD $ 0 $ 163,823

Subtotal $ 1,376,667 Subtotal $ 4,383,493

GRADING & PAVING (Coastal Road) 1 5,280 GRADING & PAVING (Coastal Road) 1 5,280
1 43,560 Km 4.37 Km 3.18
Roadway (Primary) 14,433 LF Mi 2.73 Roadways (Secondary) 10,500 LF Mi 1.99

Clearing / Grubbing - 75' CS 24.85 AC $ 1,250 $ 31,063 Clearing / Grubbing - 64' CS 15.43 AC $ 1,250 $ 19,284
Rough Grading - 45' CS 649,485 SQFT $ 0.25 $ 162,371 Rough Grading - 32' CS 336,000 SQFT $ 0.25 $ 84,000
Subgrade 1/10th grade AB 4" - 45' CS 649,485 SQFT $ 0.35 $ 227,320 Subgrade 1/10th grade AB 4" - 32' CS 336,000 SQFT $ 0.35 $ 117,600
Paving 2.5" AC - 48' CS 649,485 SQFT $ 2.25 $ 1,461,341 Paving 2" AC - 32' CS 336,000 SQFT $ 2.25 $ 756,000
Thickened Edge 14,433 LF $ 0.35 $ 5,052 Thickened Edge 10,500 LF $ 0.35 $ 3,675
Water Adjustments 10 SF $ 125 $ 1,250 Water Adjustments 12 SF $ 125 $ 1,500
Hydrants Markers 3 SF $ 52 $ 156 Hydrants Markers 6.00 SF $ 52 $ 312
Survey Monuments 3 SF $ 240 $ 720 Survey Monuments 6.00 SF $ 240 $ 1,440

Subtotal $ 1,889,273 Subtotal $ 983,811

CONCRETE, CULVERTS & RIP RAP (Onsite) CONCRETE, CULVERTS & RIP RAP (Onsite)

Off-System Culvert 20 SF $ 185.00 $ 3,700.00 Off-System Culvert 10 SF $ 185.00 $ 1,850.00


12" Concrete Pavement Edge 36,803 LF $ 6.00 $ 220,819.80 12" Concrete Pavement Edge 33,062 LF $ 6.00 $ 198,374.40
2' Wedge Curb 2,165 LF $ 8.00 $ 17,318.40 2' Wedge Curb 7,085 LF $ 8.00 $ 56,678.40
14" Extruded Vertical Curb 1,443 LF $ 12.00 $ 17,318.40 14" Extruded Vertical Curb 4,723 LF $ 12.00 $ 56,678.40
Concrete Header 722 LF $ 11.00 $ 7,937.60 Concrete Header 2,362 LF $ 11.00 $ 25,977.60
Scupper / Rip Rap 8 LSUM $ 3,500.00 $ 28,000.00 Scupper / Rip Rap 5 LSUM $ 3,500.00 $ 17,500.00

Subtotal $ 295,094.20 Subtotal $ 357,058.80

UTILITY CONSTRUCTION (Onsite - Primary) UTILITY CONSTRUCTION (Onsite - Secondary)

Excavation - Waterline Trench 7,216 LF $ 14 $ 101,024 Excavation - Waterline Trench 23,616 LF $ 12 $ 283,392
Waterline PVC Sched. 40 8" & 12" 7,216 LF $ 22 $ 158,752 Waterline PVC Sched. 40 6" & 8" 23,616 LF $ 20 $ 472,320
Hydrant Lines 866 LF $ 19 $ 16,236 Hydrant Lines 2,834 LF $ 19 $ 53,136
Service Lines 1,588 LF $ 14 $ 22,225 Service Lines 5,196 LF $ 14 $ 72,737
Sand / Backfill 7,216 LF $ 3 $ 23,452 Sand / Backfill 23,616 LF $ 3 $ 76,752
Test 1 LSUM $ 4,200 $ 4,200 Test 1 LSUM $ 12,600 $ 12,600
Barricades 1 LSUM $ 3,500 $ 3,500 Barricades 1 LSUM $ 9,500 $ 9,500

Electric / Tel. Trench / Pads / Conduit 4" 7,216 LF $ 18 $ 127,002 Electric / Tel. Trench / Pads / Conduit 4" 23,616 LF $ 18 $ 415,642
Install 2.5" Primary Electric Line 7,216 LF $ 5 $ 32,472 Install 2.5" Primary Electric Line 23,616 LF $ 5 $ 106,272
Transformers 11 EA $ 1,250 $ 13,750 Transformers 27 EA $ 1,250 $ 33,750
Test 1 EA $ 4,200 $ 4,200 Test 1 EA $ 11,600 $ 11,600

Excavation - Sewer Trench 7,216 LF $ 28 $ 202,048 Excavation - Sewer Trench 23,616 LF $ 28 $ 661,248
Sewer 8" & 12" PVC Pipe / Backfill 1,200 LF $ 25 $ 30,000 Sewer 6" & 8" PVC Pipe / Backfill 13,500 LF $ 35 $ 472,500
Sewer 8" & 12" DIP/ Backfill 1,000 LF $ 35 $ 35,000 Sewer 6" & 8" DIP / Backfill 1,500 LF $ 35 $ 52,500
Manholes / Cleanouts 7 EA $ 2,300 $ 16,100 Manholes / Cleanouts 14 EA $ 2,300 $ 32,200

Subtotal $ 789,961 Subtotal $ 2,766,149

MISC.(Onsite) MISC.(Onsite)

Multi Use Trail / Ped (graded) 60,000 LF $ 12 $ 720,000 Multi Use Trail / Ped (graded) 30,000 LF $ 12 $ 360,000
Const. Fencing / Signage / Run Off 6 LSUM $ 3,500 $ 21,000 Const. Fencing / Signage / Run Off 4 LSUM $ 3,500 $ 14,000
Retention / Detention Basins 25,000 SQFT $ 5 $ 131,250 Retention / Detention Basins 12,500 SQFT $ 5 $ 65,625
Landscaping (ROW) 20 LSUM $ 2,750 $ 55,000 Landscaping (ROW) 30 LSUM $ 2,750 $ 82,500
5' Wall / Fencing / Drainage 12,500 LF $ 8 $ 100,000 5' Wall / Fencing / Drainage 5,000 LF $ 8 $ 40,000
Stripping 7,216 LF $ 1 $ 10,463 Stripping 23,616 LF $ 1 $ 34,243
Signage 50 EA $ 175 $ 8,750 Signage 70 EA $ 175 $ 12,250
Entry Feature / Gate / Guard House 1 LSUM $ 85,000 $ 85,000 Entry Feature / Gate 6 LSUM $ 75,000 $ 450,000

Subtotal $ 1,131,463 Subtotal $ 1,058,618

TOTAL ONSITE - Primary $ 5,482,458 TOTAL ONSITE - Secondary $ 9,549,130

PRIMARY (ARTERIAL) - OFFSITE CONSTRUCTION

Quantity Unit Unit/Cost Total

GRADING & PAVING (Off Site) 1 5,280


Km 6.01
Roadway (Primary) 18,040 LF Mi 3.42

Clearing / Grubbing - 87' CS 36.03 AC $ 1,500 $ 54,045


Rough Grading - 72' CS 1,298,880 SQFT $ 0.25 $ 324,720
Subgrade 1/10th AB - 60' CS 1,082,400 SQFT $ 0.35 $ 378,840
Paving 2.5" AC - 60' CS 1,082,400 SQFT $ 2.25 $ 2,435,400
Thickened Edge 18,040 LF $ 0.35 $ 6,314
Water Adjustments 19 EA $ 125 $ 2,375
Hydrants Markers 14 EA $ 52 $ 728
Survey Monuments 61 EA $ 240 $ 14,640

Subtotal $ 3,217,062

CONCRETE & RIP RAP

Off-System Culvert 7,500 SF $ 185 $ 1,387,500


12" Concrete Pavement Edge 25,256 LF $ 6 $ 151,536
2' Wedge Curb 5,412 LF $ 8 $ 43,296
14" Extruded Vertical Curb 3,608 LF $ 12 $ 43,296
Concrete Header 1,804 LF $ 11 $ 19,844
Scupper / Rip Rap 4 LSUM $ 3,500 $ 14,000

Subtotal $ 1,659,472

UTILITY CONSTRUCTION (Offsite - Primary)

Excavation - Waterline Trench 18,040 SF $ 14 $ 252,560


Waterline PVC Sched. 40 8" & 12" 18,040 SF $ 22 $ 396,880
Hydrant Lines 2,165 SF $ 19 $ 40,590
Sand / Backfill 18,040 SF $ 3 $ 58,630
Test 1 EA $ 5,500 $ 5,500
Barricades 1 LSUM $ 7,500 $ 7,500

Electric / Tel. Trench / Pads / Conduit 4" 18,040 SF $ 18 $ 324,720


Install 2.5" Primary Electric Line 18,040 SF $ 5 $ 81,180
Transformers 21 EA $ 1,250 $ 26,250
Test 1 EA $ 12,600 $ 12,600

Subtotal $ 1,206,410

MISC. (Offsite)

Multi Use Trail / Ped (graded) 5,000 LF $ 12 $ 60,000


Construction Fencing/Signage 4 LSUM $ 3,500 $ 14,000
Retention/Detention Basins 15,000 SQFT $ 5 $ 78,750
Landscaping (ROW) 15 LSUM $ 2,750 $ 41,250
5' Wall / Fencing / Drainage 11,500 LF $ 8 $ 92,000
Stripping 18,040 LF $ 1 $ 26,158
Signage 75 EA $ 175 $ 13,125
Entry Feature / Gate 1 LSUM $ 85,000 $ 85,000
Landscaping (ROW) 8 LSUM $ 2,750 $ 22,000
Misc 1 LSUM $ 75,000 $ 75,000

Subtotal $ 507,283

TOTAL OFFSITE - Primary $ 6,590,227


TOTAL ONSITE - Primary $ 5,482,458
TOTAL ONSITE - Secondary $ 9,549,130

TOTAL COSTS $ 21,621,815


INFRASTRUCTURE DEVELOPMENT - PROJECT

PRIMARY - ONSITE CONSTRUCTION SECONDARY - ONSITE CO

Quantity Unit Unit/Cost Total

GRADING & PAVING (Onsite) 1 5,280 GRADING & PAVING (Onsite)


1 43,560 Km 5.76
Roadway (Primary) 19,024 LF Mi 3.60 Roadways (Secondary)

Mobilization 1 LSUM $ 50,000 $ 50,000 Mobilization


Clearing / Grubbing - 60' CS 26.20 AC $ 1,500 $ 39,306 Clearing / Grubbing - 40' CS
Rough Grading - 54' CS 1,027,296 SQFT $ 0.25 $ 256,824 Rough Grading - 34' CS
Finish Subgrade 1/10th grade AB 4" - 48' CS 913,152 SQFT $ 0.35 $ 319,603 Finish Subgrade 1/10th grade AB 4" -
Paving 2.5" AC - 48' CS 913,152 SQFT $ 2.25 $ 2,054,592 Paving 2.5" AC - 24' CS
Thickened Edge 19,024 LF $ 0.35 $ 6,658 Thickened Edge
Water Adjustments 20 SF $ 125 $ 2,500 Water Adjustments
Hydrants Markers 6 SF $ 52 $ 312 Hydrants Markers
Survey Monuments 6 EA $ 240 $ 1,440 Survey Monuments

Rough Grading - PADS Phase II & III 1,599,620 SQYD $ 0.27 $ 431,897

Subtotal $ 3,163,133

GRADING & PAVING (Coastal Road) 1 5,280 GRADING & PAVING (Coastal Road)
1 43,560 Km 4.37
Roadway (Primary) 14,433 LF Mi 2.73 Roadways (Secondary)

Clearing / Grubbing - 50' CS 16.57 AC $ 1,250 $ 20,709 Clearing / Grubbing -30' CS

