N FABRICATION MATERIALS

PT PMRC PART & DESCRIPTION SIZE QTY


SEE ISO NO. (DN)
NOT FOUND __ ________ __________________ ____ ___
E 5483500
N 5417500
1 PPPABQBEACR1ABY Pipe , ASME B36.10M , BE , ASTM A106-B , 250 100.9 M
EL +132438
Seamless Sour, S-30
2 BE9LABMBEACK1ABY 90 Deg. LR Elbow , ASME B16.9 , BE , ASTM 250 4
1
A234-WPB , Seamless Sour, S-30XS-30
250NPD
S22 PIPE SUPPORTS
SEI-SS42-01-1201
IP-1000-BL03-U-0008 3 SEI-ST60B-01-212 ST60-B 250 1
S21 4 SEI-SS12-01-11536 SS12-B10-3-2 250 1
SEI-SS12-01-11522 5 SEI-ST60B-01-213 ST60-B 250 1
6 SEI-SS12-01-11535 SS12-B10-3-2 250 1
57
50
S20 7 SEI-SS22-01-4003 SS22-B10-3-3 250 1
SEI-SS12-01-11523 8 SEI-ST60B-01-214 ST60-B 250 1
9 SEI-ST60B-01-215 ST60-B 250 1
10 SEI-SS22-01-5071 SS22-B10-3-4 250 1
90
00 11 SEI-SS12-01-11531 SS12-B10-3-5 250 1
S19 12 SEI-ST60B-01-216 ST60-B 250 1
SEI-SS12-01-11524 13 SEI-SS12-01-11530 SS12-B10-230-5 250 1
14 SEI-SS12-01-11529 SS12-B10-215-5 250 1
45 15 SEI-SS12-01-11528 SS12-B10-220-5 250 1
00
16 SEI-SS12-01-24091 SS12-B10-255-5 250 1
S18 2
EL +132339 17 SEI-SS12-01-20951 SS12-B10-3-5 250 1
42 SEI-SS22-01-4002
50 18 SEI-SS22-01-4002 SS22-B10-3-4 250 1
0
SLOPE 1:500 19 SEI-SS12-01-11524 SS12-B10-3-3 250 1
S15
90 SEI-SS12-01-11528 30 20 SEI-SS12-01-11523 SS12-B10-3-2 250 1
00 00
21 SEI-SS12-01-11522 SS12-B10-3-2 250 1
22 SEI-SS42-01-1201 SS42-B10-3-41 250 1
S16 S13 2
SEI-SS12-01-24091 00 EL +132333
SEI-SS12-01-11530 10
90
00
00 1
45 1
1
S17
00
SEI-SS12-01-20951 85
30
00 00
SLOPE 1:500 45
00
85
2
2 S14
EL +132353 00
EL +132319 30 SEI-SS12-01-11529
SLOPE 1:283

S11
1
SEI-SS12-01-11531
S12
S10
SEI-ST60B-01-216
SEI-SS22-01-5071
90
00
S8
S9 SEI-ST60B-01-214
SEI-ST60B-01-215
90
00
S5
S7 SEI-ST60B-01-213
41
SEI-SS22-01-4003 43
6
90
00 S3
SEI-ST60B-01-212
S6
SEI-SS12-01-11535 45
00
25
S4 0N SEE ISO
PD
SEI-SS12-01-11536 NOT FOUND
69 E 5570435
36
N 5417500
EL +132172

LINE NO SIZE LINE SPEC. INSUL/ THK(mm)


3 IFC 2/12/2016 ZHUOMINGHA BAIYAN SERVICE: F CODE: B31.3
2 IFC 30/9/2016 ZHUOMINGHA BAIYAN OPERATING DESIGN Barg 0.20 C 90
3.50 160

1 IFC MANXIA BAIYAN OWNER : PROJECT TITLE:


3/8/2016
PETRONAS RAPID PROJECT, PENGERANG
:
NOTES: 1‐ ALL DIMENSIONS ARE IN MILLIMETERS(mm) UNLESS OTHERWISE SPECIFIED.  0 IFC 23/3/2016 MANXIA BAIYAN (Package 2, CDU,ARDS & HCDU UNITS)
2‐ HPP(high point of paving) ELEVATION = EL 108800.  P&ID REF: IFR 28/1/2016 MANXIA BAIYAN ISOMETRIC LINE NO:
A
250-F-1900-10025-1C119BA-20-N
3‐ ROOT GAPS OF BUTT WELD FITTINGS ARE NOT INCLUDED IN DIMENSIONS.  1900-1029
CONTRACTOR :
REV DESCRIPTION DATE DRAWN CHKD APPD
4‐ ALL INSTRUMENT TAG NUMBERS ARE PRECEDED BY UNIT NUMBER    1900
          UNLESS OTHERWISE NOTED. JOB NO : RAPID DWG NO : 1900PD03-F-1900-10025
STRESS CATEGORY PAINTING SYSTEM: PWHT: RADIOGRAPH: TEST TYPE: H
5‐  
1C119BA-20:PWHT is required for all diameter
TEST PRESSURE: AREA : 1900PD03 UNIT : 1900 SHT. NO. REV. NO.
3 5A(1) Y 10% 29.4 Barg 1 OF 1 3
Extraction Date: 11/16/2017