INQUIRY REPORT
ON
CAVING IN OF A PORTION OF NORTHERN BYPASS
3 BRIDGE AT PARACHA CHOWK, SHERSHAH, KARACHI
SUBMITTED TO
Lt. Gen, (R) Farooq Abmad Khan, Chairman, PMIC
BY
INQUIRY TEAM
1. Prof. Dr. 2, Prof. Dr. S.H. Lodi
3, Advocate Engr. Nasir .R. Shaikh 4, Engr. Munir Abmed Rana
5. Engr. Zafar Razeak ~*~ 6, Engr. Farrukh Hassan Pasha
February 2008
Ye OG Fe
Pr
' =(953
3t
Submission Report
‘The Inquiry Report for “Caving in of a Portion of Northern Bypass Bridge at
Paracha Chowk, Shershah, Karachi” in fll is being submitted by the following
‘members of the Inquiry Team to the Chairman, PMIC, Lt. Gen, (R) Farooq Ahmad
Khan,
8
Ava
rate 5A eg
oe
eee
wel ,
‘Mr. Nasir JR. Shalleh Engr. Munir Abmed Rana
Advcate igh Cont (hi Comaing Eire
Pakican (Geran Ein Ce Branch HQ
Ravalpath‘TABLE OF CONTENTS
CONTENTS PAGE NO
Submission Report
Table of Conteats
List of Annexure
List of Attachments
List of Exhibits
INQUIRY REPORT
1. PREAMBLE
2. THE T.o.R OF INQUIRY
3. PROCEDURE ADOPTED FOR THE CONDUCT OF INQUIRY
3... Phase
3.12 Phase-ll
313° Phase
4. CONDUCT OF INQUIRY
43 Statements/Deposition
44 Independent Structural Analysis of the Bridge
4.5 Testing of Material Samples
4.6 Investigation in Land Acquisition Related to Shershah Bridge
4.7 Design Related Issues and their Consequences
4.8 Construction Related Issues
5. INDIVIDUAL AND COMPARATIVE ANALYSIS OF
STATEMENT
5:2Comparative Analysis
52.1 Outcome ofthe Analysis with Respect to NHA
52.2 Optcome ofthe Analysis with Respect to M/s ECHL
52.3 Outcome ofthe Analysis with Respect to M/s NLC
5.2.4 Outcome ofthe Analysis with Respect to Paracha Textile Mills
fat a fore
u
u
u
2
4
15
1”