Rough Grading - 45' CS 649,485 SQFT $ 0.25 $ 162,371 Rough Grading - 28' CS
Finish Subgrade 1/10th AB 4" - 30 CS 432,990 SQFT $ 0.35 $ 151,547 Finish Subgrade 1/10th grade AB 4" -
Paving 2.5" AC - 30' CS 432,990 SQFT $ 2.25 $ 974,228 Paving 2.5" AC - 24' CS
Thickened Edge 14,433 LF $ 0.35 $ 5,052 Thickened Edge
Water Adjustments 10 SF $ 125 $ 1,250 Water Adjustments
Hydrants Markers 3 SF $ 52 $ 156 Hydrants Markers
Survey Monuments 3 EA $ 240 $ 720 Survey Monuments

Subtotal $ 1,316,031

CONCRETE, CULVERTS & RIP RAP (Onsite) CONCRETE, CULVERTS & RIP RAP (On

Off-System Culvert 15,000 SF $ 185 $ 2,775,000 Off-System Culvert


12" Concrete Pavement Edge 56,877 LF $ 6 $ 341,261 8" Concrete Pavement Edge
2' Wedge Curb 6,691 LF $ 8 $ 53,531 2' Wedge Curb
14" Extruded Vertical Curb 3,346 LF $ 12 $ 40,148 14" Extruded Vertical Curb
Concrete Header 1,443 LF $ 11 $ 15,876 Concrete Header
Scupper / Rip Rap 8 LSUM $ 3,500 $ 28,000 Scupper / Rip Rap

Subtotal $ 3,253,817

UTILITY CONSTRUCTION (Onsite - Primary) UTILITY CONSTRUCTION (Onsite - Sec

Excavation - Waterline Trench 19,024 LF $ 14 $ 266,336 Excavation - Waterline Trench


Waterline PVC Sched. 40 8" & 12" 19,024 LF $ 22.00 $ 418,528 Waterline PVC Sched. 40 6" & 8"
Fire Hydrants 18 SF $ 2,400 $ 43,200 Fire Hydrants
Hydrant Lines 2,283 LF $ 19 $ 42,804 Hydrant Lines
Water Services 1.5" - 3.5" 10 LF $ 475 $ 4,750 Water Services 1.5" - 3.5"
Service Lines 4,185 LF $ 14 $ 58,594 Service Lines
Sand / Backfill 19,024 LF $ 3 $ 61,828 Sand / Backfill
Test 1 LSUM $ 5,500 $ 5,500 Test
Barricades 1 LSUM $ 3,500 $ 3,500 Barricades

Electric / Tel. Trench / Pads / Conduit 4" 19,024 LF $ 18 $ 334,822 Electric / Tel. Trench / Pads / Conduit
Install 2.5" Primary Electric Line 19,024 LF $ 4.50 $ 85,608 Install 2.5" Primary Electric Line
Transformers 23 SF $ 1,250 $ 28,750 Transformers
Test 1 SF $ 5,500 $ 5,500 Test
Transmission & Distribution Substations See Cost Detail Transmission & Distribution Substatio

Excavation - Sewer Trench 19,024 LF $ 28 $ 532,672 Excavation - Sewer Trench


Sewer 8" & 12" PVC Pipe 1,200 LF $ 25 $ 30,000 Sewer 6" & 8" PVC Pipe
Sewer 8" & 12" DIP 1,000 LF $ 35 $ 35,000 Sewer 6" & 8" DIP
Manholes / Cleanouts 11 SF $ 2,300 $ 25,300 Manholes / Cleanouts

Subtotal $ 1,982,692

MISC.(Onsite) MISC.(Onsite)

Multi Use Trail / Ped (graded) 60,000 LF $ 12 $ 720,000 Multi Use Trail / Ped (graded)
Construction Fencing / Signage / Run Off 6 LSUM $ 3,500 $ 21,000 Construction Fencing / Signage / Run
Retention / Detention Basins 25,000 SQFT $ 5 $ 131,250 Retention / Detention Basins
Landscaping (ROW) 20 LSUM $ 2,750 $ 55,000 Landscaping (ROW)
5' Wall / Fencing / Drainage 12,500 LF $ 8 $ 100,000 5' Wall / Fencing / Drainage
Stripping 19,024 LF $ 1 $ 27,585 Stripping
Signage 50 EA $ 175 $ 8,750 Signage
Entry Feature / Gate / Guard House 1 LSUM $ 85,000 $ 85,000 Entry Feature / Gate

Subtotal $ 1,148,585

TOTAL ONSITE - Primary $ 10,864,258

PRIMARY - OFFSITE CONSTRUCTION

Quantity Unit Unit/Cost Total

GRADING & PAVING (Off Site) 1 5,280


Km 6.01
Roadway (Primary) 18,040 LF Mi 3.42
Clearing / Grubbing - 87' CS 36.03 AC $ 1,500 $ 54,045
Rough Grading - 72' CS 1,298,880 SQFT $ 0.25 $ 324,720
Subgrade 1/10th AB - 60' CS 1,082,400 SQFT $ 0.35 $ 378,840
Paving 2.5" AC - 60' CS 1,082,400 SQFT $ 2.25 $ 2,435,400
Thickened Edge 18,040 LF $ 0.35 $ 6,314
Water Adjustments 19 EA $ 125 $ 2,375
Hydrants Markers 14 EA $ 52 $ 728
Survey Monuments 61 EA $ 240 $ 14,640

Subtotal $ 3,217,062

CONCRETE & RIP RAP

Off-System Culvert 7,500 SF $ 185 $ 1,387,500


12" Concrete Pavement Edge 25,256 LF $ 6 $ 151,536
2' Wedge Curb 5,412 LF $ 8 $ 43,296
14" Extruded Vertical Curb 3,608 LF $ 12 $ 43,296
Concrete Header 1,804 LF $ 11 $ 19,844
Scupper / Rip Rap 4 LSUM $ 3,500 $ 14,000

Subtotal $ 1,659,472

UTILITY CONSTRUCTION (Offsite - Primary)

Excavation - Waterline Trench 18,040 LF $ 14 $ 252,560


Waterline PVC Sched. 40 8" & 12" 18,040 LF $ 22 $ 396,880
Hydrant Lines 2,165 LF $ 19 $ 40,590
Sand / Backfill 18,040 LF $ 3 $ 58,630
Test 1 LSUM $ 5,500 $ 5,500
Barricades 1 LSUM $ 3,500 $ 3,500

Electric / Tel. Trench / Pads / Conduit 4" 18,040 LF $ 18 $ 324,720


Install 2.5" Primary Electric Line 18,040 LF $ 5 $ 81,180
Transformers 21 SF $ 1,250 $ 26,250
Test 1 SF $ 5,500 $ 5,500
Transmission & Distribution Substations See Cost Detail

Subtotal $ 1,195,310

MISC. (Offsite)

Multi Use Trail / Ped (graded) 5,000 LF $ 12 $ 60,000


Construction Fencing/Signage 4 LSUM $ 3,500 $ 14,000
Retention/Detention Basins 15,000 SQFT $ 5 $ 78,750
Landscaping (ROW) 15 LSUM $ 2,750 $ 41,250
5' Wall / Fencing / Drainage 11,500 LF $ 8 $ 92,000
Stripping 18,040 LF $ 1 $ 26,158
Signage 75 EA $ 175 $ 13,125
Entry Feature / Gate 1 LSUM $ 85,000 $ 85,000
Landscaping (ROW) 8 LSUM $ 2,750 $ 22,000
Misc 1 LSUM $ 55,000 $ 55,000

Subtotal $ 487,283

TOTAL OFFSITE - Primary $ 6,559,127


TOTAL ONSITE - Primary $ 10,864,258
TOTAL ONSITE - Secondary $ 12,580,140

TOTAL COSTS $ 30,003,526


ONSITE CONSTRUCTION

Quantity Unit Unit/Cost Total

1 5,280
Km 14.71
48,544 LF Mi 9.19

1 LSUM $ 25,000 $ 25,000


44.58 AC $ 1,500 $ 66,865
1,650,496 SQFT $ 0.25 $ 412,624
grade AB 4" - 24' CS 1,165,056 SQFT $ 0.35 $ 407,770
1,165,056 SQFT $ 2.25 $ 2,621,376
48,544 LF $ 0.35 $ 16,990
17 SF $ 125 $ 2,125
12 SF $ 52 $ 624
18 EA $ 240 $ 4,320

Subtotal $ 3,557,694

1 5,280
Km 3.18
10,500 LF Mi 1.99

7.23 AC $ 1,250 $ 9,039

294,000 SQFT $ 0.25 $ 73,500


h grade AB 4" - 24' CS 252,000 SQFT $ 0.35 $ 88,200
252,000 SQFT $ 2.25 $ 567,000
10,500 LF $ 0.35 $ 3,675
12 SF $ 125 $ 1,500
6 SF $ 52 $ 312
6 EA $ 240 $ 1,440

Subtotal $ 744,666

& RIP RAP (Onsite)

10,000 SF $ 185 $ 1,850,000


100,375 LF $ 4 $ 401,499
11,809 LF $ 8.00 $ 94,470
5,904 LF $ 12 $ 70,853
1,000 LF $ 11 $ 11,000
5 LSUM $ 3,500 $ 17,500

Subtotal $ 2,445,322

N (Onsite - Secondary)

48,544 LF $ 12 $ 582,528
48,544 LF $ 20.00 $ 970,880
44 SF $ 2,400 $ 105,600
5,825 LF $ 19 $ 109,224
500 LF $ 475 $ 237,500
10,680 LF $ 14 $ 149,516
48,544 LF $ 3 $ 157,768
1 LSUM $ 5,500 $ 5,500
1 LSUM $ 3,500 $ 3,500

ads / Conduit 4" 48,544 LF $ 18 $ 854,374


48,544 LF $ 4.50 $ 218,448
54 SF $ 1,250 $ 67,500
1 SF $ 5,500 $ 5,500
tion Substations See Cost Detail

48,544 LF $ 24 $ 1,165,056
13,500 LF $ 20 $ 270,000
1,500 LF $ 30 $ 45,000
26 SF $ 2,300 $ 59,800

Subtotal $ 5,007,694

30,000 LF $ 12 $ 360,000
Signage / Run Off 4 LSUM $ 3,500 $ 14,000
12,500 SQFT $ 5 $ 65,625
30 LSUM $ 2,750 $ 82,500
5,000 LF $ 8 $ 40,000
48,544 LF $ 1 $ 70,389
70 EA $ 175 $ 12,250
4 LSUM $ 45,000 $ 180,000

Subtotal $ 824,764

TOTAL ONSITE - Secondary $ 12,580,140


ELECTRICAL - WATER - TELECOMMUNICATION SYSTEMS

WATER COLLECTION & STORAGE SYSTEM

Quantity Unit Cost Total

3-pump booster station 3 $ 275,000 $ 825,000


in-line variable frequency drives (VFDs)
industrial fire suppression up to 2,400-gpm @ 72-psi for three hours

Storage tanks - concrete bottom - 350K Gal cap 2 $ 850,000 $ 1,700,000


Storage tanks - concrete bottom - 250K Gal cap 2 $ 650,000 $ 1,300,000
Storage tank - concrete bottom - 150K Gal cap 1 $ 400,000 $ 400,000

single-pump booster station 6 $ 150,000 $ 900,000

SCADA Telemetry System 1 $ 120,000 $ 120,000

Building 20'X50' 1 $ 100,000 $ 100,000


Tank Excavation - Partial Bury 5 $ 85,000 $ 425,000
Retaining Walls 100'/per 5 $ 20,000 $ 100,000
Rir Rap 2000 SF/per 5 $ 5,000 $ 25,000
Rock Work 5 $ 3,500 $ 17,500
Landscaping 5 $ 4,500 $ 22,500

Total $ 5,935,000

ELECTRICAL & DISTRIBUTION SUBSTATIONS

Quantity Unit Cost Total

12.5-kV feeders 3 $ 80,000 $ 240,000


three 12.5-kV, 1200-A line bays (total 2 circuit breakers, 12 switches)

