Harga Satuan Tertinggi - 2015

C. HARGA SATUAN DASAR BAHAN DAN MATERIAL

STANDAR BIAYA BAHAN/MATERIAL BANGUNAN

SATUAN
NO BAHAN / MATERIAL SPESIFIKASI BAHAN SAT
HARGA
A. Agregat Kasar, Bahan Perekat & Bahan Jadinya

1 Pasir Urug m3 237,518.33


2 Tanah Urug Pilihan m3 183,900.33
3 Sirtu m3 239,870.00
4 Pasir Teras m3 180,000.00
5 Pasir Pasang Kali m3 206,946.67
6 Pasir Beton m3 289,255.00
7 Abu Batu m3 298,661.67
8 Koral Beton m3 216,353.33
9 Batu Gosok (Apung) Kg 29,913.20
10 Batu Pecah Mesin 1/2 m3 315,123.33
11 Batu Pecah Mesin 2/3 m3 348,752.17
12 Batu Pecah Mesin 3/5 m3 293,958.33
13 Batu Pecah Mesin 5/7 m3 283,305.28
14 Batu Belah Pondasi m3 265,738.33
Batu Bronjol (Untuk
15 Bronjong) m3 309,009.00
16 Batu Koral Beton Kali m3 185,000.00
17 Batu Tempel Hitam m2 266,208.67
18 Batu Pinggir Beton 10 x 20 x 35 buah 24,692.50
19 Batu Pinggir Beton 15 x 35 x 50 K-225 buah 88,893.00
20 Batu Telor m3 124,168.00
21 Batako Kecil 8 x 10 x 20 buah 2,586.83
22 Batako Besar 8 x 20 x 30 buah 3,527.50
23 Con Block 8 x 20 x 40 buah 7,407.75
24 Bata Merah Bakar Kelas I buah 1,152.32

25 Bata Merah Bakar Kelas II buah 905.39

26 Bata Merah Oven (Klingker) buah 1,105.28


27 Bata Ringan buah 9,222.50
28 Rooster Beton 20 x 20 buah 13,263.40
29 Rooster Beton 30 x 30 buah 9,877.00
30 Rooster Jalusi 39 x 18,5 x 9 buah 11,993.50
31 Rooster Motif 20 x 20 buah 25,398.00
32 Rooster Polos 20 x 20 buah 20,812.25

Bahan 1 - Hal 1
Harga Satuan Tertinggi - 2015

33 Rooster Silang 20 x 20 buah 23,634.25


34 Rooster Espana buah 31,747.50
35 Rooster / Bata Kerawang buah 8,254.35
36 Rooster Keramik 30 x 30 buah 49,385.00
37 Rooster Keramik 20 x 20 buah 35,275.00
38 Rooster Keramik 18 x 18 buah 33,158.50
39 Grass Block 20 x 20 buah 21,494.23
40 Grass Block 30 x 30 buah 24,974.70
41 Paving Blok Natural 8 cm m2 114,667.27
42 Paving Blok Warna 8 cm m2 134,374.23
43 Paving Blok Natural 6 cm m2 97,594.17
44 Paving Blok Warna 6 cm m2 112,174.50
45 Canstin Paving Blok m' 110,481.30
46 Semen PC/ 50 Kg zak 82,000.00
47 Semen Putih zak 130,517.50

48 Semen Mortar Utama (MU) Zak 84,660.00


Kanstin Jalan Ukuran Besar
49 (Bina Marga) 1 buah = 60 buah 65,000.00
cm
50
K550, Tanpa Pompa
Readymix Beton m3
51 (Selang) 1,622,650.00
K500, Tanpa Pompa
Readymix Beton m3
52 (Selang) 1,552,100.00
K400, Tanpa Pompa
Readymix Beton m3
53 (Selang) 1,340,450.00
K350, Tanpa Pompa
Readymix Beton m3
54 (Selang) 1,251,086.67
K300, Tanpa Pompa
Readymix Beton m3
55 (Selang) 1,213,460.00
K250, Tanpa Pompa
Readymix Beton m3
56 (Selang) 1,171,130.00
K225, Tanpa Pompa
Readymix Beton m3
57 (Selang) 750,000.00
K175, Tanpa Pompa
Readymix Beton m3
58 (Selang) 1,126,448.33
K125, Tanpa Pompa
Readymix Beton m3
59 (Selang) 1,072,360.00
Kapur Pasang/kapur
60 Tembok m3 485,054.77
61 Kapur Sirih kg 13,169.33
62 Semen warna kg 13,639.67
63 Tanah Liat m3 76,723.13
64 Air liter 689.47

Bahan 1 - Hal 2
Harga Satuan Tertinggi - 2015

65 Formite/spacer buah 28,220.00


66 Hollow/Con Blok 8 x 20 x 40 buah 5,538.18
67 Hollow/Con Blok 8 x 15 x 40 buah 6,490.60
68 Hollow/Con Blok 8 x 10 x 40 buah 5,996.75
69 Semen Nat kg 9,000.00
70 Kapur padam m3 82,300.00
71 Semen merah m3 300,000.00
72 kerikil kg 1,700.00
73 Batu Granit kg 3,900.00
74 Batu Teraso kg 2,400.00
75 alat bantu lot 66,000.00

B. Laburan, Pengisi dan Alatnya


1 Plamir Tembok kg 51,148.75
Cat Tembok ICI Eksterior
2 (Beton) liter 130,517.50
Cat Tembok ICI Interior
3 liter 91,715.00
(Plafon dan Dinding)
4 Cat Tembok Vinilex Kg 30,900.00
Cat dasar ICI untuk Interior
5 liter
(2 pelapis) 138,278.00
6 Cat Tembok Sanlex kg 21,635.33
7 Cat dasar kg 33,581.80
8 Cat Tahan Asam liter 126,990.00
9 Cat Genteng liter 65,611.50
10 Weatershield liter 303,365.00
Pelapis Alkali ICI (Cat
11 kg
Dasar Beton Eksterior) 190,485.00
12 Cat Marka/Spotlight kg 117,254.10
13 Water Profing Emulsion kg 90,304.00

14 Water Profing Membrance ml 112,880.00


15 Rol Cat Tembok buah 35,275.00
16 Kape Tembok buah 12,699.00
17 Kape Kayu buah 10,582.50
18 Soligneum 1 blek kg 39,508.00
19 Plincote m3 38,449.75
20 Pengawetan Kayu m3 423,300.00
21 Pengopenan Kayu buah 634,950.00
22 Kwas 3" buah 18,343.00
23 Oker bks 25,398.00

Bahan 1 - Hal 3
Harga Satuan Tertinggi - 2015

24 Oyan bks 2,822.00


25 Oten (Pewarna Plitur) liter 5,644.00
26 Spirtus kg 14,815.50
Bahan Pelitur Kripik (Sirlak
27 India) kg 64,906.00
28 Dempul Lilin kg 38,802.50
29 Dempul Plitur kg 43,741.00
Dempul Halus / Impra
30 (Wood Filler) liter 38,097.00
31 Dempul Jadi kg 35,275.00
32 Politur liter 64,906.00
33 Politur Jadi liter 66,317.00
34 Terpentin kg 20,459.50
35 Tiner A kg 28,220.00
36 Tiner B liter 23,987.00
37 Kumpon lbr 93,831.50
38 Melamik kg 67,728.00
39 Dempul Plastik kg 61,378.50
40 Dempul Duco kg 40,919.00
41 Ampelas lbr 4,233.00
42 Dempul kayu cap Kucing kg 31,747.50
43 Meni Kayu / Besi kg 24,692.50
44 Sincromat kg 46,563.00
45 Cat Kayu Sieve liter 68,786.25
46 Cat Besi liter 65,258.75
Cat Besi Duco Danaglos /
47 ICI buah 112,880.00
48 Cat Bron kg 88,187.50
49 Karet Lis buah 21,165.00
50 Minyak Cat kg 35,275.00
51 Glass Beet kg 25,398.00
52 Residu liter 35,275.00
54 Vernis ltr 104,300.00
55 Kuas Roll 9" buan 25,000.00

C. BAHAN KAYU BERIKUT BAHAN JADINYA


1 Bambu 5 s/d 7 btg 15,000.00
2 Bambu 7 s/d 10 btg 20,000.00
3 Bambu Gombong btg 53,712.07
Kayu Kamper Singkil /
4 Kayu Samarinda Kls II m3
kapur 8,867,664.67
5 Kayu Balok Borneo Super m3 6,100,223.33
6 Kayu Papan Borneo Super m3 6,255,433.33

Bahan 1 - Hal 4
Harga Satuan Tertinggi - 2015

7 Kayu Balok Kamper Medan (Kruing) m3 8,075,623.33


8 Kayu Papan Kamper Medan (Kruing) m3 8,748,200.00
9 Kayu Balok Kamper Banjar m3 8,040,348.33
10 Kayu Papan Kamper Banjar m3 8,604,748.33
11 Kayu Balok Kamper Samarinda m3 10,606,016.67
12 Kayu Papan Kamper Samarinda m3 11,290,822.00
13 Kayu Balok Rasamala m3 3,922,580.00
14 Kayu Jati Jatim Tua dia. 40 cm m3 14,506,961.33
15 Kayu Jati Jateng Tua 40 cm m3 22,719,922.00
16 Kayu Jati Jabar Tua dia. 40 cm m3 11,982,212.00
17 Kayu Jati Jabar Tua dia. 40 cm Kebawah m3 10,380,021.50
18 Kayu Hutan Kelas I Segeng, Mahoni, Laban m3 3,527,500.00
19 Kayu Balok Albasia Kayu Balok Albasia m3 2,822,000.00
20 Kayu Papan Albasia Kayu Papan Albasia m3 2,963,100.00
21 Dolken 5 s/d 7 Dolken 5 s/d 7 btg 21,306.10
22 Dolken 7 s/d 10 Dolken 7 s/d 10 btg 43,458.80
23 List Profil Kamper 1 cm 1 cm m' 11,852.40
24 List Profil Kamper 2 cm 2 cm m' 14,251.10
25 List Profil Kamper 4 cm 4 cm m' 15,521.00
26 List Profil Kamper 5 cm 5 cm m' 29,866.17
27 List Profil Kamper 10 cm 10 cm m' 55,029.00

