GOVERNMENT OF TAMILNADU
HIGHWAYS DEPARTMENT
SCHEDULE OF RATES
2013-2014
(WITH EFFECT FROM 01-06-2013)PROCEEDINGS OF THE DIRECTOR GENERAL, HIGHWAYS,
CHEPAUK, CHENNAI- 600 005
PRESENT: THIRU.N. PERIYARAM, MLE.
Proceedings No.3812/ Tech cell /2013, Dated : 01.06.201
Sub: Highways Department - Schedule of Rates for the year
2013-14 for adoption in the preparation of estimates with
effect from 01.06.2013 - Approved - Communicated —
Regarding,
Refi 1. Engineer-in-Chief (Buildings), Chief Engineer (Buildings),
Chennai region and Chief Engineer (General) PWD,
Chennai-5, Proc. No. HDO (A)/ 64503/2012-1, Dated:
31.05.2013.
2. Chief Engineer (Highways), Construction & Maintenance,
Chennai-5, Letter No.3775 /Contracts-1/2013,
Dated: 31.05.2013
The committee for Schedule of Rates has approved the Schedule of
Rates for the year 2013-14 as below with effect from 01.06.2013,
Rates for Labous
‘The rates of labour pertaining to Highways Department for the year
2018-14 are increased at the average rate of 24.85% over that for the year
2012-18 schedule of rates approved by Highways Department for the
category of Mazdoor-I, Mazdoor-Il, Head Mazdoor, Bitumen Heat Master
Operator, Bitumen sprayer man, Bitumen raker man and Mini Hot Mix Plant
Operator and rounded off to the nearest one rupee as shown in Annexure-L
Rates for IRC Metals:
‘The rates of IRC metals pertaining to Highways Department for the
year 2013-14 are increased at an average rate of 9.91% over that for the year
2012-13 schedule of rates approved by Highways Department and rounded
off to the nearest one rupee as shown in Annexure-I,Conveyance Charges :
‘The conveyance charges approved by the Public Works Department
are being adopted every year and the same conveyance table approved by the
Public Works Department for 2013-14 will be followed by Highways
Department also.
General Conditions :
‘The General note applicable to Highways Department has been
appended and the General note in Public Works Department Schedule of
Rates for the year 2013-14 has algo to be followed.
‘The present Schedule of Rates consisting of Labour Rate, IRC Metal
Cost exclusively for Highways as in Annexures and Conveyance Table will
come in to force with effect from 01.06.2013.
The Schedule of Rates for the year 2013-14 approved by the
‘committee is herewith forwarded to all the Chief Engineers / Superintending
Engineers / Divisional Engineers including Special. They are requested to
communicate the same to their sub-ordinate officers for adoption,
‘The receipt of this proceedings along with enclosures shall be
acknowledged.
Enel: Schedule of Rates 2013-14.
N. PERIYARAS, ME,
DIRECTOR GENERAL,
‘HIGHWAYS.
To
‘The Chief Engineer (Highways), Construction & Maintenance, Chennai
‘The Chief Engineer (Highways), Planning, Designs &
Investigation, Chennai-82.
‘The Deputy Secretary to Government, Finance Depar-ment, Chennei-9,
Copy to
All Other Chief Engineers (Highways), Chennai
All Superintending Engineers / Divisional Engineers jinchuding Special)
(ower! a ombeereaitls,
HIGHWAYS,
igi