25-MVA1 15/12.5-kV transformers 2 $ 350,000 $ 700,000


2.5-MVAR, 12.5-kV capacitors 2 $ 185,000 $ 370,000

1 15-kV lines feeding the substation 2 $ 850,000 $ 1,700,000

LTC (Voltage Regulation) Trsfm 2 $ 180,000 $ 360,000


one 15/20/25-MVA, 67/12.47-kV transformer load-tap changer 1 $ 215,000 $ 215,000

Building 20'X50' - 1000 SF 1 $ 100 $ 100,000

Total $ 3,685,000

TELECOMMUNICATIONS SYSTEM

Quantity Unit Cost Total

Disguised Cell Towers 4 $ 85,000 $ 340,000


Satelite Banks 3 $ 75,000 $ 225,000
Technical Consultant/Engineer 1 $ 85,000 $ 85,000

Total $ 650,000
BOUTIQUE HOTEL-CONDO / SPA / BEACH CLUB

CONSTRUCTION DETAIL

200000 88 200000 2015


Boutique Hotel-Condo Budget
SqFt Total per key per sq ft Q1 Q2
Room Modules @ 931 SqFt 1,578 $ 27,777,778 $ 454,545 $ 200.00 $ 3,472,222 $ 3,472,222
Hotel Sub and Main Lobby @ SqFt 11,111 $ 722,222 $ 8,207 $ 65.00 $ 505,556 $ 216,667
Circulation (19,867 per floor) 50,000 $ 2,500,000 $ 28,409 $ 50.00 $ 312,500 $ 312,500
Site Development $ 3,200,000 $ 36,364 $ 16.00 $ 1,600,000 $ 1,600,000
Builders risk insurance $ 1,000,000 $ 11,364 $ 5.00 $ 1,000,000
Permitting $ 150,000 $ 1,705 $ 0.75 $ 150,000
Telecom Systems $ 300,000 $ 3,409 $ 1.50
Equipment $ 1,710,000 $ 19,432 $ 8.55
Supplies $ 500,000 $ 5,682 $ 2.50
Operating Systems $ 900,000 $ 10,227 $ 4.50
FF&E $ 1,000,000 $ 11,364 $ 5.00
Contingency $ 200,000 $ 2,273 $ 1.00 $ 25,000 $ 25,000
Developer Fee $ 400,000 $ 4,545 $ 2.00 $ 50,000 $ 50,000

Total Hotel- Condo Dev Costs $ 40,360,000 $ 597,525 $ 202 $ 7,115,278 $ 5,676,389

20000 12 20000 2015


Spa Budget
Total per key per sq ft Q1 Q2
Main Buildings 1,667 $ 2,500,000 $ 208,333 $ 125.00 $ 312,500 $ 312,500
Site Development $ 100,000 $ 8,333 $ 5.00 $ 100,000
Permitting $ 15,000 $ 1,250 $ 0.75 $ 15,000
Telecom & Systems $ 30,000 $ 2,500 $ 1.50
Equipment $ 600,000 $ 50,000 $ 30.00
Supplies $ 70,000 $ 5,833 $ 3.50
Operating Systems $ 90,000 $ 7,500 $ 4.50
FF&E $ 100,000 $ 8,333 $ 5.00
Contingency $ 40,000 $ 3,333 $ 2.00 $ 5,000 $ 5,000
Developer Fee $ 80,000 $ 6,667 $ 4.00 $ 10,000 $ 10,000

Total Spa Dev Costs $ 3,625,000 $ 302,083 $ 181 $ 442,500 $ 327,500

5500 8 5500 2015


Beach Club Budget
Total per key per sq ft Q1 Q2
Main Buildings 688 $ 495,000 $ 61,875 $ 90.00 $ 61,875 $ 61,875
Site Development $ 24,750 $ 3,094 $ 4.50 $ 17,325 $ 7,425
Permitting $ 15,000 $ 1,875 $ 0.01 $ 15,000
Telecom & Systems $ 14,080 $ 1,173 $ 2.56
Equipment $ 302,500 $ 37,813 $ 55.00
FF&E $ 122,650 $ 10,221 $ 22.30
Contingency $ 851,330 $ 106,416 $ 1.00 $ 106,416 $ 106,416
Developer Fee $ 1,702,660 $ 212,833 $ 2.00 $ 212,833 $ 212,833

Total Beach Club Dev Costs $ 3,527,970 $ 435,299 $ 641 $ 413,449 $ 388,549
225,500 sf

Grand Totals $ 47,512,970 $ 539,920 $ 211 $ 7,971,227 $ 6,392,438


2015 2016 33,333
Q3 Q4 Q1 Q2 Q3 Q4
$ 3,472,222 $ 3,472,222 $ 3,472,222 $ 3,472,222 $ 3,472,222 $ 3,472,222 $ 27,777,778
$ 722,222
$ 312,500 $ 312,500 $ 312,500 $ 312,500 $ 312,500 $ 312,500 $ 2,500,000
$ 3,200,000
$ 1,000,000
$ 150,000
$ 120,000 $ 180,000 $ 300,000
$ 427,500 $ 427,500 $ 427,500 $ 427,500 $ 1,710,000
$ 125,000 $ 125,000 $ 125,000 $ 125,000 $ 500,000
$ 225,000 $ 225,000 $ 225,000 $ 225,000 $ 900,000
$ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 1,000,000
$ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 200,000
$ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 400,000
$ -
$ 3,859,722 $ 3,859,722 $ 4,887,222 $ 4,887,222 $ 5,007,222 $ 5,067,222 $ 40,360,000
$ -
2015 2016
Q3 Q4 Q1 Q2 Q3 Q4
$ 312,500 $ 312,500 $ 312,500 $ 312,500 $ 312,500 $ 312,500 $ 2,500,000
$ 100,000
$ 15,000
$ 12,000 $ 18,000 $ 30,000
$ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 600,000
$ 17,500 $ 17,500 $ 17,500 $ 17,500 $ 70,000
$ 22,500 $ 22,500 $ 22,500 $ 22,500 $ 90,000
$ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 100,000
$ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 40,000
$ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 80,000
$ -
$ 327,500 $ 327,500 $ 542,500 $ 542,500 $ 554,500 $ 560,500 $ 3,625,000
$ -
2015 2016
Q3 Q4 Q1 Q2 Q3 Q4
$ 61,875 $ 61,875 $ 61,875 $ 61,875 $ 61,875 $ 61,875 $ 495,000
$ 24,750
$ 15,000
$ 7,040 $ 7,040 $ 14,080
$ 75,625 $ 75,625 $ 75,625 $ 75,625 $ 302,500
$ 61,325 $ 61,325 $ 122,650
$ 106,416 $ 106,416 $ 106,416 $ 106,416 $ 106,416 $ 106,416 $ 851,330
$ 212,833 $ 212,833 $ 212,833 $ 212,833 $ 212,833 $ 212,833 $ 1,702,660
$ -
$ 381,124 $ 381,124 $ 456,749 $ 456,749 $ 525,114 $ 525,114 $ 3,527,970
$ -

$ 4,568,346 $ 4,568,346 $ 5,886,471 $ 5,886,471 $ 6,086,836 $ 6,152,836 $ 47,512,970


HOTEL-CONDO / SPA / BEACH CLUB

CASH FLOW DETAIL

ROOM DATA 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029

Number of Rooms 88 88 88 88 88 88 88 88 88 88 88 88 88 88
Number of Condo-Hotel Rooms in Program 35.0% 31 11 22 22 22 27 27 27 28 28 29 30 30 30

Annual Rooms Available 28,105 24,090 24,090 24,090 22,265 22,265 22,265 21,900 21,900 21,535 21,170 21,170 21,170
Annual Condo-Hotel Rooms Available 4,015 8,030 8,030 8,030 9,855 9,855 9,855 10,220 10,220 10,585 10,950 10,950 10,950

Paid Occupied Rooms - 8,913 9,154 9,395 8,906 9,351 9,797 9,855 10,950 11,306 11,125 11,136 11,136
Paid Occupied Condo-Hotel Rooms - 2,971 3,051 3,132 3,942 4,139 4,336 4,599 5,110 5,557 5,754 5,760 5,760

Paid Occupancy 0% 37% 38% 39% 40% 42% 44% 45% 50% 53% 53% 53% 53%
Average Room Rate 3.0% $165.00 $178.20 $187.11 $192.72 $198.50 $204.46 $210.59 $216.91 $223.42 $230.12 $237.03 $244.14 $251.46
RevPAR $0.00 $65.93 $71.10 $75.16 $79.40 $85.87 $92.66 $97.61 $111.71 $120.81 $124.56 $128.43 $132.28

REVENUE

Rooms $0 $1,588,350 $1,712,842 $1,810,655 $1,767,886 $1,911,968 $2,063,105 $2,137,666 $2,446,439 $2,601,727 $2,636,993 $2,718,819 $2,800,384
Condo-Hotel Rooms $0 $529,450 $570,947 $603,552 $782,507 $846,281 $913,178 $997,577 $1,141,672 $1,278,815 $1,363,962 $1,406,286 $1,448,474

Food 10% $0 $211,780 $228,379 $241,421 $255,039 $275,825 $297,628 $313,524 $358,811 $388,054 $400,096 $412,511 $424,886
Beverage 7% $0 $148,246 $159,865 $168,994 $178,527 $193,077 $208,340 $219,467 $251,168 $271,638 $280,067 $288,757 $297,420
Telecommunications 4% $0 $84,712 $91,352 $96,568 $102,016 $110,330 $119,051 $125,410 $143,524 $155,222 $160,038 $165,004 $169,954

Spa 30% $0 $535,274 $578,941 $613,812 $624,266 $680,222 $739,471 $775,973 $905,183 $981,932 $1,006,137 $1,037,579 $1,068,706
Rental & Other Income $0 $118,844 $122,056 $125,268 $128,480 $134,904 $141,328 $144,540 $160,600 $168,630 $168,799 $168,967 $168,967

TOTAL REVENUE $0 $3,216,656 $3,464,382 $3,660,269 $3,838,721 $4,152,607 $4,482,100 $4,714,156 $5,407,397 $5,846,018 $6,016,092 $6,197,924 $6,378,792

DEPARTMENTAL EXPENSES
Rooms - (16% of Rooms Revenue) 16% $0 $338,848 $365,406 $386,273 $408,063 $441,320 $476,205 $501,639 $574,098 $620,887 $640,153 $660,017 $679,817
Food & Beverage - (60% of F&B Revenues) 60% $0 $216,016 $232,947 $246,249 $260,140 $281,341 $303,581 $319,795 $365,987 $395,815 $408,097 $420,761 $433,384
Telecommunications - (60% of Tele Revenues) 60% $0 $50,827 $54,811 $57,941 $61,209 $66,198 $71,431 $75,246 $86,115 $93,133 $96,023 $99,003 $101,973
Spa - (22% of Spa Revenues) 18% $0 $96,349 $104,209 $110,486 $112,368 $122,440 $133,105 $139,675 $162,933 $176,748 $181,105 $186,764 $192,367
Rental & Other Income - (10% of Oth. Rev.) 10% $0 $11,884 $12,206 $12,527 $12,848 $13,490 $14,133 $14,454 $16,060 $16,863 $16,880 $16,897 $16,897

TOTAL DEPARTMENTAL EXPENSES $0 $713,925 $769,579 $813,476 $854,628 $924,790 $998,454 $1,050,808 $1,205,193 $1,303,446 $1,342,258 $1,383,441 $1,424,437

DEPARTMENTAL INCOME $0 $2,502,732 $2,694,804 $2,846,794 $2,984,093 $3,227,818 $3,483,646 $3,663,348 $4,202,204 $4,542,572 $4,673,834 $4,814,483 $4,954,355