28 Pegangan Tangga Profil Jati m' 177,550.83


Pegangan Tangga Profil
29 Kamper m' 68,433.50
30 Kayu Kaso 4/6 m3 4,938,500.00
31 Kayu Kaso 5/7 m3 4,938,500.00
Kayu Reng 2/3 Borneo
32 Super m' 22,000.00
Kayu Reng 2/3 Kamper
33 Banjar m' 10,000.00
Kayu Reng 3/4 Kamper
34 Banjar m' 35,000.00
35 Kayu Papan Terentang m3 3,019,540.00
36 Kayu Balok Terentang m3 2,222,325.00
37 Batang Kelapa btg 846,600.00
38 Tali Ijuk kg 21,165.00
39 Lapisan Ijuk tebal 10 cm tebal 10 cm m2 21,165.00
40 Venetion Blind m2 268,090.00
41 Vertikal Blind m2 615,196.00

Bahan 1 - Hal 5
Harga Satuan Tertinggi - 2015

42 Kayu papan Kelas I m3 3,000,000.00


43 Kayu Balok Kelas I m3 3,000,000.00
44 Kayu Papan Kelas II m3 2,600,000.00
45 Kayu Balok Kelas II m3 2,500,000.00
46 Kayu papan Kelas III m3 1,500,000.00
47 Kayu Balok Kelas III m3 1,500,000.00
Panjang 4 meter ukuran
Dolken Kayu Galam 22,000.00
48 8-10 btg
49 Kayu Papan 3/20 4 m m3 2,100,000.00

D. BAHAN PENUTUP RANGKA PLAFOND


1 Plafond Enternit 4 mm m2 28,220.00
2 Plafond Hardpleks 5 mm 120 x 240 lbr 80,427.00
3 Plafond Asbes Semen 5 mm m2 72,666.50
4 Plafond Asbes Semen 3,5 mm m2 22,576.00
120 x 240 t = 9 mm ex
5 Gypsum DN lbr 88,187.50
120 x 240 t = 9 mm ex
6 Gypsum Luar lbr 107,236.00
7 Tepung Gypsum kg 70,550.00
8 Acustik Amstrong 60 x 120 lbr 208,122.50
9 Cotton Plester buah 14,110.00

10 GRC (120 x 240) cm, t = 4 mm lbr 72,666.50


11 Cornice Coumpound zak 119,935.00
12 List Gypsum m' 5,644.00

E. BAHAN KAYU LAPIS

1 Triplek 3 mm 120 x 240 lbr 67,492.83


2 Triplek 4 mm 120 x 240 lbr 84,895.17
3 Triplek 4 mm ukuran pintu lbr 64,906.00
4 Triplek 6 mm 120 x 240 lbr 125,579.00
5 Triplek 9 mm 120 x 240 lbr 184,841.00
6 Jabar Wood 4 mm lbr 131,223.00
7 Bilik Bambu (Tanpa Kulit) m2 25,398.00

8 Bilik Bambu (dengan Kulit) m2 32,453.00

9 Bilik Bambu Hitam Variasi m2 40,213.50


10 Wall Paper (kelas Biasa) m2 35,275.00
(kelas
11 Wall Paper Menengah/sedang) m2 88,187.50

Bahan 1 - Hal 6
Harga Satuan Tertinggi - 2015

12 Wall Paper (kelas Baik) m2 134,045.00


13 Multiplek 9 mm 120 x 240 lbr 194,718.00
14 Multiplek 12 mm 120 x 240 lbr 255,391.00
15 Multiplek 18 mm 120 x 240 lbr 347,811.50
16 Plywood 18 mm 120 x 240 lbr 401,429.50
17 Plywood 9 mm 120 x 240 lbr 176,375.00
18 Plywood 4 mm 120 x 240 lbr 236,190.82
19 TeakWood 3 mm 120 x 240 lbr 93,126.00
20 TeakWood 4 mm 120 x 240 lbr 165,792.50
3 mm 120 x 240 Uk.
21 TeakWood Pintu lbr 134,045.00
22 TeakWood ukuran pintu 4 mm lbr 124,873.50
23 Tacon (Bahan Bakar) m2 131,928.50
24 Supercon m2 74,783.00
25 Melamin 4 mm 120 x 240 lbr 130,517.50
26 Melamin TOK 4 mm lbr 186,252.00
27 Formika 120 x 240 lbr 227,171.00
28 Formika Ukuran Pintu lbr 172,142.00
29 Formika Warna 4" x 8" lbr 315,076.30

F. BAHAN LANTAI DAN PELAPIS DINDING


1 Tegel PC 20 x 20 20 x 20 buah 1,566.21
2 Plin Tegel PC 20 x 20 20 x 20 buah 1,298.12
3 Tegel PC 30 x 30 30 x 30 buah 3,200.93
4 Plin Tegel PC 15 x 30 15 x 30 buah 999.46
5 Tegel Warna 20 x 20 20 x 20 buah 3,703.88
6 Plin Tegel Warna 10 x 20 10 x 20 buah 1,500.00
7 Tegel Warna 30 x 30 30 x 30 buah 4,233.00
8 Plin Tegel Warna 15 x 30 15 x 30 buah 1,148.60
9 Tegel Wafel PC 20 x 20 20 x 20 buah 4,671.82

10 Tegel Wafel Warna 20 x 20 20 x 20 buah 3,527.50


11 Tegel Badak PC 30 x 30 30 x 30 buah 5,323.70
Poslin 11 x 11 warna 11 x 11 warna standar
12 standar DN DN buah 1,411.00
Poslin 11 x 11 Warna 11 x 11 Warna Khusus
13 Khusus DN DN buah 1,411.00

14 Keramik 10 x 20 dan 20 x 20 KW
1 DN Putih/polos Mulia buah 3,094.75
10 x 20 KW 1
15 Keramik Corak/Warna/ Anti slip
Mulia buah 2,920.00
20 x 20 (KM) KW 1 DN
16 Keramik Corak/Warna/Anti Slip
Mulia buah 2,822.00

Bahan 1 - Hal 7
Harga Satuan Tertinggi - 2015

20 x 20 (KM) KW 1 DN
17 Keramik
Putih polos Mulia buah 2,892.52
20 x 25 Dinding (KM) KW
18 Keramik
1 DN Corak Mulia buah 3,703.86
30 x 30 KW 1 Dn Putih
19 Keramik
Polos Mulia buah 5,836.41
30 x 30 KW 1
20 Keramik Warna/Corak (Anti Slip)
Mulia buah 7,568.09
40 x 40 KW 1 DN Putih
21 Keramik
Polos Mulia buah 11,288.00
40 x 40 KW 1 DN
22 Keramik Warna/Corak (Anti Slip)
Mulia buah 13,639.67
10 x 20 dan 20 x 20 KW
23 Keramik
1 DN Putih/polos Roman
buah 2,822.00
10 x 20 KW 1 DN
24 Keramik Corak/Warna/Anti Slip
Roman buah 3,259.41
20 x 20 (KM) KW 1 DN
25 Keramik Corak/Warna/Anti Slip
Roman buah 3,866.14
20 x 20 (KM) KW 1 Dn
26 Keramik
Putih Polos Roman buah 5,079.60
20 x 25 Dinding (KM) KW
27 Keramik
1 DN Coarak Roman
buah 3,950.80
30 x 30 KW 1 DN Polos
Keramik
28 Roman buah 9,428.05
30 x 30 KW 1 DN
29 Keramik Warna/Corak (Anti Slip)
Roman buah 7,439.82
40 x 40 KW 1 DN Polos
Keramik
30 Roman buah 11,523.17
40 x 40 KW 1 DN
31 Keramik Warna/Corak (Anti Slip)
Roman buah 8,979.09
60 x 60 (Masterina
Keramik
32 Polos) buah 30,571.67
60 x 60 (Masterina
Keramik
33 Corak) buah 37,302.14
60 x 60 (Masterina
Keramik
34 Muda) buah 50,448.42
35 Keramik 60 x 60 (Masterina Tua) buah 52,186.78
36 Keramik 60 x 60 (Roman Polos) buah 40,416.67
37 Keramik 60 x 60 (Roman Corak) buah 47,551.17
38 Keramik 60 x 60 (KIA Polos) buah 31,000.00

Bahan 1 - Hal 8
Harga Satuan Tertinggi - 2015

39 Keramik 60 x 60 (KIA Corak) buah 33,028.69


40 Keramik 60 x 60 (Mulia Polos) buah 29,153.61
41 Keramik 60 x 60 (Mulia Corak) buah 32,775.18
42 Plin Keramik 60 x 60 buah 48,021.97
10 x 60 cm (berbagai
43 Plin Ubin Granito
ukuran) buah 5,910.40
44 Stepnosing Keramik
(Berbagai ukuran) buah 6,000.00
Stepnosing Granito (kelas
45 Baik) buah 6,036.43
46 Vinyl Lantai Dasar m2 86,917.60
47 Karpet kelas baik LN m2 1,534,095.64
48 Karpet Kelas sedang LN m2 511,035.98
49 Parquet Jati m2 468,159.92

