TAHUN - 2016
BULAN OKTOBER
NO MESIN / PROJECT PIC
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 GEO PROTEC
A> Pemasangan Crane
B> Pembuatan Kereta Eko
C> Pasang Timbangan
STATUS
Inprogres
Inprogres
Done
MONITORING PROJECT ENGINEERING
TAHUN - 2016
BULAN NOVEMBER
NO MESIN / PROJECT PIC
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 GEO PROTEC
A> Pemasangan Crane Eko
B> Pembuatan Kereta Anas
A> Lipatan
Condro
B> Pasang pangkon roll di winder unit
D> Ganti Cylinder hidroulic filter timur Anas
E> Lepas tutup DIE yg bautnya putus Anas
F> Install pipa pendinginan calender Sugiono
G> Install Safety up/down calender Iman
H> Chiller / install Sodik
STATUS
Done
Done
Todo
Done
Done
Done
Done
Done
Done
MONITORING PROJECT ENGINEERING
TAHUN - 2016
BULAN DESEMBER
NO MESIN / PROJECT PIC
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 GEOPROTEC
> Pengecatan Mesin & Panel Mandi
> Trial Chiller Iman
> Ganti Oli Gear Box Main Motor M.Sodik
STATUS
Inprogres
Done
Inprogres