NO RINCIAN KEGIATAN DAN PEKERJAAN RINCIAN PERHITUN

A Pekerjaan Sloof Pabrik 200x400 mm


1. Pekerjaan Beton
No AS Panjang
(m)
As 1- (A-G) 146.7
As 10-(B-C) 13.5
As 10-(D-E) 17.1
AS D-(1-10) 71.55
AS E-(1-10) 71.55
AS G-(1-6) 40.5
Total

2. Tulangan Sloof
D (mm) No AS Panjang
(m)

As 1- (A-G)
T. Utama 6 D16 16 161.04
Sengkang ø 8 8 1.0086
As 10-(B-C)
T. Utama 6 D16 16 14.84
Sengkang ø 8 8 1.0086
As 10-(D-E)
T. Utama 6 D16 16 18.44
Sengkang ø 8 8 1.0086
AS D-(1-10)
T. Utama 6 D16 16 78.21
Sengkang ø 8 8 1.0086
AS E-(1-10)
T. Utama 6 D16 16 78.21
Sengkang ø 8 8 1.0086
AS G-(1-6)
T. Utama 6 D16 16 44.2
Sengkang ø 8 8 1.0086
3. Pekerjaan Bekisting
No AS Panjang
(m)
As 1- (A-G) 146.7
As 10-(B-C) 13.5
As 10-(D-E) 17.1
AS D-(1-10) 71.55
AS E-(1-10) 71.55
AS G-(1-6) 40.5
Total

A Pekerjaan Sloof Kantor 200x300 mm


No AS Panjang
1. Pekerjaan Beton (m)

As a - (I-VI) 27.95
As c - (I-VI) 27.95
As e - (I-VI) 27.95
As f - (I-VI) 27.95
As h - (I-VI) 27.95
As j - (I-VI) 27.95
As 1 - (a-j) 51.402
As 3 - (a-j) 46.345
As 4 - (a-j) 46.345
As 6 - (a-j) 51.402
Volume Total

2. Tulangan Sloof

D (mm) No AS Panjang
(m)

As a - (I-VI)
T. Utama 6 D16 16 29.7
Sengkang ø 8 8 1.0086
As c - (I-VI)
T. Utama 6 D16 16 29.7
Sengkang ø 8 8 1.0086
As e - (I-VI)
T. Utama 6 D16 16 29.7
Sengkang ø 8 8 1.0086
As f - (I-VI)
T. Utama 6 D16 16 29.7
Sengkang ø 8 8 1.0086
As h - (I-VI)
T. Utama 6 D16 16 29.7
Sengkang ø 8 8 1.0086
As j - (I-VI)
T. Utama 6 D16 16 29.7
Sengkang ø 8 8 1.0086
As 1 - (a-j)
T. Utama 6 D16 16 54.51
Sengkang ø 8 8 1.0086
As 3 - (a-j)
T. Utama 6 D16 16 54.51
Sengkang ø 8 8 1.0086
As 4 - (a-j)
T. Utama 6 D16 16 78.21
Sengkang ø 8 8 1.0086
As 6 - (a-j)
T. Utama 6 D16 16 78.21
Sengkang ø 8 8 1.0086
RINCIAN PERHITUNGAN VOLUME VOL. SAT.

B H
Volume Beton
(m) (m)
0.2 0.4 11.736 m3
0.2 0.4 1.08 m3
0.2 0.4 1.368 m3
0.2 0.4 5.724 m3
0.2 0.4 5.724 m3
0.2 0.4 3.24 m3
Total 28.872 m3
28.872 m3

Jmlh berat/m berat total


tulangan kg kg

6 1.578971 1,525.67 kg
798 0.394743 317.71 kg

6 1.578971 140.59 kg
73 0.394743 29.06 kg

6 1.578971 174.70 kg
91 0.394743 36.23 kg

6 1.578971 740.95 kg
380 0.394743 151.29 kg

6 1.578971 740.95 kg
380 0.394743 151.29 kg

6 1.578971 418.74 kg
215 0.394743 85.60 kg

Total D16 3,741.59 kg


ø8 771.19 kg
Total Keseluruhan 4,512.79 kg 4,512.79 kg
B H
Luas
(m) (m)
0.2 0.4 117.36 m2
0.2 0.4 10.8 m2
0.2 0.4 13.68 m2
0.2 0.4 57.24 m2
0.2 0.4 57.24 m2
0.2 0.4 3.24 m2
Total 259.56 m2 259.56 m2

B H
Volume Beton
(m) (m)

0.2 0.3 1.677 m3


0.2 0.3 1.677 m3
0.2 0.3 1.677 m3
0.2 0.3 1.677 m3
0.2 0.3 1.677 m3
0.2 0.3 1.677 m3
0.2 0.3 3.08412 m3
0.2 0.3 2.7807 m3
0.2 0.3 2.7807 m3
0.2 0.3 3.08412 m3
Volume Total 21.79164 m3
21.79164 m3

Jmlh berat/m berat total


tulangan kg kg

6 1.578971 281.37 kg
147.5 0.394743 58.73 kg

6 1.578971 281.37 kg
147.5 0.394743 58.73 kg

6 1.578971 281.37 kg
147.5 0.394743 58.73 kg
6 1.578971 281.37 kg
147.5 0.394743 58.73 kg

6 1.578971 281.37 kg
147.5 0.394743 58.73 kg

6 1.578971 281.37 kg
147.5 0.394743 58.73 kg

6 1.578971 516.42 kg
266 0.394743 106.00 kg

6 1.578971 516.42 kg
91 0.394743 36.23 kg

6 1.578971 740.95 kg
380 0.394743 151.29 kg

6 1.578971 740.95 kg
380 0.394743 151.29 kg