50 Stairnosing Keramik 10/20 buah 1,675.35


51 Stairnosing Fiber m 24,880.16
52 Taraso Kerang 30 x 30 m2 41,503.15
53 Plin Taraso 10 x 30 buah 34,441.10
Graniit Alam LN Ukuran
54 Besar m2 1,975,400.00
Graniit Alam LN Ukuran
55 Kecil m2 917,150.00
Graniit Alam DN Ukuran
56 Besar m2 1,889,075.02
Graniit Alam DN Ukuran
57 Kecil m2 1,650,130.64
58 Granito Tile Essenza ukuran 40 x 40 Polis m2 113,820.67
59 Granito Tile Essenza ukuran 30 x 30 m2 93,126.00
60 Granito Tile Essenza ukuran 40 x 40 Unpolis m2 95,242.50
61 Marmer m2 660,065.80
62 Marmer Alam Lampung ukuran Besar m2 772,522.50
63 Marmer Alam Lampung ukuran Kecil m2 613,785.00
64 Marmer Alam ukuran Besar m2 518,542.50
65 Marmer Alam ukuran Kecil m2 317,475.00
66 Marmer Sintesis m2 285,727.50
67 Granito Tile Essenza 60 x 60 Polis m2 677,280.00
68 Granito Tile Essenza 60 x 60 Unpolis m2 571,455.00
69 Batu Tempel Hitam m2 335,393.29
70 Bata Karawang buah 23,793.69
Campuran untuk Kedap Air
71 (AM) liter 493,800.62

Bahan 1 - Hal 9
Harga Satuan Tertinggi - 2015

72 Plin Keramik 10 x 20 buah 18,343.00


73 Plin Keramik 10 x 25 buah 18,343.00
74 Plin Keramik 10 x 30 buah 18,343.00
75 Plin Keramik 10 x 40 buah 5,975.59
76 Plin Keramik 15 x 30 buah 6,410.17
77 Plin Keramik 15 x 40 buah 2,328.15
78 Plin Granito 10 x 30 buah 13,472.23
79 Plin Granito 10 x 40 buah 14,993.29
80 Plin Granito 15 x 30 buah 16,514.34
81 Plin Granito 15 x 40 buah 21,294.81
82 Keramik Artistik 10 X 20 Cm buah 960.00
83 Keramik Artistik 5 X 20 Cm buah 1,860.00
84 Ubin Keramik 10 x 20 buah 1,050.00
Ubin Keramik (10 x 10) atau
560.00
85 (5 x 20) cm buah
86 Ubin Keramik 33 x 33 cm buah 4,500.00
Ubin Keramik 10 x 33 cm,
1,400.00
87 variasi/border buah
88 Mozaik 30 x 30 Cm buah 30,000.00
89 Ubin Teraso 30 x 30 Cm buah 5,348.00
underlayer / Rubber
85,000.00
90 Corrugated m2
91 Gymfloor m2 125,000.00
92 Vinyl buah 17,000.00
93 Vinyl karet (15 x 30) cm buah 55,000.00
Vinyl Kayu Kelas II (2 x 10)
94 cm m2 7,750,000.00
95 Floor hardener kg 28,000.00
96 Plin Keramik Artistik 10 x 10 cm buah 10,000.00
97 Plin Keramik Artistik 5 X 20 Cm buah 5,000.00
98 Plin Teraso 10 X 30 Cm buah 3,480.00
99 Internal cove (5 x 5 x20) cm buah 6,500.00

G. BAHAN SALURAN AIR KOTOR / BERSIH

1 Grafel U 20 cm' m' 42,330.00


2 Grafel U 30 cm' m' 56,440.00
3 Grafel U 40 cm' m' 126,990.00
4 Buis Beton 20 cm (1 m') m' 66,787.33
5 Buis Beton 30 cm (1 m') m' 92,890.83
6 Buis Beton 40 cm (1 m') m' 122,757.00
7 Buis Beton 50 cm (1 m') stk 169,320.00

Bahan 1 - Hal 10
Harga Satuan Tertinggi - 2015

8 Buis Beton 60 cm (1 m') stk 221,997.33


9 Buis Beton 100 cm (0.50 m') stk 564,400.00
10 Buis Beton 80 cm (0.50 m') stk 409,190.00
11 Buis Tanah 10 cm (0.50 m') stk 16,932.00
12 Buis Tanah 15 cm (0.50 m') stk 21,165.00
13 Buis Tanah 20 cm (0.50 m') stk 28,220.00
14 Buis Tanah 25 cm (0.50 m') stk 35,275.00
15 Injuk Gulung 9,524.25

H. BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Beton U-24 Rata-rata kg 15,000.00
2 Besi Beton U-39 / U-32 Rata-rata kg 21,400.00
U-24 dia. 10 mm,
3 btg
Besi Beton panjang 12 m 65,000.00
U-24 dia. 12 mm,
4 btg
Besi Beton panjang 12 m 95,000.00
U-24 dia. 16 mm,
5 btg
Besi Beton panjang 12 m 165,000.00
U-24 dia. 19 mm,
6 btg
Besi Beton panjang 12 m 218,500.00
Pagar BRC lengkap tiang
7 m2
(tanpa Pondasi) 176,375.00
8 Bondek m2 184,135.50
9 Besi WF ex DN SII kg 13,686.70
10 Besi WF ex Jepang kg 29,008.75
11 Besi Profil Dn SII kg 15,521.00
12 Besi Profil ex LN kg 18,343.00
13 Besi C Lip Chanel kg 15,521.00
14 Ongkos Galfanis Besi kg 22,815.87
15 Kawat Beton kg 21,165.00
16 Kawat Duri kg 51,501.50
17 Kawat Pengikat m' 16,932.00
18 Kawat Bronjong 4 mm kg 31,747.50
19 Kawat Tembaga kg 37,038.75
20 Ram Nyamuk Hijau m2 32,100.25
21 Ram Kawat 1 x 1 (Putih) m2 21,517.75
22 Ram Ayam m2 20,106.75
23 Kawat Kasa 1 x 1 (Putih) m2 25,750.75
24 Kawat Harmonika 4 cm m2 38,802.50

Bahan 1 - Hal 11
Harga Satuan Tertinggi - 2015

25 Kawat Harmonika 2 cm m2 48,679.50


26 Kawat Las Listrik kg 38,802.50
27 Wiremess M8 m2 476,212.50
28 Wiremess M6 m2 297,015.50
29 Timah kg 35,275.00
30 Timah Hitam kg 56,440.00
31 Ram Nyamuk Alluminium m2 28,220.00
Plat Strip θ 2 x 30 mm (6
32 m') θ 2 x 30 mm (6 m') btg 45,152.00
Plat Strip θ 3 x 30 mm (6
33 m') θ 3 x 30 mm (6 m') btg 61,378.50
34 Plat Strip btg 49,108.44
35 Besi Strip kg 55,518.62
36 Plat Alluminium 0.2 mm 0.2 mm m2 82,543.50
37 Plat Alluminium 0.3 mm 0.3 mm m2 148,155.00
38 Plat Alluminium 0.4 mm 0.4 mm m2 180,608.00
39 Plat Alluminium 0.5 mm 0.5 mm m2 214,472.00
40 Plat Alluminium 0.6 mm 0.6 mm m2 248,336.00
41 Plat Alluminium 0.1 mm 0.1 mm m2 70,550.00
Kusen Aluminium Natural
42 1.3 mm t = 1,3 mm (4") m'
1.3 mm t = 1,3 mm (4") 75,000.00
Kusen Aluminium Warna
43 1.3 mm t = 1,3 mm (4") m'
1.3 mm t = 1,3 mm (4") 85,000.00
Kusen Aluminium Natural
44 1.3 mm t = 1,3 mm (3") m'
1.3 mm t = 1,3 mm (3") 60,000.00
Kusen Aluminium Warna
45 1.3 mm t = 1,3 mm (3") m'
1.3 mm t = 1,3 mm (3") 75,000.00
Daun Jendela Aluminium
46 Natural (tanpa kaca dan m2
accesoris) 115,000.00
Daun Jendela Aluminium
47 Warna (tanpa kaca dan m2
accesoris) 132,000.00
Daun Pintu Aluminium
48 Natural (tanpa kaca dan m2
accesoris) 115,000.00
Daun Pintu Aluminium
49 Natural (tanpa kaca dan m2
accesoris) 132,000.00