UNDISTRIBUTED OPERATING EXPENSES


Administrative & General - (7.5% of Revenues) 7.5% $0 $241,249 $259,829 $274,520 $287,904 $311,446 $336,158 $353,562 $405,555 $438,451 $451,207 $464,844 $478,409
Management Fee - (2% of Revenues) 2.0% $0 $64,333 $69,288 $73,205 $76,774 $83,052 $89,642 $94,283 $108,148 $116,920 $120,322 $123,958 $127,576
Franchise Fees 0.0% $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Marketing - (1.5% of Revenues) 2.5% $0 $80,416 $86,610 $91,507 $95,968 $103,815 $112,053 $117,854 $135,185 $146,150 $150,402 $154,948 $159,470
Property Oper & Maint - (4.5% of Rev.) 5.5% $0 $176,916 $190,541 $201,315 $211,130 $228,393 $246,516 $259,279 $297,407 $321,531 $330,885 $340,886 $350,834
Utility Costs - (3.5% of Revenues) 3.5% $0 $112,583 $121,253 $128,109 $134,355 $145,341 $156,874 $164,995 $189,259 $204,611 $210,563 $216,927 $223,258

TOTAL UNDISTRIBUTED OPERATING EXPENSES $0 $675,498 $727,520 $768,657 $806,131 $872,048 $941,241 $989,973 $1,135,553 $1,227,664 $1,263,379 $1,301,564 $1,339,546

INCOME AFTER UOE $0 $1,827,234 $1,967,283 $2,078,137 $2,177,961 $2,355,770 $2,542,405 $2,673,375 $3,066,651 $3,314,908 $3,410,455 $3,512,919 $3,614,809

FIXED CHARGES
Property Taxes 1% $0 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167 $32,167
Insurance - (% of Revenues) 1.2% $0 $38,600 $39,372 $40,159 $40,962 $41,782 $42,617 $43,470 $44,339 $45,226 $46,130 $47,053 $47,994
Restaurant Lease Income $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Spa Lease Income $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Reserves for Replacement - (1% - 3% of Rev.) $0 $32,167 $34,644 $36,603 $76,774 $83,052 $89,642 $94,283 $108,148 $116,920 $120,322 $123,958 $127,576
1.0% 1% 1% 1% 2% 2% 2% 2% 2% 2% 2% 2% 2%
TOTAL FIXED CHARGES $0 $102,933 $106,182 $108,929 $149,903 $157,000 $164,426 $169,919 $184,654 $194,313 $198,619 $203,178 $207,736

EBITDA $0 $1,724,301 $1,861,101 $1,969,208 $2,028,058 $2,198,770 $2,377,979 $2,503,456 $2,881,997 $3,120,595 $3,211,836 $3,309,741 $3,407,072

BELOW NOI ANALYSIS

Incentive Management Fee 0.0% $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0


Distribution to Condo-Hotel Unit Owners 0.0% $0 $233,974 $252,313 $271,900 $359,364 $396,199 $435,819 $485,344 $566,235 $646,569 $703,010 $738,899 $775,844
-$75 -$79 -$83 -$87 -$91 -$96 -$101 -$106 -$111 -$116 -$122 -$128 -$135
CASH FLOW AFTER OTHER ITEMS $0 $1,490,327 $1,608,788 $1,697,308 $1,668,694 $1,802,571 $1,942,160 $2,018,111 $2,315,763 $2,474,026 $2,508,825 $2,570,841 $2,631,228

2018 2019 2020 2021


EBITDA $1,724,301 $1,861,101 $1,969,208 $2,028,058
MEDICAL & SURGICAL FACILITY
ENT - Ophthamology - Orthopaedic - Plastic Surgery

CONSTRUCTION DETAIL

8000 2015
MEDICAL FACILITIES 16 500
Total per key per sq ft Q1 Q2
Recovery Room Modules 8000 $ 720,000 $ 45,000 $ 90.00 $ 90,000 $ 90,000
Main Lobby 3000 $ 225,000 $ 14,063 $ 75.00 $ 157,500 $ 67,500
Circulation (9,200 per floor) 1333 $ 73,333 $ 4,583 $ 55.00 $ 9,167 $ 9,167
Site Development $ 40,810 $ 2,551 $ 3.71 $ 40,810
Builders risk insurance $ 18,810 $ 1,176 $ 1.71 $ 2,351 $ 2,351
Permitting $ 35,000 $ 2,188 $ 0.01 $ 35,000
Telecom Systems $ 39,710 $ 2,482 $ 3.61
Equipment $ 500,060 $ 31,254 $ 45.46
Supplies $ 183,480 $ 11,468 $ 16.68
Operating Systems $ 70,880 $ 4,430 $ 8.86
FF&E $ 181,760 11,360 $ 22.72
Contingency $ 62,665 $ 3,917 3.0% $ 7,833 $ 7,833
Developer Fee $ 41,777 $ 2,611 2.0% $ 5,222 $ 5,222

TOTAL MEDICAL FACILITIES $ 2,193,286 $ 137,080 $ 274 $ 347,883 $ 182,073

6000 4 6000 2015


SURGICAL CENTER
Total per key per sq ft Q1 Q2
Main Building / Offices @ 2200 SqFt $ 600,000 $ 150,000 $ 100.00 $ 75,000 $ 75,000
Reception / Lobby @ 800 SqFt $ 45,000 $ 11,250 $ 75.00 $ 5,625 $ 5,625
Service / Utility @ 800 SqFt $ 60,000 $ 15,000 $ 75.00
Operating Rooms 4 @ 600 SqFt $ 407,000 $ 101,750 $ 185.00 $ 284,900 $ 122,100
Permitting $ 60,000 $ 15,000 $ 0.01 $ 60,000
Telecom & Systems $ 21,660 $ 5,415 $ 3.61
Equipment $ 1,650,000 $ 412,500 $ 275.00
Supplies $ 900,000 $ 225,000 $ 150.00
Operating Systems $ 83,160 $ 20,790 $ 13.86
FF&E $ 160,320 $ 40,080 $ 26.72
Contingency $ 119,614 $ 29,904 3.0% $ 14,952 $ 14,952
Developer Fee $ 79,743 $ 19,936 2.0% $ 9,968 $ 9,968

TOTAL SURGICAL CENTER $ 4,186,497 $ 1,046,624 $ 698 $ 450,445 $ 227,645


14,000 sf
MEDICAL & SURGICAL TOTALS $ 6,379,783 $ 398,736 $ 456 $ 798,328 $ 409,718
2015 2016 Proof

Q3 Q4 Q1 Q2 Q3 Q4
$ 90,000 $ 90,000 $ 90,000 $ 90,000 $ 90,000 $ 90,000 $ 720,000
$ 225,000
$ 9,167 $ 9,167 $ 9,167 $ 9,167 $ 9,167 $ 9,167 $ 73,333
$ 40,810
$ 2,351 $ 2,351 $ 2,351 $ 2,351 $ 2,351 $ 2,351 $ 18,810
$ 35,000
$ 15,884 $ 23,826 $ 39,710
$ 125,015 $ 125,015 $ 125,015 $ 125,015 $ 500,060
$ 45,870 $ 45,870 $ 45,870 $ 45,870 $ 183,480
$ 17,720 $ 17,720 $ 17,720 $ 17,720 $ 70,880
$ 45,440 $ 45,440 $ 45,440 $ 45,440 $ 181,760
$ 7,833 $ 7,833 $ 7,833 $ 7,833 $ 7,833 $ 7,833 $ 62,665
$ 5,222 $ 5,222 $ 5,222 $ 5,222 $ 5,222 $ 5,222 $ 41,777
$ -
$ 114,573 $ 114,573 $ 348,618 $ 348,618 $ 364,502 $ 372,444 $ 2,193,286
$ -
2015 2016
Q3 Q4 Q1 Q2 Q3 Q4
$ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 600,000
$ 5,625 $ 5,625 $ 5,625 $ 5,625 $ 5,625 $ 5,625 $ 45,000
$ 12,000 $ 12,000 $ 12,000 $ 12,000 $ 12,000 $ 60,000
$ 407,000
$ 60,000
$ 8,664 $ 12,996 $ 21,660
$ 412,500 $ 412,500 $ 412,500 $ 412,500 $ 1,650,000
$ 225,000 $ 225,000 $ 225,000 $ 225,000 $ 900,000
$ 20,790 $ 20,790 $ 20,790 $ 20,790 $ 83,160
$ 40,080 $ 40,080 $ 40,080 $ 40,080 $ 160,320
$ 14,952 $ 14,952 $ 14,952 $ 14,952 $ 14,952 $ 14,952 $ 119,614
$ 9,968 $ 9,968 $ 9,968 $ 9,968 $ 9,968 $ 9,968 $ 79,743

$ 105,545 $ 117,545 $ 815,915 $ 815,915 $ 824,579 $ 828,911 $ 4,186,497


$ -
$ 220,118 $ 232,118 $ 1,164,533 $ 1,164,533 $ 1,189,081 $ 1,201,355 $ 6,379,783
MEDICAL & SURGICAL FACILITY
ENT - Ophthamology - Orthopaedic - Plastic Surgery

INCOME DETAIL

CALENDAR YEAR 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
Number of Recovery Rooms 16 16 16 16 16 16 16 16 16 16 16 16 16 16
Annual Rooms Available 5,840 5,840 5,840 5,840 5,840 5,840 5,840 5,840 5,840 5,840 5,840 5,840 5,840
Paid Occupied Rooms - 1,752 1,927 2,120 2,226 2,449 2,693 2,963 2,963 2,963 2,963 3,052 3,052

Number of Surgical Rooms 4 4 4 4 4 4 4 4 4 4 4 4 4 4


Annual Rooms Available 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080
Paid Occupancy 324 356 392 412 453 498 548 548 548 548 564 564

Paid Occupancy 0% 30% 33% 36% 38% 42% 46% 51% 51% 51% 51% 52% 52%
Average Rate 1.0% $185.00 $185.00 $194.25 $196.19 $198.15 $200.14 $202.14 $204.16 $206.20 $208.26 $210.34 $212.45 $214.57
RevPAR $0.00 $55.46 $64.06 $71.17 $75.47 $83.85 $93.16 $103.50 $104.54 $105.58 $106.64 $110.93 $112.04

REVENUE
Rooms $0 $324,120 $374,359 $415,912 $441,075 $490,034 $544,428 $604,860 $610,908 $617,017 $623,188 $648,302 $654,785
General Medical Procedures @ $450/per $450 $788,400 $867,240 $953,964 $1,001,662 $1,101,828 $1,212,011 $1,333,212 $1,333,212 $1,333,212 $1,333,212 $2,628,000 $1,373,209
Surgical Procedures @ $14.5K/per $7,500 $2,430,000 $2,673,000 $2,940,300 $3,087,315 $3,396,047 $3,735,651 $4,109,216 $4,109,216 $4,109,216 $4,109,216 $4,232,493 $4,232,493
Pharmaceutical @ $ 300/per $200 $64,800 $71,280 $78,408 $82,328 $90,561 $99,617 $109,579 $109,579 $109,579 $109,579 $112,866 $112,866

Food & Beverage 8% $0 $25,930 $29,949 $33,273 $35,286 $39,203 $43,554 $48,389 $48,873 $49,361 $49,855 $51,864 $52,383

Telecommunications 4% $0 $12,965 $14,974 $16,636 $17,643 $19,601 $21,777 $24,194 $24,436 $24,681 $24,928 $25,932 $26,191

TOTAL REVENUE $0 $3,646,214 $4,030,802 $4,438,494 $4,665,310 $5,137,275 $5,657,039 $6,229,451 $6,236,225 $6,243,067 $6,249,978 $7,699,458 $6,451,927

DEPARTMENTAL EXPENSES
Rooms - (16% of Rooms Revenue) 16% $0 $51,859 $59,897 $66,546 $70,572 $78,406 $87,109 $96,778 $97,745 $98,723 $99,710 $103,728 $104,766
Food & Beverage - (60% of F&B Revenues) 60% $0 $15,558 $17,969 $19,964 $21,172 $23,522 $26,133 $29,033 $29,324 $29,617 $29,913 $31,119 $31,430
Telecommunications - (60% of Tele Revenues) 60% $0 $7,779 $8,985 $9,982 $10,586 $11,761 $13,066 $14,517 $14,662 $14,808 $14,957 $15,559 $15,715
Surgery - (20% of Surgical Proceedures) 20% $0 $486,000 $534,600 $588,060 $617,463 $679,209 $747,130 $821,843 $821,843 $821,843 $821,843 $846,499 $846,499
Rental & Other Income - (0% of Other Rev.) 0% $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

