CLAC 40- Claims & Disputes
» inthe Construction Industry
We Endeavour to achieve through State
of The Art Training Programs.
a—_—
AoW {iN contents’
- INTRODUCTION: DEFINITION & CLASSIFICATION cn
i Derwarion.
CLASSIFICATION AND LEGAL BAS OF CLAIMS
7] CitaPte 1: GENERATION oF cLamMS,
J
‘oven.
Gensnaren a
a CCAASSICATION BY SUBIECT
- NOMACATON nnn - 2
9) cuarten2:cLatms CONCERNING THE EKISTENCE OF A CONTRACT. 1
‘Gowen. - "
= RECOGNITION OF A VALID CONTRACT, 8
i ‘cxracry i
) AOE a
IhteiTIOWTOCREATELEOAL RELATION. “
‘ ‘consiogearion| : is
. Acree. ~ o is
la OFFER AND ABCEPTANC en ~ 1s
sre. bo = 6
+ Revecaron ~ rs
Accerraves - =
COUNTER GFFERS nen — i
ACCEPTANCE SUBJECT TO CONDON nn = aoe
Fonsatmes a = 8
Lerrens or ren, on - 8
“TW ConTRact MUST 9 LEDAL aN POSIBLE. meee
(CASE2.1 CLAIM BASED OW QUALIFIED ACCEPTANCE... 19
{ASE2.2 CLAY ARISING OUT OF LETTER OF IrENT.
[ERRORS AND DISCREPANCIES... 8
) ' ADROCCoNDrTtONs 9
J (CASE: CLAIM IN RESPECT OF ERRORS IN BILL OF QUANTITIES one
‘CHAPTER 4: CLAIMS IN CONNECTION WITH EXECUSION OF THE WORK..
# ‘CONTRACTOR TO SATISFY HIMSELF.
WORK TO BETO THE SATISFACTION OF ENGINEER
Br Sher e-tesgon Conract Adminstraten & Acttration Breau (CLEC 40)j DAMAGETOTHE WORKS. 2
|” SSOBOF ATER DRAWINGS AND INSTRUCTIONS ”
| somwarepsup.conreacts ”
#04 pprecrs. 7
all (48841 CLAM THAT PHYSICAL CONDITIONS ENCOUNTERED WERE WORSE THAN COULD
a HAVE BEEN EXPECTED BY AN EXPERIENCED COVTRACTOR a
(ASE 42 CLAM I RESPECT OF DEFAULT OF A NOMINATED SUB-CONTRACTOR “6
J) | CHAPTER s: CLAIMS CONCERNING PAYMENT PROVISIONS... aes
‘GENERAL. . 2
s VALUATION OF CONTRACT WORK. st
5 VALUATION OF VARIED WORK nr 2
a ‘CASES: LAM IV RESPECT OF VARIED WORK & COVSEQUENTIAL EFFECT ON RICE FOR
al CONTRACT WORE nn be
*_CHAPTER'6 CLAIMS CONCERNING TIME. ne)
Al) cmt - “
4° EVALUATION OF DELAY CLAIMS a" °
u (ASE 62 CLA FOR DELAVARING OUT OF EREOR IN DESI woven BE
qi
qd
u
ge.
ae 0 C,
Atrefact old good items Affiliate عبات Conditions of the contract دقعلا طورش Authorisation Good utility practice lien Provisional Acceptance Certificate