Bahan 1 - Hal 12
Harga Satuan Tertinggi - 2015

Pintu PVC (Kualitas


50 Sedang) buah 290,877.65
51 Pintu PVC (Kualitas Baik) buah 335,719.23
Handle Aluminium (Tarikan
52 buah
Pintu Aluminium) 352,750.00
53 Kait angin Aluminium ps 155,691.15
Karet Accesoris
54 m'
Kusen/Pintu Aluminium 30,638.45
55 Jalusi Aluminium m' 59,755.85
56 Sunscreen Aluminium m2 521,505.60
Seng Plat BJLS 30 60 cm
57 (100 m') 30 60 cm (100 m') roll 21,165.00
Seng Plat BJLS 30 90 cm
58 (100 m') 30 90 cm (100 m') roll 32,453.00
59 Plat Besi Tipis 1 mm 1 mm kg 19,754.00
60 Plat Besi Tipis 0.5 mm 0.5 mm kg 21,165.00
61 Plat Besi 2 mm s/d 5 mm 2 mm s/d 5 mm kg 16,932.00
62 Plat Besi 6 mm s/d 10 mm 6 mm s/d 10 mm kg 16,932.00
63 Plat Besi 10 mm keatas 10 mm keatas kg 16,932.00
64 Kabel Presstress polos kg 36,070.80
65 Jaring Kawat baja kg 100,498.48
66 Lem Kuning (Aibond) kg 88,893.00
67 Lem Fox kg 40,919.00
68 Lem Vinyl kg 28,220.00
69 Besi Strip Kaca Nako kg 50,086.27
70 Profil Aluminium m' 25,532.05
Besi Hollow ( 2 x 4 x 4 ) cm
71 (400 cm) ( 2 x 4 x 4 ) cm (400 cm) btg 15,521.00
Besi Hollow 4 x 4 cm (400
72 cm) 4 x 4 cm (400 cm) btg 36,686.00
73 Besi Rail Pengamanan kg 706,205.50
74 Jendela Besi m2 493,850.00
75 Jendela Besi Tahan Api m2 663,522.75
76 Pintu Gulung Besi m2 597,636.11
77 Pintu Rolling Door m2 455,036.92
Jendela Nako Kaca Ryben
78 + Tralis 6 klips set 273,674.03
Jendela Nako Kaca Ryben
79 + Tralis 7 klips set 304,172.80
Jendela Nako Kaca Ryben
80 + Tralis 8 klips set 337,814.57
Jendela Nako Kaca Ryben
81 10 klips set
+ Tralis 471,450.38

Bahan 1 - Hal 13
Harga Satuan Tertinggi - 2015

Jendela Nako Kaca Bening


82 4 klips set
+ Tralis 209,300.69
Jendela Nako Kaca Bening
83 5 klips set
+ Tralis 206,739.72
Jendela Nako Kaca Bening
84 6 klips set
+ Tralis 244,106.53
Jendela Nako Kaca Bening
85 7 klips set
+ Tralis 313,136.18
Jendela Nako Kaca Bening
86 8 klips set
+ Tralis 333,507.49
Jendela Nako Kaca Bening
87 10 klips set
+ Tralis 424,887.38
88 Hollow 60 x 60 x 1.8 btg 156,917.31
89 Hollow 60 x 60 x 1.6 btg 314,300.25
90 Hollow 50 x 50 x 2.5 btg 220,962.60
91 Hollow 50 x 50 x 1.0 btg 117,338.76
92 Hollow 50 x 50 x 1.6 btg 205,723.80
93 Hollow 50 x 50 x 1.3 btg 156,959.64
94 Hollow 40 x 60 x 2.0 btg 217,914.84
95 Hollow 40 x 60 x 1.6 btg 198,104.40
96 Hollow 40 x 40 x 1.8 btg 167,626.80
97 Hollow 40 x 40 x 1.6 FL btg 234,444.71
98 Hollow 40 x 40 x 1.6 btg 164,579.04
99 Hollow 40 x 40 x 1.3 btg 124,958.16
100 Hollow 40 x 40 x 1.0 btg 102,099.96
101 Hollow 40 x 40 x 1.0 B btg 122,227.88
102 Hollow 40 x 40 x 0.8 / 4 m btg 174,029.21
103 Hollow 30 x 60 x 1.8 btg 198,104.40
104 Hollow 30 x 60 x 1.6 btg 182,865.60
105 Hollow 30 x 30 x 2.0 btg 131,053.68
106 Hollow 30 x 30 x 1.6 btg 121,910.40
107 Hollow 30 x 30 x 1.3 btg 92,956.68
108 Hollow 30 x 30 x 1.0 btg 68,574.60
109 Hollow 30 x 30 x 1.0 B btg 105,232.38
110 Hollow 30 x 30 x 1.0 C btg 116,058.28
111 Hollow 30 x 30 x 0.8 / 4 m btg 58,669.38
112 Hollow 20 x 40 x 1.8 btg 138,673.08
113 Hollow 20 x 40 x 1.8 B btg 140,211.07
114 Hollow 20 x 40 x 1.6 btg 122,672.34
115 Hollow 20 x 40 x 1.6 B btg 173,796.40
116 Hollow 20 x 40 x 1.3 btg 92,956.68

Bahan 1 - Hal 14
Harga Satuan Tertinggi - 2015

117 Hollow 20 x 40 x 1.3 B btg 165,827.78


118 Hollow 20 x 40 x 1.0 btg 89,908.92
119 Hollow 20 x 40 x 1.0 B btg 892,729.12
120 Hollow 20 x 40 x 0.8 / 4 m btg 60,955.20
121 Hollow 50 x 25 x 2.0 btg 175,246.20
122 Hollow 50 x 25 x 1.6 btg 146,292.48
123 Hollow 50 x 25 x 1.3 btg 115,814.88
124 Hollow 50 x 25 x 1.0 btg 85,337.28
125 Hollow 50 x 25 x 0.8 / 4 m btg 113,264.50
126 Hollow 20 x 20 x 2.0 btg 89,146.98
127 Hollow 20 x 20 x 1.6 btg 77,717.88
128 Hollow 20 x 20 x 1.3 btg 62,479.08
129 Hollow 20 x 20 x 1.0 btg 44,192.52
130 Hollow 20 x 20 x 0.8 / 4 m btg 32,904.52
131 Besi Siku L 30 x 30 x 3 kg 48,000.00
132 Scuare Tube m 24,100.00
133 Pintu Folding Door m2 429,990.00
Pengelasan teralis
134 jendela,pintu,roster,void cm 150,000.00
ukuran (100 x 50) cm
135 Pengelasan pagar m2 350,000.00
136 Pengelasan kanopi m2 285,000.00
137 Pintu aluminium natural m2 211,800.00
Pintu aluminium swing +
138 kaca polos 5 mm m 1,000,000.00
Pintu Frameless (tempered
139 12 mm polos) floor hinge m 3,000,000.00
dorma BTS 84
Pintu fitting (tempered 12
140 mm polos) floor hinge m 3,750,000.00
dorma BTS 84

powder coating aluminium


m' 20,000.00
berbagai warna
141
tirai (Venetion blind and
m2 537,300.00
142 vertical blind)
143 folding gate 0.5 mm m2 400,000.00
144 Baja Strip 0,2 X 2 cm btg 22,396.80
145 Besi Strip Kaca kg 50,710.00
146 sekop bh 55,000.00
145 pacul bh 50,000.00

Bahan 1 - Hal 15
Harga Satuan Tertinggi - 2015

I. BAHAN KACA
1 Kaca Polos 2 mm (ASAHI) m2 107,706.33

2 Kaca Polos 3 mm (ASAHI) m2 112,409.67

3 Kaca Polos 5 mm (ASAHI) m2 124,168.00

4 Kaca Polos 8 mm (ASAHI) m2 207,417.00

5 Kaca Polos Sanblas 5 mm m2 317,475.00


6 Kaca Biasa 6 mm m2 294,743.79
Kaca Reyband 5 mm
7 (ASAHI) m2 169,320.00
8 Kaca Reyband 6 mm m2 310,420.00
Kaca Reyband 8 mm
9 (ASAHI) m2 423,300.00
Kaca Reyband 12 mm
10 (ASAHI) m2 846,600.00
11 Kaca Es / Susu 3 mm m2 137,882.92
12 Kaca Es / Susu 5 mm m2 229,804.00
13 Kaca Cermin 5 mm m2 285,727.50
14 Kaca Cermin 6 mm m2 277,049.85
15 Kaca Cermin 8 mm m2 333,329.00
Kaca Patri Lokal Terpasang
16 (ASAHI) m2 2,058,973.53
Kaca Patri ex Luar Negeri
17 Terpasang m2 5,284,195.00
18 Kaca 6 mm Gravver m2 1,844,177.00
19 Kaca Lukis Terpasang m2 138,439.59
Glass Block DN 20 x 20
20 (Kedawung)
Glass Block DN 20 x 20 ex buah 32,453.00
21 LN buah 125,579.00
22 Sealant kg 197,540.00
23 Jendela Nako buah 49,385.00

J. BAHAN PAKU DAN MUR BAUT


1 Paku 1 cm s/d 3 cm kg 21,870.50
2 Paku 4 cm s/d 7 cm kg 16,932.00
3 Paku 8 cm s/d 15 cm kg 16,932.00

4 Paku Beton 2 cm s/d 5 cm buah 3,174.75


5 Paku Kait Lengkap buah 2,116.50
6 Paku Cacing kg 79,016.00
7 Besi Beugeul Kuda-kuda kg 22,576.00
8 Duk Angker buah 25,398.00

Bahan 1 - Hal 16
Harga Satuan Tertinggi - 2015

Angker Mur Baut dia. 19 /


9 Panjang 60 cm buah 8,466.00
Mur Baut HTB dia. 19 s/d
10 16 (5 cm) buah 10,582.50
Mur Baut Biasa dia. 19 s/d
11 16 (5 cm) buah 7,055.00
12 Piser dia. 12 s/d 20 cm buah 14,110.00
13 Paku Sekrup 3" buah 1,058.25
14 Ramset / Dinabolt buah 4,233.00
15 Baut Besar buah 11,288.00
16 Baut Kecil buah 1,411.00
17 Paku GRC kg 36,686.00
18 Paku Gypsum kg 35,275.00
19 Sekrup Fixer buah 1,411.00
20 Paku Skrup 5 cm kg 13,000.00
21 Paku Seng kg 18,000.00
22 Cotton Plaster buah 67,650.00
23 Cornice Coumpound zak 91,300.00
24 Paku Hak Panjang 15 cm kg 13,300.00