TOTAL DEPARTMENTAL EXPENSES $0 $561,196 $621,451 $684,552 $719,792 $792,897 $873,438 $962,171 $963,574 $964,991 $966,423 $996,905 $998,409

DEPARTMENTAL INCOME $0 $3,085,019 $3,409,350 $3,753,942 $3,945,517 $4,344,377 $4,783,602 $5,267,280 $5,272,651 $5,278,076 $5,283,555 $6,702,553 $5,453,519

UNDISTRIBUTED OPERATING EXPENSES


Administrative & General - (7.5% of Revenues) 7.5% $0 $273,466 $302,310 $332,887 $349,898 $385,296 $424,278 $467,209 $467,717 $468,230 $468,748 $577,459 $483,895
Management Fee - (2% of Revenues) 3.0% $0 $109,386 $120,924 $133,155 $139,959 $154,118 $169,711 $186,884 $187,087 $187,292 $187,499 $230,984 $193,558
Physicians / Surgeons 40.0% $0 $1,313,280 $1,444,608 $1,589,069 $1,668,522 $1,835,374 $2,018,912 $2,220,803 $2,220,803 $2,220,803 $2,220,803 $2,789,344 $2,287,427
Marketing - (1.5% of Revenues) 2.5% $0 $91,155 $100,770 $110,962 $116,633 $128,432 $141,426 $155,736 $155,906 $156,077 $156,249 $192,486 $161,298
Franchise Fees $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Property Oper & Maint - (4.5% of Revenues) 4.5% $0 $164,080 $181,386 $199,732 $209,939 $231,177 $254,567 $280,325 $280,630 $280,938 $281,249 $346,476 $290,337
Utility Costs - (3.5% of Revenues) 2.5% $0 $91,155 $100,271 $110,298 $115,813 $127,394 $140,134 $154,147 $154,147 $154,147 $154,147 $158,771 $158,771

TOTAL UNDISTRIBUTED OPERATING EXPENSES $0 $2,042,523 $2,250,269 $2,476,103 $2,600,764 $2,861,792 $3,149,027 $3,465,104 $3,466,289 $3,467,487 $3,468,696 $4,295,520 $3,575,286

INCOME AFTER UOE $0 $1,042,496 $1,159,081 $1,277,839 $1,344,753 $1,482,586 $1,634,574 $1,802,176 $1,806,362 $1,810,589 $1,814,859 $2,407,033 $1,878,233

FIXED CHARGES
Property Taxes 1% $0 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462 $36,462
Insurance - (% of Revenues) 1.8% $0 $65,632 $66,944 $68,283 $69,649 $71,042 $72,463 $73,912 $75,390 $76,898 $78,436 $80,005 $81,605

Reserve for Replacement - (1.0% - 5.0% of Rev.) $0 $72,924 $80,616 $88,770 $93,306 $102,745 $113,141 $124,589 $124,725 $124,861 $125,000 $153,989 $129,039
1.0% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
Total Fixed Charges $0 $175,018 $184,023 $193,515 $199,417 $210,250 $222,066 $234,963 $236,577 $238,222 $239,898 $270,456 $247,106

EBITDA $0 $867,477 $975,059 $1,084,324 $1,145,336 $1,272,336 $1,412,509 $1,567,213 $1,569,785 $1,572,368 $1,574,961 $2,136,577 $1,631,127

BELOW NOI ANALYSIS

Incentive Management Fee 0.0% $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0


Distribution 0.0% $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
CASH FLOW AFTER OTHER ITEMS $0 $867,477 $975,059 $1,084,324 $1,145,336 $1,272,336 $1,412,509 $1,567,213 $1,569,785 $1,572,368 $1,574,961 $2,136,577 $1,631,127

2017 2018 2019 2020


EBITDA $867,477 $975,059 $1,084,324 $1,145,336
COMMERCIAL DEVELOPMENT

41 33,456 2015 2016


OFFICE / RETAIL
Total per key / unit per sq ft Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Ofc / Retail Modules @ SqFt 816 $ 2,676,480 $ 65,280 $ 80.00 $ 334,560 $ 334,560 $ 334,560 $ 334,560 $ 334,560 $ 334,560 $ 334,560 $ 334,560 $ 2,676,480
Lobby $ 150,552 $ 3,672 $ 45.00 $ 105,386 $ 45,166 $ 150,552
Circulation (9,333 per floor) $ 20,400 $ 498 $ 25.00 $ 2,550 $ 2,550 $ 2,550 $ 2,550 $ 2,550 $ 2,550 $ 2,550 $ 2,550 $ 20,400
Site Development $ 204,000 $ 25,500 $ 8.50 $ 204,000 $ 204,000
Builders risk insurance $ 55,202 $ 6,900 $ 1.65 $ 6,900 $ 6,900 $ 6,900 $ 6,900 $ 6,900 $ 6,900 $ 6,900 $ 6,900 $ 55,202
Permitting $ 40,000 $ 976 $ 0.01 $ 40,000 $ 40,000
Telecom Systems $ 120,776 $ 2,946 $ 3.61 $ 48,310 $ 72,466 $ 120,776
Equipment $ 327,869 $ 7,997 $ 9.80 $ 81,967 $ 81,967 $ 81,967 $ 81,967 $ 327,869
Supplies $ 92,339 $ 2,252 $ 2.76 $ 23,085 $ 23,085 $ 23,085 $ 23,085 $ 92,339
Operating Systems $ 127,133 $ 3,101 $ 3.80 $ 31,783 $ 31,783 $ 31,783 $ 31,783 $ 127,133
FF&E $ 164,000 $ 4,000 $ 4.90 $ 41,000 $ 41,000 $ 41,000 $ 41,000 $ 164,000
Contingency $ 119,363 $ 2,911 3.0% $ 14,920 $ 14,920 $ 14,920 $ 14,920 $ 14,920 $ 14,920 $ 14,920 $ 14,920 $ 119,363
Developer Fee $ 79,575 $ 1,941 2.0% $ 9,947 $ 9,947 $ 9,947 $ 9,947 $ 9,947 $ 9,947 $ 9,947 $ 9,947 $ 79,575
$ -
TOTAL COMMERCIAL COSTS $ 4,177,688 $ 127,973 $ 125 $ 718,264 $ 414,043 $ 368,877 $ 368,877 $ 546,713 $ 546,713 $ 595,023 $ 619,178 $ 4,177,688
$ -
8 24,000 2015 2016
RESEARCH FACILITIES
Total per key / unit per sq ft Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Main Buildings $ 2,400,000 $ 300,000 $ 100.00 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 2,400,000
Site Development $ 157,200 $ 19,650 $ 6.55 $ 110,040 $ 47,160 $ 157,200
Permitting $ 40,000 $ 5,000 $ 0.01 $ 40,000 $ 40,000
Telecom & Systems $ 93,120 $ 11,640 $ 3.88 $ 37,248 $ 55,872 $ 93,120
Equipment $ 449,520 $ 56,190 $ 18.73 $ 112,380 $ 112,380 $ 112,380 $ 112,380 $ 449,520
Supplies $ 201,600 $ 25,200 $ 8.40 $ 50,400 $ 50,400 $ 50,400 $ 50,400 $ 201,600
Operating Systems $ 200,880 $ 25,110 $ 8.37 $ 50,220 $ 50,220 $ 50,220 $ 50,220 $ 200,880
FF&E $ 214,080 $ 26,760 $ 8.92 $ 53,520 $ 53,520 $ 53,520 $ 53,520 $ 214,080
Contingency $ 112,692 $ 14,087 3.0% $ 14,087 $ 14,087 $ 14,087 $ 14,087 $ 14,087 $ 14,087 $ 14,087 $ 14,087 $ 112,692
Developer Fee $ 75,128 $ 9,391 2.0% $ 9,391 $ 9,391 $ 9,391 $ 9,391 $ 9,391 $ 9,391 $ 9,391 $ 9,391 $ 75,128
$ -
TOTAL RESEARCH & DEVELOPMENT COSTS $ 3,944,220 $ 493,028 $ 164 $ 473,518 $ 370,638 $ 323,478 $ 323,478 $ 589,998 $ 589,998 $ 627,246 $ 645,870 $ 3,944,220
$ -
4 50,000 2015 2016
ORGANIC FARMING
Total per key / unit per sq ft Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Main Buildings $ 3,250,000 $ 812,500 $ 65.00 $ 406,250 $ 406,250 $ 406,250 $ 406,250 $ 406,250 $ 406,250 $ 406,250 $ 406,250 $ 3,250,000
Site Development $ 100,000 $ 25,000 $ 2.00 $ 70,000 $ 30,000 $ 100,000
Permitting $ 26,000 $ 6,500 $ 0.01 $ 26,000 $ 26,000
Telecom & Systems $ 57,000 $ 7,125 $ 1.14 $ 28,500 $ 28,500 $ 57,000
Equipment $ 1,437,500 $ 359,375 $ 28.75 $ 359,375 $ 359,375 $ 359,375 $ 359,375 $ 1,437,500
Supplies $ 1,876,000 $ 234,500 $ 37.52 $ 938,000 $ 938,000 $ 1,876,000
Contingency $ 146,115 $ 36,529 3.0% $ 18,264 $ 18,264 $ 18,264 $ 18,264 $ 18,264 $ 18,264 $ 18,264 $ 18,264 $ 146,115
Developer Fee $ 97,410 $ 24,353 2.0% $ 12,176 $ 12,176 $ 12,176 $ 12,176 $ 12,176 $ 12,176 $ 12,176 $ 12,176 $ 97,410
$ -
TOTAL ORGANIC FARMING COSTS $ 6,990,025 $ 1,505,881 $ 140 $ 532,691 $ 466,691 $ 436,691 $ 436,691 $ 796,066 $ 1,734,066 $ 1,762,566 $ 824,566 $ 6,990,025
107,456 sf $ -

GRAND TOTALS
$ 15,111,933 $ 368,584 $ 141 $ 1,724,472 $ 1,251,371 $ 1,129,046 $ 1,129,046 $ 1,932,776 $ 2,870,776 $ 2,984,834 $ 2,089,613 $ 15,111,933
COMMERCIAL DEVELOPMENT

2017 2018 2019 2020 2021 2022


Office Space SF / # Units 33,456 16 16.4 16.4 16.4 16.4 16.4 16.4
Retail Space / Units 25 15 15 22 22 22 22
Research Space - SqFt 24,000
Organic Space - Sqf 50,000

Annual Sq.Ft. Office Space Available 40% 13,382 13,382 13,382 13,382 13,382 13,382
Annual Sq.Ft. Retail Space Available 60% 20,074 20,074 20,074 20,074 20,074 20,074
Annual Sq.Ft. Research Space Available 100% 24,000 24,000 24,000 24,000 24,000 24,000
Annual Sq.Ft. Organic Farming Space Available 100% 50,000 50,000 50,000 50,000 50,000 50,000

Paid Occupied Office - 4,951 5,942 6,536 7,190 7,909


Paid Occupied Retail - 7,427 8,913 9,804 10,784 11,863
Paid Occupied Research - 8,880 10,656 11,722 12,894 14,183
Paid Occupied Farming - Organic - 18,500 22,200 24,420 26,862 29,548

Paid Occupancy - Office / Retail 0% 37% 44% 49% 54% 59%


Average Rate 2.0% $15.00 $15.30 $15.61 $15.92 $16.24 $16.56
RevPAR 0 $5.66 $6.93 $7.77 $8.72 $9.79

Paid Occupancy - Research / Farming 0% 30% 39% 51% 66% 86%


Average Rate 2.0% $10.00 $10.80 $11.66 $11.90 $12.14 $12.38
RevPAR $0.00 4.00 5.18 5.81 6.52 7.31

