Download the training files using the button below, if you have not done so already.
Download
Procedure Setup:
1. To avoid naming conflicts, it is recommended you save your work, click File > Close until no models
display, then click File > Manage Session > Erase Not Displayed.
2. Click File > Manage Session > Set Working Directory and navigate to the
PTCU\CreoParametric2\Cabling\Splices_Logical folder and click OK
2. Select Appearances Manager from the Appearance Gallery types drop-down list.
5. Click Override all in the Warning message window, then click Close.
9. In the ribbon, click Modify Harness from the Harness group and click HARNESS_1 > Done
from the menu manager.
http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-... 27-10-2017
Creating Splices with Logical Data Page 2 of 6
Figure 1
11. In the ribbon, click Import from the Logical Data group.
12. Click RS Designer > Whole XML from the menu manager.
14. In the ribbon, click Update from the Logical Data group.
15. In the menu manager, click Select All > Done Sel.
1. Notice that wires have been edited in the cabling assembly. A portion of the red W-1 wire has been
deleted, and a separate location on the white W-2 wire has been created.
Figure 2
http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-... 27-10-2017
Creating Splices with Logical Data Page 3 of 6
5. Zoom in on the splice component in the sub-window and select coordinate system IN_1.
6. Select Splice as the Component Type in the Place Component dialog box.
◾ Select the location point as the Cable Location.
◾ Select row SP-01 as the Reference Designator, if necessary, and click OK.
Figure 3
8. In the Cable Paths Setup dialog box, select the W-2 row.
◾ Click Select Exit Path and select coordinate system OUT.
Figure 4
9. Click Update .
11. From the menu manager, click Select All > Done Sel.
12. In the ribbon, click Route Cables from the Route group.
14. Select the incomplete red W-1 wire in the graphics window.
http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-... 27-10-2017
Creating Splices with Logical Data Page 4 of 6
Figure 5
1. Notice that wires have been edited in the cabling assembly. A portion of the blue W-3 and white
W-4 wires has been deleted.
Figure 6
2. In the ribbon, select the Applications tab and click Cabling from the Engineering group.
◾ Select the main cabling assembly surface and query-select the bottom flat splice surface to
create the Coincident constraint.
http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-... 27-10-2017
Creating Splices with Logical Data Page 5 of 6
Figure 7
7. In the ribbon, click Modify Harness from the Harness group and click HARNESS_1 > Done
from the menu manager.
8. In the ribbon, click Auto Designate from the Logical Data group.
◾ Notice that SP-02 now has a Status of Auto Match.
◾ Click OK.
Figure 8
9. Click Update .
10. In the menu manager, click Select All > Done Sel.
11. In the ribbon, click Route Cables from the Route group.
http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-... 27-10-2017
Creating Splices with Logical Data Page 6 of 6
Figure 9