K. BAHAN PERPIPAAN
Besi Pipa untuk Hydrant
1 BSP 1" btg 224,349.00
Besi Pipa untuk Hydrant
2 BSP 1.15" btg 256,802.00
Besi Pipa untuk Hydrant
3 BSP 1.5" btg 304,776.00
Besi Pipa untuk Hydrant
4 BSP 2" btg 410,601.00
Besi Pipa untuk Hydrant
5 BSP 2.5" btg 701,972.50
Besi Pipa untuk Hydrant
6 BSP 3" btg 809,208.50
Besi Pipa untuk Hydrant
7 BSP 4" btg 1,077,298.50
Besi Pipa untuk Hydrant
8 BSP 6" btg 2,225,147.00

9 Besi Pipa Hitam 1" t = 2 mm btg 138,905.90

10 Besi Pipa Hitam 2" t = 2 mm btg 270,206.50

11 Besi Pipa Hitam 3" t = 2 mm btg 465,747.58

12 Besi Pipa Hitam 4" t = 2 mm btg 565,928.58

13 Besi Pipa Hitam 6" t = 2 mm btg 1,030,030.00

Bahan 1 - Hal 17
Harga Satuan Tertinggi - 2015

Pipa GIP Medium A 1/2" (6


14 m') btg 211,650.00
Pipa GIP Medium A 3/4" (6
15 m') btg 268,090.00
Pipa GIP Medium A 1" (6
16 m') btg 306,892.50
Pipa GIP Medium A 1 1/4"
17 (6 m') btg 380,970.00
Pipa GIP Medium A 1 1/2"
18 (6 m') btg 359,805.00
Pipa GIP Medium A 1 3/4"
19 (6 m') btg 486,795.00
Pipa GIP Medium A 2" (6
20 m') btg 684,335.00
Pipa GIP Medium A 2 1/2"
21 (6 m') btg 846,600.00
Pipa GIP Medium A 4" (6
22 m') btg 1,502,715.00
Pipa GIP Medium A 3" (6
23 m') btg 1,171,130.00
Macam-macam
24 Sambungan GIP 1/2" buah 9,524.25
Macam-macam
25 Sambungan GIP 3/4" buah 11,993.50
Macam-macam
26 Sambungan GIP 1" buah 17,284.75
Macam-macam
27 Sambungan GIP 1 1/4" buah 23,281.50
Macam-macam
28 Sambungan GIP1 1/2" buah 27,161.75
Macam-macam
29 Sambungan GIP 1 3/4" buah 31,042.00
Macam-macam
30 Sambungan GIP 2" buah 56,440.00
Macam-macam
31 Sambungan GIP 2 1/2" buah 67,022.50
Macam-macam
32 Sambungan GIP 3" buah 106,370.35
Macam-macam
33 Sambungan GIP 4" buah 140,538.77
Pipa PVC RUCIKA type AW
34 1/2" btg 42,330.00
Pipa PVC RUCIKA type AW
35 3/4" btg 59,967.50
Pipa PVC RUCIKA type AW
36 1" btg 57,851.00
Pipa PVC RUCIKA type AW
37 1 1/4" btg 81,838.00

Bahan 1 - Hal 18
Harga Satuan Tertinggi - 2015

Pipa PVC RUCIKA type AW


38 1 1/2" btg 97,711.75
Pipa PVC RUCIKA type AW
39 2" btg 128,401.00
Pipa PVC RUCIKA type AW
40 2 1/2" btg 156,973.75
Pipa PVC RUCIKA type AW
41 3" btg 240,222.75
Pipa PVC RUCIKA type AW
42 4" btg 385,908.50
Pipa PVC RUCIKA type AW
43 6" btg 1,008,865.00
Pipa PVC RUCIKA type AW
44 8" btg 1,242,385.50
Pipa PVC MASPION ABU
45 type AW 1/2" btg 37,391.50
Pipa PVC MASPION ABU
46 type AW 3/4" btg 159,301.90
Pipa PVC MASPION ABU
47 type AW 1" btg 122,895.28
Pipa PVC MASPION ABU
48 type AW 1 1/4" btg 45,152.00
Pipa PVC MASPION ABU
49 type AW 1 1/2" btg 48,679.50
Pipa PVC MASPION ABU
50 type AW 2" btg 69,844.50
Pipa PVC MASPION ABU
51 type AW 2 1/2" btg 158,737.50
Pipa PVC MASPION ABU
52 type AW 3" btg 218,705.00
Pipa PVC MASPION ABU
53 type AW 4" btg 331,585.00
Macam-macam
54 Sambungan Paralon 1/2" buah 4,938.50
Macam-macam
55 Sambungan Paralon 3/4" buah 6,702.25
Macam-macam
56 Sambungan Paralon 1" buah 7,407.75

Macam-macam
57 Sambungan Paralon 1 1/4" buah 9,877.00

Macam-macam
58 Sambungan Paralon 1 1/2" buah 13,404.50

Macam-macam
59 Sambungan Paralon 1 3/4" buah 13,404.50

Bahan 1 - Hal 19
Harga Satuan Tertinggi - 2015

Macam-macam
60 Sambungan Paralon 2" buah 21,870.50

Macam-macam
61 Sambungan Paralon 2 1/2" buah 32,453.00
Macam-macam
62 Sambungan Paralon 3"
Macam-macam buah 40,919.00
63 Sambungan
Sambungan Paralon 4" buah 60,673.00
Pipa PVC
64 Jenis AW 4" TY buah 123,462.50
65 Lem Paralon tube 14,110.00
66 Solatif Ledeng gl 5,644.00
Pipa PVC 4" Berlobang
67 Jenis AW m' 80,779.75

68 PVC Waterstop Lebar 150 m' 70,077.32

69 PVC Waterstop Lebar 200 m' 69,316.79

70 PVC Waterstop Lebar 230 m' 80,290.13

71 PVC Waterstop Lebar 250 m' 90,285.66

72 PVC Waterstop Lebar 300 m' 101,910.89

73 PVC Waterstop Lebar 320 m' 109,624.82


74 Strorox - 100 kg 38,500.00
75 Pipa Tanah buah 10,850.00
76 Pipa Beton buah 49,000.00

L. BAHAN SANITAIR

1 Stop Kran 3/4" KIT buah 112,880.00


2 Stop Kran 1" KIT buah 159,443.00
3 Stop Kran 1 1/2" KIT buah 318,886.00
4 Stop Kran 2" KIT buah 486,089.50
5 Stop Kran 2 1/2" KIT buah 1,223,337.00
6 Stop Kran 3" KIT buah 1,579,614.50
7 Check Valve 1/2" buah 94,537.00
8 Double Neple 1/2" buah 57,145.50
9 Water Mur 1/2" buah 50,090.50
10 Gate Walve 1/2" buah 74,077.50
Saringan Air Lt. KM
11 Stainless Steel buah 70,902.75
12 Apooer Bath Tube buah 232,815.00
13 Kran Stainless Lokal Kait buah 56,440.00
14 Shower dengan Tiang buah 226,465.50

Bahan 1 - Hal 20
Harga Satuan Tertinggi - 2015

15 Shower Tanpa Tiang buah 123,462.50


Kran Tembok Sun Eui dia.
16 1/2" buah 82,543.50

17 Kran Tembok ITAP dia. 1/2" buah 45,857.50


18 Kran Bebek Sun Eui 1/2" buah 144,274.75
19 Kran Bebek ITAP 1/2" buah 75,841.25
Kran Panas Dingin Sun Eui
20 Standard buah 330,174.00
21 Bath Cape Washteren unit 3,342,659.00
22 Tempat Sabun Poslin buah 76,899.50
Wastafel Lengkap TOTO
23 LW 230 unit 1,329,162.00

24 Wastafel Lengkap INA unit 804,270.00


Closet Jongkok Poslin
25 Warna TOTO unit 321,002.50
Closet Jongkok Standard
26 unit
Putih Poslin TOTO 283,611.00
Closet Jongkok Lengkap
27 unit
Sistem Jet TOTO 2,803,657.00
Closet Duduk Warna
28 Standard TOTO C 240 unit
Lengkap 2,522,868.00
29 Closet Jongkok KIA buah 169,117.94
Closet Jongkok INA (Wanan
30 gelap) buah 271,617.50
31 Closet Duduk KIA unit 854,656.81
Closet Dudduk Ina (Warna
32 Gelap) buah 1,692,720.26
Wastafel Bulat Warna
33 Standard Lengkap unit 1,434,987.00
Wastafel Type Amerika
34 Standard buah 115,560.90
35 Wastafel Meja buah 795,228.66
Closet Duduk Warna
36 Standar INA Lengkap buah 1,891,445.50
Urinoir Lengkap TOTO
37 Warna Standard unit 2,735,929.00
Penyekat Poslin Urinoir
38 TOTO lbr 846,600.00
Kitchen Zink Stainless
39 buah
Standard Lokal ( 1 Lubang)
546,057.00
Kitchen Zink Stainless Non
40 Standard Franke( 1 buah
Lubang) 1,413,116.50

Bahan 1 - Hal 21
Harga Satuan Tertinggi - 2015

Kitchen Zink Stainless Non


41 Standard Franke( 1 buah
Lubang) 1,596,546.50
42 Talang PVC U-15 cm btg 63,495.00
43 Water Drain + Acsesoris set 1,250,526.97
44 Clean Out buah 885,374.28
Septictank Biofil (Type BF-
45 unit 6,750,000.00
03, BF-06-08, dst)
Septictank Ipal Biofil (Type
46 unit
R-05, R-10, dst) 13,600,000.00