REVENUE

Offices $0 $75,758 $92,728 $104,040 $116,733 $130,975


Retail $0 $113,637 $139,091 $156,060 $175,100 $196,462
Research $0 $95,904 $124,292 $139,455 $156,469 $175,558
Organic $0 $199,800 $258,941 $290,532 $325,976 $365,746

Telecommunications 4% $0 $7,576 $9,273 $10,404 $11,673 $13,097

TOTAL REVENUE $0 $492,674 $624,324 $700,491 $785,951 $881,837

DEPARTMENTAL EXPENSES
Rooms - (12% of Revenue) 6% $0 $29,106 $36,903 $41,405 $46,457 $52,124

Telecommunications - (60% of Tele Revenues) 60% $0 $4,545 $5,564 $6,242 $7,004 $7,858

TOTAL DEPARTMENTAL EXPENSES $0 $33,651 $42,467 $47,648 $53,461 $59,983

DEPARTMENTAL INCOME $0 $459,023 $581,857 $652,844 $732,491 $821,855

UNDISTRIBUTED OPERATING EXPENSES


Administrative & General - (6.5% of Revenues) 6.5% $0 $32,024 $40,581 $45,532 $51,087 $57,319
Management Fee - (% of Revenues) 3.0% $0 $14,780 $18,730 $21,015 $23,579 $26,455

Marketing - (% of Revenues) 2.0% $0 $9,853 $12,486 $14,010 $15,719 $17,637


Franchise Fees $0 $0 $0 $0 $0 $0
Property Oper & Maint - (4.5% of Rev.) 4.5% $0 $22,170 $28,095 $31,522 $35,368 $39,683
Utility Costs - (2.8% of Revenues) 2.8% $0 $13,795 $16,885 $18,945 $21,256 $23,849

TOTAL UNDISTRIBUTED OPERATING EXPENSES $0 $92,623 $116,777 $131,024 $147,008 $164,943

INCOME AFTER UOE $0 $366,400 $465,080 $521,820 $585,482 $656,911

FIXED CHARGES
Property Taxes 1% $0 $4,927 $6,243 $7,005 $7,860 $8,818
Insurance - (% of Revenues) 1.2% $0 $5,912 $6,030 $6,151 $6,274 $6,399

Reserves for Replacement - (1% - 3% of Rev.) $0 $9,853 $12,486 $14,010 $15,719 $17,637
0% 2% 2% 2% 2% 2%
TOTAL FIXED CHARGES $0 $20,692 $24,760 $27,166 $29,852 $32,855

EBITDA $0 $345,708 $440,320 $494,655 $555,630 $624,057

BELOW NOI ANALYSIS

Incentive Management Fee 0.0% $0 $0 $0 $0 $0 $0

CASH FLOW AFTER OTHER ITEMS $0 $345,708 $440,320 $494,655 $555,630 $624,057

2018 2019 2020 2021


EBITDA $345,708 $440,320 $494,655 $555,630
2023 2024 2025 2026 2027 2028 2029
16.4 16.4 16.4 16.4 16.4 16.4 16.4
24 24 25 25 25 27 27

13,382 13,382 13,382 13,382 13,382 13,382 13,382


20,074 20,074 20,074 20,074 20,074 20,074 20,074
24,000 24,000 24,000 24,000 24,000 24,000 24,000
50,000 50,000 50,000 50,000 50,000 50,000 50,000

8,699 9,569 10,526 11,579 11,579 11,579 11,579


13,049 14,354 15,789 17,368 17,368 17,368 17,368
15,601 17,162 18,878 20,766 20,766 20,766 20,766
32,503 35,753 39,329 43,262 43,262 43,262 43,262

65% 72% 79% 87% 87% 87% 87%


$16.89 $17.23 $17.57 $17.93 $18.28 $18.65 $19.02
$10.98 $12.32 $13.82 $15.51 $15.82 $16.14 $16.46

99% 99% 99% 99% 99% 99% 99%


$12.63 $12.88 $13.14 $13.40 $13.67 $13.94 $14.22
8.21 9.21 10.33 11.59 11.82 12.06 12.30

$146,954 $164,882 $184,997 $207,567 $211,718 $215,953 $220,272


$220,430 $247,323 $277,496 $311,351 $317,578 $323,929 $330,408
$196,976 $221,007 $247,970 $278,222 $283,787 $289,462 $295,252
$410,367 $460,431 $516,604 $579,630 $591,222 $603,047 $615,107

$14,695 $16,488 $18,500 $20,757 $21,172 $21,595 $22,027

$989,422 $1,110,131 $1,245,567 $1,397,526 $1,425,477 $1,453,986 $1,483,066

$58,484 $65,619 $73,624 $82,606 $84,258 $85,943 $87,662

$8,817 $9,893 $11,100 $12,454 $12,703 $12,957 $13,216

$67,301 $75,511 $84,724 $95,060 $96,961 $98,901 $100,879

$922,121 $1,034,620 $1,160,843 $1,302,466 $1,328,515 $1,355,086 $1,382,187

$64,312 $72,159 $80,962 $90,839 $92,656 $94,509 $96,399


$29,683 $33,304 $37,367 $41,926 $42,764 $43,620 $44,492

$19,788 $22,203 $24,911 $27,951 $28,510 $29,080 $29,661


$0 $0 $0 $0 $0 $0 $0
$44,524 $49,956 $56,051 $62,889 $64,146 $65,429 $66,738
$26,759 $30,024 $33,687 $37,796 $38,552 $39,323 $40,110

$185,067 $207,645 $232,977 $261,400 $266,628 $271,961 $277,400

$737,054 $826,975 $927,866 $1,041,066 $1,061,887 $1,083,125 $1,104,787

$9,894 $11,101 $12,456 $13,975 $14,255 $14,540 $14,831


$6,527 $6,658 $6,791 $6,927 $7,065 $7,207 $7,351

$19,788 $22,203 $37,367 $41,926 $42,764 $43,620 $44,492


2% 2% 3% 3% 3% 3% 3%
$36,210 $39,962 $56,614 $62,828 $64,085 $65,366 $66,674

$700,844 $787,013 $871,252 $978,238 $997,802 $1,017,758 $1,038,113

$0 $0 $0 $0 $0 $0 $0

$700,844 $787,013 $871,252 $978,238 $997,802 $1,017,758 $1,038,113 $8,851,390


DESALINATION PLANT

Plant capacity, lps 40 60 160


Plant capacity, MGD 0.91 1.37 3.65
No. of SWRO Trains 4 6 16

Capital Cost Estimate Amount % of Total Amount % of Total Amount % of Total

Seawater Supply 1 $ 506,000 10.3% $ 643,700 10.4% $ 1,369,900 10.9%


SWRO Pretreament 2 $ 481,200 9.8% $ 638,000 10.3% $ 1,484,500 11.9%
SWRO Process & Electrical 3 $ 2,119,000 42.9% $ 3,022,200 48.7% $ 5,962,900 47.6%
Post Treatment 4 $ 105,800 2.1% $ 136,100 2.2% $ 415,500 3.3%
Pipelines 5 $ 681,800 13.8% $ 681,800 11.0% $ 1,381,800 11.0%
Building 6 $ 772,400 15.7% $ 772,400 12.4% $ 1,172,400 9.4%
Project Management 7 $ 268,400 5.4% $ 317,400 5.1% $ 737,700 5.9%
Total Estimated Cost 8 $ 4,934,600 100% $ 6,211,600 100% $ 12,524,700 100%

Cost of Water DBO 9 DBO DBO

Debt Service, $/month $ - $ - $ -


Fixed Cost, $/month 10 $ 28,553 $ 38,664 $ 89,219
Total Monthly Fixed Charge, $ $ 28,553 $ 38,664 $ 89,219
Variable, $/m3 11 $ 0.53 $ 0.53 $ 0.53
Cost US$/m3 at 90% OLF $ 0.81 $ 0.80 $ 0.80
Cost Monthly US$ at 90% OLF $ 78,008 $ 112,847 $ 287,042

1 Seawater supply costing includes one weel for each two RO trains plus a spare, one concentrate disposal well and typical permitting fees
2 Pretreatment costing includes bag filtration, cartridge filtration, scale control and plant interconnecting piping
3 SWRO Process and Electrical includes controls and electrical switchgear for entire plant
4 Post treatment includes chemical feed system for pH adjustment, corrosion inhibitor addition, disinfection and alkalinity/hardness adjustment.
5 Pipeline costing assumes 2,100 feet of 18-inch diameter for feedwater and 2,100 feet of 12-inch HDPE for concentrate disposal.
6 Building budget assumes entire building is constructed at a unit cost of $ 115 per f2.
7 Project management includes equipment installation and commissioning.
8 Cost does not include IVA.
9 DBO is design, build and operate. Under this arrangement, plant and equipment would be purchase outright by Las Palmas and TSG/EWU would
operate for 10 years. Under TSG/EWU's operation and maintenance contract, TSG/EWU assumes 100% of the risk of operation, maintenance, repair and
replacement of the plant and in effect provides a full 10 year warranty on the plant. Under this arrangement, the owner insures the plant and pays the power
cost directly, and TSG/EWU's fees are adjusted annually for inflation but are otherwise fixed for the term of the arrangement.
10 Fixed cost includes labor, cartridge filter and SWRO membrane repalcement, G&A.
11 Variable fee includes chemicals, energy at annual average cost of $0.104 per KWH, lubricants, and part replacement.

Desalination Revenue Projections

Construction Units Monthly Annual Annual


Year Deliveries Online Charges Revenue Costs
2015 0 0 $0.00 $0.00 $ 1,354,164
2016 0 0 $0.00 $0.00 $ 1,354,164
2017 0 0 $0.00 $0.00 $ 1,354,164
2018 0 0 $0.00 $0.00 $ 1,354,164
2019 0 0 $0.00 $0.00 $ 1,354,164
2020 0 0 $115.00 $0.00 $ 1,354,164
2021 57 57 $120.75 $41,383.44 $ 1,354,164
2022 71 129 $125.58 $96,837.25 $ 1,354,164
2023 100 228 $130.60 $214,849.58 $ 1,354,164
2024 129 357 $134.52 $345,773.54 $ 1,354,164
2025 114 471 $137.21 $465,549.49 $ 1,354,164
2026 100 571 $138.58 $664,936.35 $ 1,354,164
2027 86 657 $139.83 $771,558.89 $ 1,354,164
2028 57 714 $140.95 $845,360.18 $ 1,354,164
2029 0 714 $141.94 $972,888.80 $ 1,354,164
2030 0 714 $142.79 $978,726.13 $ 1,354,164
WASTE TREATMENT PLANT

Construction Costs

1 lps = 22,824.47 GPD Total Cost for


Phase 1 Phase 2 Phase 3 Phase 4
1.3 lps 2.6 lps 3.9 lps 5.2 lps Single Phase
5.2 lps
Gal per day 29,672 59,344 89,015 118,687

Membranes $ 60,000 $ 60,000 $ 60,000 $ 60,000 $ 240,000


Process Mechanical $ 101,800 $ 16,900 $ 45,300 $ 21,400 $ 150,300
Electrical & Controls $ 128,500 $ 13,500 $ 37,400 $ 37,400 $ 216,800
Piping $ 59,500 $ 27,400 $ 27,400 $ 27,400 $ 141,700
Engineering $ 34,000 $ 13,000 $ 13,000 $ 13,000 $ 42,500
Installation & Commissioning $ 76,200 $ 57,500 $ 57,500 $ 57,500 $ 174,100

Total $ 460,000 $ 188,300 $ 240,600 $ 216,700 $ 965,400


Cumulative Cost $ 648,300 $ 888,900 $ 1,105,600

1. Pricing includes design, equipment supply & installation


2. Plant pricing includes interconnecting piping, electrical and controls, and effluent pumping.
3. Civil work associated with the plant tankage is not include. Once a configuration is selected and site soil borings provided,
TSG will provide construction drawings for the tanks with complete details for reinforcing, footer design, etc.