M. BAHAN PENUTUP ATAP


Atap Plastik Gelombang 80
1 x 180 lbr 84,448.35
Atap Fiber Glass Tipis 80 x
2 lbr
180 (Gelombang) 84,660.00
Atap Fiber Glass Tebal 80 x
3 lbr
180 (Gelombang) 82,543.50
Atap Aluminium Natura
4 USR 26 (JAINDO) m2 149,566.00
Atap Aluminium Warna
5 USR 26 (JAINDO) m2 251,158.00
Atap Asbes Gel. Kecil 80 x
6 180 x 4 mm lbr 91,715.00
Atap Asbes Gel. Besar 80 x
7 180 x 4 mm lbr 125,579.00
Atap Seng Gelombang 80
8 lbr
cm x 180 cm x 3 mm 70,550.00
Atap Seng Gelombang 80
9 lbr
cm x 180 cm x 5 mm 91,009.50
Atap Seng Gelombang 270
10 lbr
cm x 106 cm x 4 mm 110,763.50
Atap Seng Gelombang 240
11 lbr
cm x 105 cm x 4 mm 98,064.50
Atap Seng Gelombang 210
12 lbr
cm x 105 cm x 4 mm 87,482.00
Atap Seng Gelombang 150
13 lbr
cm x 105 cm x 4 mm 63,495.00
Atap Seng Gelombang 150
14 lbr
cm x 102 cm x 5 mm 63,495.00
Atap Seng Gelombang 180
15 lbr
cm x 102 cm x 5 mm 128,203.46
Atap Seng Gelombang 300
16 lbr
cm
Atapx Tegola
105 cmKubota,
x 4 mm 123,462.50
17 lengkap m2 759,118.00

Bahan 1 - Hal 22
Harga Satuan Tertinggi - 2015

Atap Tegola Kubota


18 Kwalitas sedang m2 420,478.00
19 Aluminium Foil m2 27,161.75
Atap Genteng Plentong
20 Pres Bakar KW 1 buah 2,645.63
Atap Genteng Plentong
21 buah
Pres Molen Oven KW 2 2,645.63
Atap Genteng Flam pres
22 buah
Molen Oven Jatiwangi 2,645.63
Bubung Genteng pres Bulat
23 ex Jatiwangi buah 7,055.00
Genteng Bubungan ex
24 Jatiwangi Segitiga buah 4,233.00
25 Genteng Bubungan Beton buah 14,124.11
Genteng Metal (Rainbow
26 Roof) m2 81,838.00
27 Genteng Metal Hana m2 228,375.99
Nok Atas Metal (Rainbow
28 Roof) lbr 135,456.00
29 Nok Atas Metal Hana lbr 118,524.00
Nok Pinggir Metal (Rainbow
30 Roof) lbr 99,475.50
31 Nok Pinggir Metal Hana lbr 148,155.00
Wall Flasing (Rainbow
32 Roof) lbr 150,977.00
33 Wall Flasing Hana lbr 117,113.00
Atap Genteng Beton Warna
34 14.5/m2 m2 130,517.50
35 Genteng Beton Natural m2 91,715.00
36 Sirap Kelas 1 buah 155,210.00
Genteng Keramik Natural
37 Intan 14.5/m2 m2 130,500.00
Genteng Keramik Glasur
38 m2
Standard 14.5/m2 137,750.00
Genteng Keramik Glasur
39
Spesial 14.5/m2 m2 100,886.50
Genteng Keramik Glasur
40 m2
Premium 14.5/m2 112,174.50
Genteng Murando Natural 1
41 m2 = 18 buah
Genteng Murando Glasur 1 buah 4,500.00
42 m2 = 18 buah buah 6,000.00
43 Bubung Murando Natural buah 9,171.50
44 Bubung Murando
Bubungan Glasur
Genteng buah 11,640.75
45 Keramik buah 24,692.50
46 Atap Genteng Kodok buah 3,574.53
47 Bubungan Genteng Kodok buah 7,055.00
Bubungan Genteng
48 Plentong buah 7,055.00

Bahan 1 - Hal 23
Harga Satuan Tertinggi - 2015

49 Bubungan Stel Gelombang buah 13,363.58


50 Nok Genteng Metal lbr 75,770.70
51 Nok Atap Seng lbr 50,846.80
Nok Standar 40 cm 18,
52 SWG 22 m2 74,423.20
53 Pelat Asbes tebal 4 mm lbr 21,165.00
54 Pelat Asbes tebal 3.5 mm lbr 30,964.40
Trusses ZAM-75 t = 0.8
55 Rangka Utama m' 36,722.69
Trusses ZAM-75 t = 0.8
56 Rangka Utama m' 37,157.27
Reng 16-DB Roof Battens t
57 = 0.48 mm m' 47,974.00
58 Foot Plate t = 1.22 mm m' 13,037.64
59 PLD - Diafragma Plate buah 6,301.53
60 Wind Bracing m' 3,042.12
Tensioner (Pengaku Tali
61 Angin) buah 9,343.64
62 Acrilic m2 1,273,145.30
63 Policarbonate m2 1,273,145.30
64 Atap Zingkalum m2 108,647.00
65 Atap Spandek m2 121,467.35
66 Atap Superdek m2 144,935.10
67 Atap Bondek m2 159,276.50

68 Bubungan Atap Zingkalum m' 100,607.12


69 Bubungan Atap Spandek m' 249,562.16
70 Bubungan Atap Superdek m' 117,664.70
71 Bubungan Atap Bondek m' 60,190.44
Genteng Keramik setara
72 KIA (S-1 Standard buah
Unglassed) 10,000.00
Genteng Keramik setara
73 buah
KIA (S-1 Standard Natural)
10,000.00
Genteng Keramik setara
74 KIA (S-1 Standard buah
Standard) 11,299.29
Genteng Keramik setara
75 buah
KIA (S-1 Standard Spesial)
14,124.11
Genteng Keramik setara
76 KIA (S-1 Standard buah
Premium) 19,339.17
Genteng Keramik setara
77 buah
KIA (S-1 Standard Exlusive)
21,077.52

Bahan 1 - Hal 24
Harga Satuan Tertinggi - 2015

Genteng Keramik setara


78 buah
KIA (S-2 Nok Unglassed) 21,620.75
Genteng Keramik setara
79 buah
KIA (S-2 Nok Natural) 22,163.99
Genteng Keramik setara
80 buah
KIA (S-2 Nok Standard) 26,075.28
Genteng Keramik setara
81 buah
KIA (S-2 Nok Spesial) 28,791.46
Genteng Keramik setara
82 buah
KIA (S-2 Nok Premium) 31,398.98
Genteng Keramik setara
83 buah
KIA (S-2 Nok Exlusive) 36,505.39
Genteng Keramik setara
84 KIA (S-3 List Plang Kiri buah
Unglassed) 31,181.69
Genteng Keramik setara
85 KIA (S-3 List Plang Kiri buah
Natural) 26,401.22
Genteng Keramik setara
86 KIA (S-3 List Plang Kiri buah
Standard) 27,053.10
Genteng Keramik setara
87 KIA (S-3 List Plang Kiri buah
Spesial) 28,030.93
Genteng Keramik setara
88 KIA (S-3 List Plang Kiri buah
Premium) 30,964.40
Genteng Keramik setara
89 KIA (S-3 List Plang Kiri buah
Exlusive) 35,527.57
Genteng Keramik Setara.
90 M-Class (M-1 Standard bh
Natural) 10,104.17
Genteng Keramik Setara M-
91 Class (M-1 Standard bh
Standard) 10,104.17
Genteng Keramik Setara M-
92 Class (M-1 Standard bh
Special) 12,820.35
Genteng Keramik Setara M-
93 Class (M-1 Standard bh
Premium) 16,405.70
Genteng Keramik Setara M-
94 bh
Class (M-2 NOK Natural)
23,141.81
Genteng Keramik Setara M-
95 Class (M-2 bh
NOK Standard) 25,966.63

Bahan 1 - Hal 25
Harga Satuan Tertinggi - 2015

Genteng Keramik Setara M-


96 bh
Class (M-2 NOK Special)
29,443.34
Genteng Keramik Setara M-
97 bh
Class (M-2 NOK Premium)
34,875.69
Genteng Keraxnik Setara
98 M-Class (M-3 List Plang Kiri bh
Natural) 30,529.81
Genteng Keramik Setara.
99 M-Class (M-3 List Plang Kiri bh
Standard) 21,403.46
Genteng Keramik Setara M-
100 Class (M-3 List Plang Kiri bh
Special) 23,902.34
Genteng Keramik Setara M-
101 Class (M-3 List Plang Kiri bh
Premium) 27,704.99
Genteng Beton Garuda
102 bh
Natural (9.5 Bh/m2) 24,336.93
Genteng Beton Garuda Cat
103 bh
Minyak (9.5 Bh/m2) 48,891.15
Genteng Beton Garuda Cat
104 bh
Air (9.5 Bh/m2) 37,157.27
Genteng Beton Flat Natural
105 bh
(10 Bh/m2) 32,702.75
Genteng Beton Flat Cat
106 bh
Minyak (10 Bh/m2) 22,163.99
Genteng Beton Flat Cat Air
107 bh
(10 Bh/m2) 18,144.05
Genteng Beton Nok Bulat
108 Besar (NBB, P-D 91 cm -19 bh
cm) 73,336.73
Genteng Beton Nok Atas
109 Besar (NAB, P-L-T 91 cm - bh
8 cm - 10 cm) 179,376.20
Genteng Keramik Setara
110 SAHARA (S-1 Standard bh
Unglazed) 62,472.03
Genteng Keramik Setara
111 SAHARA (S-1 Standard bh
Natural) 11,299.29
Genteng Keramik Setara
112 SAHARA (S-1 Standard bh
Standard) 12,928.99
Genteng Keramik Setara
113 SAHARA (S-1 Standard bh
Khusus) 16,731.64

Bahan 1 - Hal 26
Harga Satuan Tertinggi - 2015

Genteng Keramik Setara


114 SAHARA (S-1 Standard bh
Premium) 21,403.46
Genteng Keramik Setara
115 SAHARA (S-2 NOK bh
Unglazed) 24,988.81
Genteng Keramik Setara
116 bh
SAHARA (S-2 NOK Natural)
26,401.22
Genteng Keramik Setara
117 SAHARA (S-2 NOK bh
Standard) 32,702.75
Genteng Keramik Setara
118 SAHARA (S-2 NOK bh
Khusus) 38,786.98
Genteng Keramik Setara
119 SAHARA (S-3 List Plang bh
Kiri Unglazed) 33,897.86
Genteng Keramik Setara
120 SAHARA (S-3 List Plang bh
Kiri Natural) 21,946.69
Genteng Keramik Setara
121 SAHARA (S-3 List Plang bh
Kiri Standard) 31,507.63
Genteng Kerarnik Setara
122 SAHARA (S-3 List Plang bh
Kiri Khusus) 36,396.75
Genteng Keramik Setara
123 SAHARA (S-3 List Plang bh
Kiri Premium) 39,004.27
Genteng Keramik Setara
GRAND (Type Elabana,
124 bh
P=420 mm, L=335 mm,
Isi=9/m2, Berat=4.20 Kg) 59,755.85
Genteng Keramik Setara
GRAND (Type Garuda
125 Besar, P=420 mm, L=335 bh
mm, Isi=9/m2, Berat=4.20
Kg) 36,939.98
Genteng Keramik Setara
GRAND (Type Centurion,
126 bh
P=420 mm, L=335 mm,
Isi=9/m2, Berat=4.20 Kg) 8,365.82

Genteng Keramik Setara


GRAND (Type Royal,
127 bh
P=368 mm, L=300 mm,
Isi=13/m2, Berat = 3.20 Kg)
6,627.47

Bahan 1 - Hal 27
Harga Satuan Tertinggi - 2015

Genteng Keramik Setara


GRAND (Type Garuda
128 Kecil, P=392 mm, L=292 bh
mm, Isi=9/m2, Berat=3.20
Kg) 5,541.00
Nok Bulat Standard (NBS,
129 bh
P-D 37.5 cm - 12 cm)
Nok Atas Standard (NAS, 90,177.01
130 P-L-T 91 cm - 5 cm - 6.5 bh 83,440.90
cm)
Nok Pinggir (NPG, P-L-T
131 bh
91.4 cm - 10 cm - 7 cm) 60,190.44
132 Asbes Motif Genteng lbr 95,609.36
Nok Stel Gelombang 1000
133 Ibr 68,121.67
mm
134 Nok Stel Rata lbr 68,990.85
135 Nok Paten Gelombang lbr 59,103.97
136 Nok Paten Rata Ibr 37,591.86
137 Hipcapping Besar lbr 450,885.05
138 Ujung Nok lbr 637,214.66
139 Shednok Natural 6 lbr 58,017.50
140 Penutup Atas lbr 129,289.93
141 Penutup Bawah Type B lbr 128,746.70
142 Penutup Bawah Type C lbr 123,857.58
143 Lisplang Simetris lbr 923,499.50
144 Lisplang Siku-siku lbr 2,645,554.45
145 Lisplang Kalsiplang (3000 x 200 x 8.0 mm) lbr 50,372.70
146 Lisplang Kalsiplang (2400 x 200 x 8.0 mm) lbr 40,001.85
147 Lisplang Kalsiplang (3000 x 200 x 12.0 mm) lbr 75,559.05
148 Lisplang Kalsiplang (2400 x 200 x 12.0 mm) lbr 60,743.55
149 Lisplang Kalsiplang (3000 x 300 x 8.0 mm) lbr 75,559.05
150 Lisplang Kalsiplang (2400 x 300 x 8.0 mm) lbr 60,002.78
151 Lisplang Kalsiplang (3000 x 300 x 12.0 mm) lbr
113,338.58
152 Lisplang Kalsiplang (2400 x 300 x 12.0 mm) lbr
91,856.10
120 x 240 (t = 12 mm Ex.
153 Papan Gypsum lbr
DN) 78,522.15
120 x 240 (t = 12 mm Ex.
154 Papan Gypsum lbr
LN) 80,003.70
List Plafond Gypsum Polos (Setara Jaya Board
155 Btg
Siku Panjang 2 m) 54,944.34

Bahan 1 - Hal 28
Harga Satuan Tertinggi - 2015

List Plafond Gypsum Polos (Setara Jaya Board


156 Btg
Siku Panjang 5 m) 29,567.51
List Plafond Gypsum Polos (Setara Jaya Board
157 Btg
Siku Panjang 10 m) 32,012.06
List Plafond Gypsum Polos (Setara Jaya Board
158 Btg
Siku Panjang 15 m) 32,244.88
(Setara Jaya Board
159 List Plafond Gypsum Polos Big
Panjang 2 m) 16,297.05
(Setara Jaya Board
160 List Plafond Gypsum Polos Btg
Panjang 5 m) 17,778.60
(Setara Jaya Board
161 List Plafond Gypsum Polos Btg
Panjang 10 m) 20,741.70
(Setara Jaya Board
162 List Plafond Gypsum Polos Btg
Panjang 15 m) 26,667.90
List Plafond Gypsum (Setara Jaya Board
163 Btg
Ombak Panjang 2 m) 217,837.24
List Plafond Gypsum (Setara Jaya Board
164 Btg
Ombak Panjang 5 m) 96,369.89
List Plafond Gypsum (Setara Jaya Board
165 Btg 97,130.42
Ombak
List Plafond Gypsum Panjang 10 m)
(Setara Jaya Board
166 Btg 103,323.30
Ombak Pandang 15 m)
167 Genteng Plentong buah 1,550.00
168 Jabesmen gelombang 150x105 mm buah 40,000.00
169 Jabesmen gelombang 180x105 mm buah 46,000.00
170 Jabesmen gelombang 210x105 mm buah 52,000.00
171 Jabesmen gelombang 240x105 mm buah 60,000.00
172 Jabesmen gelombang 270x105 mm buah 68,000.00
173 Jabesmen gelombang 300x105 mm buah 76,000.00

N. BAHAN MEKANIKAL

Jockey Pump kap. 80


1 unit 84,287,552.44
gln/menit 100 ml (18.6 kW)

Electrical Pump kap. 750


2 unit 353,531,037.89
gln/menit 120 ml (90 kW)

Diesel Pump kap. 750


3 unit 883,828,303.74
gln/menit 120 ml (105 kW)

Presure Tank kap. 500 liter


4 unit
lengkap 51,681,014.48
Hydran Box dlm Gedung
5 unit
( Lengkap ) 9,163,471.41
Fire House 1.5 x 30 m +
6 unit
nose 7,371,049.89
7 Exhose Fan H 360 W 60 x 60 cm unit 7,610,701.19
H 380 W CFM 55 x 55
8 Exhose Fan unit
cm 8,579,232.75

Bahan 1 - Hal 29
Harga Satuan Tertinggi - 2015

9 Exhose Fan H 100 W 40 x 40 cm unit 1,351,406.42


10 AC Split 3 PK Setara TOSHIBA unit 30,941,028.84
11 AC Split 2 PK Setara TOSHIBA unit 17,898,535.00
12 AC Split 1 PK Setara TOSHIBA unit 4,642,190.00
Mesin AC Split DAIKIN
13 1 BTU 19,559,620.64
(Indoor / Outdoor Unit)

O. BAHAN ELEKTRIKAL
Kabel NYA 1 x 1.5 Prima ( 1
1 ROLL
rol = 50 m' ) 158,361.23
Kabel NYA 1 x 2.5 Prima ( 1
2 ROLL
ml = 50 m' ) 241,995.91
Kabel NYM 2 x 1.5 Prima
3 m'
( 1 ml = 50 m' ) 7,574.72
Kabel NYM 3 x 1.5 Prima
4 m'
( 1 rol = 50 m' ) 9,563.76
Kabel NYM 2 x 2.5 Prima
5 m'
( 1 ml = 50 m' ) 12,552.73
Kabel NYM 3 x 2.5 Prima
6 m'
( 1 rol = 50 m' ) 15,488.55
Kabel NYM 4 x 2.5 Prima
7 m'
( 1 ml = 50 m' ) 8,978.19
Kabel NYM 2 x 4 Prima ( 1
8 m'
rol = 50 m' ) 7,553.08
Kabel NYM 3 x 4 Prima ( 1
9 m'
rol = 50 m' ) 18,832.15
Kabel NYM 4 x 4 Prima ( 1
10 m'
rol = 50 m' ) 25,413.99
Kabel NYM 2 x 6 Supreme (
11 m'
1 rol = 50 m' ) 13,538.55
Kabel NYM 3 x 6 Supreme (
12 m'
1 rol = 50 m' ) 17,813.88
Kabel NYM 4 x 6 Supreme (
13 m'
1 ml = 50 m' ) 29,317.76
Kabel NYM 2 x 10 Supreme
14 m'
(1 rol = 50 m') 22,374.23
Kabel NYM 3 x 10 Supreme
15 m'
(1 rol = 50 m') 29,642.29
Kabel NYM 4 x 10 Supreme
16 m'
(1 rol = 50 m') 32,635.02
Kabel NYM 4 x 16 Supreme
17 m'
(1 rol = 50 m') 44,605.94
Kabel NYY 2 x 4 Supreme (
18 m'
1 rol = 50 m' ) 13,538.55
Kabel NYY 3 x 4 Supreme (
19 m'
1 rol = 50 m' ) 20,624.12
Kabel NYY 4 x 4 Supreme (
20 m'
1 ml = 50 m' ) 30,438.09