Waste Treatment Plant Revenue Analysis

Base Rate $ 42.00


Construction Units Monthly Annual
Year Deliveries Online Charges Revenue
2015 0 0 0 0
2016 0 0 0 0
2017 0 0 0 0
2018 0 0 0 0
2019 0 0 0 0
2020 57 57 $65 $22,277
2021 71 129 $68 $52,629
2022 100 228 $72 $117,889
2023 129 357 $75 $193,411
2024 114 471 $79 $268,068
2025 100 571 $83 $398,041
2026 86 657 $87 $480,634
2027 57 714 $91 $548,550
2028 0 0 $0 $0
2029 0 0 $0 $0
2026 0 0 $0 $0
SOLAR FACILITY

Project Cost ('000 USD) Project Information

Project Cost 54,616 Commercial Operations Date Jan-20


COD (year) 2020
Cost / MW 3,345 COD (month) 1
Technology Concentrated PV Solar
State / Country Sonora, MEXICO

Capacity (MW) 16.3 System Detail

Tracking Multi Axes


Est. Capacity Factor
9% Panels Solar Concentrator
Range 30*

Revenue Price escalator


1
Per/Watt 0.35 USA Consumer Index 2.5%

Maintenance Cost (USD) SOLAR POWER COSTS

Year Variable O&M per mw (DC) Solar Production 18


Year 1 $10,000 Solar Panels (210w) $ 84,571
Year 2 $10,250
Year 3 $10,506 Project Costs
Year 4 $10,769 Panel Costs $ 22,284,571
Year 5 $11,038 Cost for inverters and rails $ 9,768,000
Year 6 $11,314 Cost for install $ 7,865,143
Year 7 $11,597 Land Cost $ 500,000
Year 8 $11,887 Supplemental Costs $ 850,000
Year 9 $12,184 Cost of tie in and lines $ 1,150,000
Year 10 $12,489 Total Project Costs $ 42,417,714
Year 11 $12,801
Year 12 $13,121 Price per Watt $ 2
Year 13 $13,449 Price per kWh $ 0.15
Year 14 $13,785
Year 15 $14,130
Year 16 $14,483
Year 17 $14,845
Year 18 $15,216
Year 19 $15,597
Year 20 $15,987
Year 21 $16,386
Year 22 $16,796
Year 23 $17,216
Year 24 $17,646
Year 25 $18,087

MWh Production

Year JAN FEB MAR APR MAY JUN JUL AUG


2020 859.50 866.93 1106.24 1243.94 1293.32 1240.49 1190.21 1191.55
2021 856.49 863.90 1102.37 1239.58 1288.79 1236.14 1186.05 1187.38
2022 853.49 860.87 1098.51 1235.24 1284.28 1231.82 1181.90 1183.22
2023 850.51 857.86 1094.67 1230.92 1279.79 1227.51 1177.76 1179.08
2024 847.53 854.86 1090.83 1226.61 1275.31 1223.21 1173.64 1174.95
2025 844.56 851.86 1087.02 1222.32 1270.84 1218.93 1169.53 1170.84
2026 841.61 848.88 1083.21 1218.04 1266.40 1214.66 1165.44 1166.74
2027 838.66 845.91 1079.42 1213.78 1261.96 1210.41 1161.36 1162.66
2028 835.73 842.95 1075.64 1209.53 1257.55 1206.17 1157.29 1158.59
2029 832.80 840.00 1071.88 1205.30 1253.15 1201.95 1153.24 1154.53
2030 829.89 837.06 1068.13 1201.08 1248.76 1197.75 1149.21 1150.49
2031 826.98 834.13 1064.39 1196.87 1244.39 1193.55 1145.18 1146.47
2032 824.09 831.21 1060.66 1192.69 1240.03 1189.38 1141.18 1142.45
2033 821.20 828.30 1056.95 1188.51 1235.69 1185.21 1137.18 1138.46
2034 818.33 825.40 1053.25 1184.35 1231.37 1181.06 1133.20 1134.47
2035 815.47 822.51 1049.56 1180.21 1227.06 1176.93 1129.23 1130.50
2036 812.61 819.64 1045.89 1176.08 1222.76 1172.81 1125.28 1126.54
2037 809.77 816.77 1042.23 1171.96 1218.48 1168.71 1121.34 1122.60
2038 806.93 813.91 1038.58 1167.86 1214.22 1164.62 1117.42 1118.67
2039 804.11 811.06 1034.95 1163.77 1209.97 1160.54 1113.51 1114.76
2040 801.29 808.22 1031.32 1159.70 1205.74 1156.48 1109.61 1110.85
2041 798.49 805.39 1027.72 1155.64 1201.52 1152.43 1105.73 1106.97
2042 795.69 802.57 1024.12 1151.59 1197.31 1148.40 1101.86 1103.09
2043 792.91 799.76 1020.53 1147.56 1193.12 1144.38 1098.00 1099.23
2044 790.13 796.97 1016.96 1143.55 1188.94 1140.37 1094.16 1095.38
2045 786.97 794.18 1013.40 1139.54 1184.78 1136.38 1090.33 1091.55

Revenue

JAN FEB MAR APR MAY JUN JUL AUG


2020 $ 19,080.90 $ 19,245.85 $ 24,558.53 $ 27,615.40 $ 28,711.70 $ 34,113.34 $ 39,277.03 $ 39,321.05
2021 $ 24,290.11 $ 24,500.08 $ 31,263.16 $ 35,154.58 $ 36,550.18 $ 38,562.73 $ 43,727.19 $ 43,776.20
2022 $ 29,686.23 $ 29,942.85 $ 38,208.37 $ 42,964.28 $ 44,669.92 $ 46,415.47 $ 47,960.16 $ 48,013.92
2023 $ 35,271.79 $ 35,576.70 $ 45,397.40 $ 51,048.15 $ 53,074.71 $ 58,178.85 $ 55,821.09 $ 55,883.65
2024 $ 41,054.35 $ 41,409.25 $ 52,839.99 $ 59,417.14 $ 61,775.94 $ 66,658.78 $ 71,063.74 $ 71,143.39
2025 $ 47,035.44 $ 47,442.04 $ 60,538.09 $ 68,073.44 $ 70,775.89 $ 75,427.26 $ 79,607.54 $ 79,696.76
2026 $ 53,223.27 $ 53,683.36 $ 68,502.28 $ 77,028.97 $ 80,086.93 $ 84,496.73 $ 88,442.62 $ 88,541.75
2027 $ 59,623.00 $ 60,138.42 $ 76,739.21 $ 86,291.17 $ 89,716.84 $ 93,874.59 $ 97,576.07 $ 97,685.43
2028 $ 66,244.72 $ 66,817.37 $ 85,261.84 $ 95,874.64 $ 99,680.76 $ 103,575.97 $ 107,022.93 $ 107,142.88
2029 $ 67,461.94 $ 68,045.11 $ 86,828.49 $ 97,636.30 $ 101,512.36 $ 105,479.13 $ 108,989.43 $ 109,111.59
2030 $ 68,709.66 $ 69,303.62 $ 88,434.40 $ 99,442.10 $ 103,389.85 $ 107,429.99 $ 111,005.21 $ 111,129.63
2031 $ 69,972.63 $ 70,577.51 $ 90,059.94 $ 101,269.97 $ 105,290.28 $ 109,404.68 $ 113,045.63 $ 113,172.33
2032 $ 118,767.54 $ 119,794.24 $ 152,862.60 $ 171,889.87 $ 178,713.72 $ 171,412.86 $ 164,466.17 $ 164,650.51
2033 $ 120,955.07 $ 122,000.68 $ 155,678.11 $ 175,055.83 $ 182,005.37 $ 174,570.04 $ 167,495.40 $ 167,683.13
2034 $ 123,183.12 $ 124,247.98 $ 158,545.77 $ 178,280.44 $ 185,357.98 $ 177,785.70 $ 170,580.74 $ 170,771.93
2035 $ 125,459.32 $ 126,543.86 $ 161,475.41 $ 181,574.74 $ 188,783.07 $ 181,070.86 $ 173,732.77 $ 173,927.49
2036 $ 127,766.84 $ 128,871.33 $ 164,445.36 $ 184,914.36 $ 192,255.27 $ 184,401.22 $ 176,928.16 $ 177,126.46
2037 $ 130,121.45 $ 131,246.29 $ 167,475.92 $ 188,322.14 $ 195,798.34 $ 187,799.54 $ 180,188.76 $ 180,390.71
2038 $ 132,514.49 $ 133,660.02 $ 170,555.94 $ 191,785.55 $ 199,399.24 $ 191,253.34 $ 183,502.59 $ 183,708.26
2039 $ 134,961.57 $ 136,128.25 $ 173,705.51 $ 195,327.15 $ 203,081.43 $ 194,785.11 $ 186,891.23 $ 187,100.70
2040 $ 137,445.98 $ 138,634.14 $ 176,903.13 $ 198,922.79 $ 206,819.81 $ 198,370.76 $ 190,331.57 $ 190,544.90
2041 $ 139,975.22 $ 141,185.24 $ 180,158.45 $ 202,583.31 $ 210,625.66 $ 202,021.13 $ 193,834.01 $ 194,051.26
2042 $ 142,556.69 $ 143,789.03 $ 183,480.99 $ 206,319.42 $ 214,510.08 $ 205,746.87 $ 197,408.76 $ 197,630.01
2043 $ 145,181.81 $ 146,436.84 $ 186,859.71 $ 210,118.70 $ 218,460.19 $ 209,535.61 $ 201,043.95 $ 201,269.28
2044 $ 147,857.91 $ 149,136.08 $ 190,304.06 $ 213,991.77 $ 222,487.02 $ 213,397.93 $ 204,749.75 $ 204,979.24
2045 $ 147,266.48 $ 148,614.10 $ 189,637.99 $ 213,242.80 $ 221,708.32 $ 212,651.04 $ 204,033.13 $ 204,261.81
Other Operating Costs (000 USD)

Insurance Rate Values Premium


Property Damage 0.22% 54,616 120
Business Interruption (18 months) 0.34%
Contingent Business Interruption (12 months) 0.18%

11,000 Kwh used annually per household AZ


6,300 Kwh used per household this project (Time/Occupancy Load variable)

917 Kwh per/Month - AZ


525 Kwh per/Month - This Project

1,000,000 Kwh per/MW


18.0 MW this project
18,000,000 Kwh
2857
2888 Homes/Units
18,194,400

SEP OCT NOV DEC Total MWh OFF peak ON peak


1144.35 1033.54 919.93 848.22 12,938.20 1.1100 0.11000
1140.34 1029.92 916.71 845.25 12,892.92 1.1344 0.11344
1136.35 1026.31 913.50 842.29 12,847.80 1.1594 0.11594
1132.38 1022.72 910.30 839.34 12,802.83 1.1849 0.11849
1128.41 1019.14 907.12 836.41 12,758.02 1.2110 0.12110
1124.46 1015.58 903.94 833.48 12,713.37 1.2376 0.12376
1120.53 1012.02 900.78 830.56 12,668.87 1.2648 0.12648
1116.61 1008.48 897.62 827.65 12,624.53 1.2926 0.12926
1112.70 1004.95 894.48 824.76 12,580.34 1.3211 0.13211
1108.80 1001.43 891.35 821.87 12,536.31 1.3501 0.13501
1104.92 997.93 888.23 818.99 12,492.43 1.3799 0.13799
1101.06 994.43 885.12 816.13 12,448.71 1.4102 0.14102
1097.20 990.95 882.03 813.27 12,405.14 1.4412 0.14412
1093.36 987.49 878.94 810.42 12,361.72 1.4729 0.14729
1089.53 984.03 875.86 807.59 12,318.46 1.5053 0.15053
1085.72 980.59 872.80 804.76 12,275.34 1.5385 0.15385
1081.92 977.15 869.74 801.94 12,232.38 1.5723 0.15723
1078.13 973.73 866.70 799.14 12,189.56 1.6069 0.16069
1074.36 970.33 863.66 796.34 12,146.90 1.6422 0.16422
1070.60 966.93 860.64 793.55 12,104.39 1.6784 0.16784
1066.85 963.55 857.63 790.78 12,062.02 1.7153 0.17153
1063.12 960.17 854.63 788.01 12,019.80 1.7530 0.1753
1059.40 956.81 851.64 785.25 11,977.73 1.7916 0.17916
1055.69 953.46 848.66 782.50 11,935.81 1.8310 0.18310
1052.00 950.13 845.69 779.76 11,894.04 1.8713 0.18713
1048.31 946.80 842.73 777.03 11,852.01 1.8713 0.18713

SEP OCT NOV DEC TOTALS


$ 37,763.55 $ 28,680.65 $ 20,422.39 $ 23,538.05 $ 239,629.91
$ 42,042.23 $ 40,891.93 $ 31,197.40 $ 33,559.78 $ 297,860.90
$ 46,112.09 $ 41,646.83 $ 37,068.89 $ 34,179.32 $ 340,807.84
$ 53,670.11 $ 48,472.97 $ 43,144.68 $ 39,781.49 $ 460,257.28
$ 68,325.41 $ 55,538.21 $ 49,433.29 $ 45,579.90 $ 547,391.51
$ 76,539.99 $ 62,843.86 $ 55,935.88 $ 51,575.60 $ 620,393.43
$ 85,034.62 $ 64,000.26 $ 56,965.16 $ 52,524.65 $ 682,024.48
$ 93,816.13 $ 71,695.85 $ 63,814.83 $ 58,840.38 $ 759,849.52
$ 102,898.97 $ 79,658.37 $ 70,902.09 $ 65,375.17 $ 840,364.58
$ 104,789.70 $ 81,122.05 $ 72,204.88 $ 66,576.41 $ 855,805.92
$ 106,727.80 $ 82,622.42 $ 73,540.32 $ 67,807.76 $ 871,634.21
$ 108,689.59 $ 84,141.13 $ 74,892.09 $ 69,054.15 $ 887,655.94
$ 158,128.72 $ 142,816.35 $ 127,117.56 $ 117,208.57 $ 1,787,828.70
$ 161,041.23 $ 145,446.82 $ 129,458.88 $ 119,367.39 $ 1,820,757.96
$ 164,007.68 $ 148,126.01 $ 131,843.57 $ 121,566.19 $ 1,854,297.10
$ 167,038.25 $ 150,863.12 $ 134,279.80 $ 123,812.51 $ 1,888,561.19
$ 170,110.51 $ 153,637.88 $ 136,749.55 $ 126,089.74 $ 1,923,296.66
$ 173,245.47 $ 156,469.26 $ 139,269.70 $ 128,413.44 $ 1,958,741.01
$ 176,431.60 $ 159,346.87 $ 141,831.00 $ 130,775.08 $ 1,994,763.98
$ 179,689.67 $ 162,289.44 $ 144,450.11 $ 133,190.03 $ 2,031,600.18
$ 182,997.44 $ 165,276.91 $ 147,109.19 $ 135,641.83 $ 2,068,998.44
$ 186,364.91 $ 168,318.29 $ 149,816.25 $ 138,137.87 $ 2,107,071.60
$ 189,801.92 $ 171,422.47 $ 152,579.21 $ 140,685.46 $ 2,145,930.91
$ 193,297.03 $ 174,579.14 $ 155,388.89 $ 143,276.12 $ 2,185,447.25
$ 196,860.04 $ 177,797.12 $ 158,253.14 $ 145,917.09 $ 2,225,731.16
$ 196,171.03 $ 177,174.83 $ 157,699.26 $ 145,406.39 $ 2,217,867.17
$ 35,614,568.82
GOLF COURSE

GOLF COURSE CONSTRUCTION COSTS GOLF COURSE REVENUE

ITEM/DESCRIPTION SUB-TOTALS Construction Units Membership Membership Sale


Year Deliveries Online Sales Revenue
A Mobilization $ 25,000
B Surveying and Staking $ 70,000 2015 0
C Clearing and Grubbing $ 373,000 2016 0
D Erosion/Dust Control $ 142,500 2017 0
E Earthmoving $ 719,250 2018 0
F Topsoil / Sand $ 273,000 2019 0
2020 0 0 0 $ -
2021 0 0 0 $ -
G Lake Construction $ 271,932 2022 57 57 9 $ 128,520
H Major Drainage - On/Off Site $ 174,500 2023 71 129 11 $ 160,650
I Rough Grading $ 509,652 2024 100 228 15 $ 299,880
J Golf Course Drainage $ 184,575 2025 129 357 19 $ 385,560
K Bridges $ 110,400 2026 114 471 17 $ 514,080
L Greens and Tees Construction $ 718,350 2027 100 571 15 $ 449,820
M Bunker Construction $ 221,550 2028 86 657 13 $ 514,080
N Irrigation (Trenching & Pipe) $ 318,750 2029 57 714 9 $ 385,560
2026 0 714 0 $ -
Total $ 4,112,458.51

1 Valves / Field Control / Controllers $ 84,436.00


2 Irrigation Hardware / Electrical $ 252,486.50

Total $ 336,922.50
O Cart Paths $ 264,530.00
P Landscaping $ 272,500.00
Q Finish Grade $ 157,000.00
R Seedbed Preparation $ 780,185.00

Total $ 1,474,215.00

S Grassing $ 3,047,945.00
T Specialty Construction $ 315,000.00
U Clubhouse $ 2,000,000.00
V Workshop / Storage Facilities $ 750,000.00
X Gof Carts $ 500,000.00
Y Design / Architect

Total $ 6,612,945.00

TOTAL $ 12,536,541.01

$ 12,536,541.01
Total Total
Membership Annual Paid Revenue Total
Fees/Dues Rounds Round Revenue

$ - 0 $ - $ -
$ - 730 $ 32,850 $ 32,850
$ 2,999 1095 $ 54,750 $ 186,269
$ 7,711 1314 $ 72,270 $ 240,631
$ 15,422 1460 $ 80,300 $ 395,602
$ 26,775 1606 $ 88,330 $ 500,665
$ 35,343 1752 $ 96,360 $ 645,783
$ 42,840 1898 $ 123,370 $ 616,030
$ 49,266 2044 $ 132,860 $ 696,206
$ 53,550 2190 $ 142,350 $ 581,460
$ 53,550 2336 $ 151,840 $ 205,390
MARINA

MARINA DEVELOPMENT COSTS (Inland) MARINA REVENUE

Wave Attenuator $ 1,275,000


Main Piers & Walkways $ 2,450,000 $1.05 initial base rate
Finger Piers $ 1,250,000
Gangways $ 560,000 15% $0.16
Utilities $ 170,000 3.0% $0.03
26% $0.27
Marina Promenade $ 1,150,000
Security Fencing $ 77,000
Site Clearing & Grading $ 115,000
Site Dock Utilities & Fuel Tanks $ 1,053,303
Parking $ 356,000

Berth
Marina Services Building $ 750,000 Dock Length
Landscaping & Irrigation $ 56,500 A 40
Signage $ 30,000 B 40
Site Surveying & Engineering $ 122,000 C 50
Architectural & Engineering Fees $ 367,000 D 50
Project Management Fees $ 554,322 E 50
F 60
Entrance Channel $ 955,000 G 60
Turning Basin $ 2,250,000 H 70
Main Access Channel $ 1,256,000 I 70
North Breakwater $ 850,000 J 80
South Breakwater $ 745,000 K 80
Wave Absorber $ 475,000 L 90
Circulation Channels $ 458,000 M 90
Navigation Aids $ 248,000 N 100
Rock Work $ 652,000 O 100
Island Work $ 1,654,000 P 110
Q 110
Total Costs $ 19,879,125 R 130
S 150
T 150
U 170
V 170
W 190
X 210
Y 230
Z 250
ENUE

al base rate

adjustment for extra-wide


progressive rate increment for berthing
progressive rate increment for unmetered power

Rate adjst Rate Adj Total Lgth of


Base Tot. Slips of Unmetered Extra for for Monthly Rev. berths of
Rate for this Lgth on power? wide? Unmetere Extra @ 100% this size on
this Lgth this dock (1=yes) (1=yes) d power Wide occupancy this dock
$1.05 8 4 2 $0.27 $0.16 $1,569.12 320 $196.14
$1.05 10 5 4 $0.27 $0.16 $1,999.20 400 $199.92
$1.07 10 5 4 $0.27 $0.16 $2,531.82 500 $253.18
$1.09 10 5 4 $0.27 $0.16 $2,576.70 500 $257.67
$1.09 10 5 4 $0.27 $0.16 $2,576.70 500 $257.67
$1.13 8 4 2 $0.27 $0.16 $2,514.96 480 $314.37
$1.13 10 5 4 $0.27 $0.16 $3,200.40 600 $320.04
$1.20 8 4 4 $0.27 $0.16 $3,163.44 560 $395.43
$1.20 8 4 4 $0.27 $0.16 $3,163.44 560 $395.43
$1.26 6 3 3 $0.27 $0.16 $2,832.48 480 $472.08
$1.26 8 4 4 $0.27 $0.16 $3,776.64 640 $472.08
$1.31 6 3 3 $0.27 $0.16 $3,299.94 540 $549.99
$1.31 8 4 4 $0.27 $0.16 $4,399.92 720 $549.99
$1.34 6 3 3 $0.27 $0.16 $3,742.20 600 $623.70
$1.34 6 3 3 $0.27 $0.16 $3,742.20 600 $623.70
$1.37 4 2 2 $0.27 $0.16 $2,781.24 440 $695.31
$1.37 4 2 2 $0.27 $0.16 $2,781.24 440 $695.31
$1.42 6 3 3 $0.27 $0.16 $5,094.18 780 $849.03
$1.47 2 1 2 $0.27 $0.16 $2,116.80 300 $1,058.40
$1.47 4 2 2 $0.27 $0.16 $4,044.60 600 $1,011.15
$1.58 2 1 2 $0.27 $0.16 $2,541.84 340 $1,270.92
$1.58 4 2 3 $0.27 $0.16 $4,976.58 680 $1,244.15
$1.68 4 2 3 $0.27 $0.16 $5,881.26 760 $1,470.32
$1.79 2 1 2 $0.27 $0.16 $3,492.72 420 $1,746.36
$1.89 2 1 2 $0.27 $0.16 $4,018.56 460 $2,126.22
$1.94 2 1 2 $0.27 $0.16 $4,473.00 500 $2,236.50

158 total number of berths $87,291 13720

13,720 total feet of berths $1,047,494 total annual


EQUESTRIAN FACILITY

Costs
Improvements & Facilities
Fencing $ 200,000
Facilities / Stables $ 850,000
Water System $ 184,000
Horses (10) $ 50,000
Saddles / Equipment (10) $ 55,000

Equipment
Pick-up Trucks (2) $ 50,000
Horse Trailers (2) $ 17,000
Manure Handling Equipment $ 50,000

Total $ 1,456,000

FEED & BEDDING REQUIREMENTS

LBS per day Total tons


Days on Feed per head Fed $/Ton
Commercial Feed 365 3 0.5 $ 265
Grass Hay 365 17 2.81 $ 165

Total

OPERATING EXPENSES

Costs
Commercial Feed $ 1,451
Grass Hay $ 5,119
Salt & mineral $ 280
Bedding $1.00/stall/day $ 3,650
Hired labor (2) 2,000 hours @ $11.50 $ 46,000
Utilities $ 6,600
Equipment operating costs $ 3,900
Facilities repairs $ 3,450
Insurance $ 5,750
Operator labor (1) 2,000 hours @ $15.00 $ 30,000
Veterinary Care $ 15,000

Total $ 121,200

REVENUE

Full Board ( $100 Monthly Rate) $ 6,000

Private Lesson @ $120 $ 28,800


Group Lessons @ $75 $ 21,600
Basic Lesson @ $60 $ 17,280
Trail Rides @ $85 $ 30,600
Specialty Rides @ $ 175 $ 63,000

Total $ 167,280
Cost per No. of
Head Heads Total Cost
$ 145.09 10 $ 1,450.88
$ 511.91 10 $ 5,119.13

$ 6,570.00