Bahan 1 - Hal 30
Harga Satuan Tertinggi - 2015

Kabel NYY 2 x 6 Supreme (


21 m'
1 rol = 50 m' ) 13,396.03
Kabel NYY 3 x 6 Supreme (
22 m'
1 rol = 50 m' ) 26,580.42
Kabel NYY 4 x 6 Supreme (
23 m'
1 rol = 50 m' ) 27,647.13
Kabel NYY 2 x 10 Supreme
24 m'
( 1 rol = 50 m') 23,799.34
Kabel NYY 3 x 10 Supreme
25 m'
( 1 rol = 50 m') 32,492.51
Kabel NYY 4 x 10 Supreme
26 m'
( 1 rol = 50 m') 50,119.66
Kabel NYY 4 x 16 Supreme
27 m'
( 1 rol = 50 m') 63,559.91
28 NSFB FUJI EA - 100 A bh 1,254,096.80
29 NSFB FUJI EA - 150 A bh 2,565,198.00
Rumah Panel 30 x 60 cm
30 unt 213,766.50
( Kosong )
31 Skring Kas 2 grop Biasa unt 267,337.47
32 Skring Kas 3 grop Biasa unt 327,380.22
33 Skring Kas 5 grop Biasa unt 672,134.55
34 MCB 1 PAS bh 71,255.50
35 MCB 3 PAS bh 86,931.71
36 Tahanan 50 A Merk Fuji bh 766,709.18
Saklar Broko Tunggal
37 bh
Standard ( 1 Phase ) 26,649.09
Saidar Broko Seri Standard
38 bh
( 1 Phase ) 29,508.71
Stop Kontak Broko
39 bh
Standard ( 1 Phase ) 29,217.11
Stop Kontak Broko 3 Phase
40 bh
(Out Bow) 121,134.35
Stop Kontak Broko 3 Phase
41 bh
( In Bow) 205,215.84
Stop Kontak Handle 3
42 bh
Phase 119,709.24
Instalasi Titik Lampu / Stop
43 ttk
Kontak (Upah dan Alat)
179,600.00
Lampu pijar 25 Watt s/d 100
44 bh
Watt 13,519.73
Lampu Neon Phillips 20
45 bh
Watt 45,246.07
Lampu Neon Phillips 40
46 bh
Watt 62,272.13
47 Trapo TL 20 W (Phillips) bh 67,692.73
48 Trapo TL 40 W (Phillips) bh 71,255.50
49 Trapo TL 20 W (Sinar) bh 35,627.75
50 Trapo TL 40 W (sinar) bh 42,753.30

Bahan 1 - Hal 31
Harga Satuan Tertinggi - 2015

51 Stater Neon Phillips bh 7,125.55


52 Stater Neon Biasa bh 4,987.89
Rumah TL In Bow / Out
53 Bow 2 x 20 W (kosongan bh 178,138.75
Sonora)
54 Down Light + SL 25 W bh 413,281.90
55 Lampu SL Philip 25 W bh 178,138.75
Lampu Sirkel TL 20 W
56 bh
Lengkap 149,636.55
57 Lampu Mercuri 80 W bh 171,746.92
Lampu Taman + Tiang +
58 bh
Lampu 1 Buah 541,541.80
59 Lampu Baret 30 cm + Neon bh
285,022.00
Lampu Neon Arcrilik 2 x 40
60 bh
W Lengkap 1,054,581.40
61 Jarum Penangkal Petir 16 bh
135,385.45
62 Kawat BC ( Tembaga ) kg 57,004.40
Pentanahan Penangkal
63 ttk
Petir 598,546.20
64 Pentanahan Panel ttk 256,519.80
65 Balk TL 1 x 18 W bh 1,061,372.54
66 Balk TL 1 x 36 W bh 1,116,999.81
67 TKO TL 1 x 18 W bh 43,360.03
68 TKO TL 2 x 18 W bh 58,866.92
69 TKO TL 1 x 36 W bh 91,698.07
70 TKO TL 2 x 36 W bh 115,491.76
71 Kabel NYGBY ml 155,147.92
Panel ACB 4 Pase ACB Jenis Tarik 1000 A Tanpa
72 bh 31,393,254.34
Ml0H1 4P Unit Trip MG
Panel ACB 4 Pase ACB Jenis Tetap 1000 A
73 bh 31,238,580.52
Ml0H1 4P Tanpa Unit Trip MG
Panel ACB 4 Pase ACB Jenis Tetap 1250 A
74 bh 31,038,670.04
Ml0H1 4P Tanpa Unit Trip MG
Panel ACB 4 Pase ACB Jenis Tetap 1250 A
75 bh 32,030,419.61
Ml0H1 4P Tanpa Unit Trip MG
Panel ACB 4 Pase ACB Jenis Tetap 2500 A
76 bh 55,250,752.76
Ml0H1 4P Tanpa Unit Trip MG
Panel ACB 4 Pase ACB Jenis Tetap 2500 A
77 bh 56,244,971.58
Ml0H1 4P Tanpa Unit Trip MG
Panel ACB 4 Pase ACB Jenis Tetap 1000 A
78 bh 31,474,344.51
Ml0H1 4P Tanpa Unit Trip MG
Panel ACB 4 Pase ACB Jenis Tetap 3200 A
79 bh 60,870,271.91
Ml0H1 4P Tanpa Unit Trip MG
125 - 160 A, 36 KA
80 Panel MCCB 3 Pase MCCB bh 4,392,795.75
(NS160N) MG

Bahan 1 - Hal 32
Harga Satuan Tertinggi - 2015

50 - 63 A, 25 KA
81 Panel MCCB 3 Pase MCCB bh
(NS100N) MG 4,334,422.68
40 - 50 A, 25 KA
Panel MCCB 3 Pase MCCB bh
82 .
(NS100N) MG 1,088,149.09
32 - 50 A, 25 KA
83 Panel MCCB 3 Pase MCCB bh
(NS100N) MG 790,160.00
32 - 50 A, 10 KA
84 Panel MCCB 3 Pase MCCB bh
(NC45H) MG 6,026,254.01
20 - 10 A, 10 KA
85 Panel MCCB 3 Pase MCCB bh
(NC45H) MG 3,970,060.15
160 - 200 A, 36 KA
86 Panel MCCB 3 Pase MCCB bh
(NS250N) MG 3,997,616.98
80 - 100 A, 26 KA
87 Panel MCCB 3 Pase MCCB bh
(NS100) MG 2,477,250.37
20 - 25 A, KA (NS100)
88 Panel MCCB 3 Pase MCCB bh
MG 397,549.25
13 - 16 A, KA (NS100)
89 Panel MCCB 3 Pase MCCB bh
MG 405,036.02
90 Panel MCCB 3 Pase MCCB 16 A, 5 KA (NC45a) MG bh
344,628.28
91 Panel MCCB 3 Pase MCCB 10 A, 5 KA (NC45a) MG bh
319,313.53
92 Panel MCCB 3 Pase MCCB 6 A, 5 KA (NC45a) MG bh
159,602.44
25 A, 25 KA (NS100N)
93 Panel MCCB 3 Pase MCCB bh
MG 87,608.99
94 Panel MCCB 3 Pase MCCB 16 A, 5 KA (NS100N) MG bh
3,761,260.37
95 Panel MCCB 3 Pase MCCB 32 A, 25 KA MG bh
3,801,558.53
80 - 100 A, 25 KA
96 Panel MCCB 3 Pase MCCB bh
(NS100) MG 585,212.25
97 Panel MCCB 3 Pase MCCB 50 - 63 A,(NS100) MG bh
549,101.94
350 - 500 A / 70 KA / 3
98 Panel MCCB 3 Pase MCCB bh
Pole NS630 bN/H/L 583,651.68
224 - 320 A / 70 KA / 3
99 Panel MCCB 3 Pase MCCB bh
Pole NS400 bN/H/L 560,944.46
175 -.250 A / 70 KA / 3
100 Panel MCCB 3 Pase MCCB bh
Pole NS250 bN/H/L 564,964.40
160 - 300 A / 70 KA / 3
101 Panel MCCB 3 Pase MCCB bh
Pole NS400 bN/H/L 569,201.63
64 - 80 A / 70 KA / 3 Pole
102 Panel MCCB 3 Pase MCCB bh
NS100 bN/H/L 549,753.82
44 - 63 A / 70 KA / 3 Pole
103 Panel MCCB 3 Pase MCCB bh
NS100 bN/H/L 639,170.30
32 - 40 A / 70 KA / 3 Pole
104 Panel MCCB 3 Pase MCCB bh
NS100 bN/H/L 651,990.65

Bahan 1 - Hal 33
Harga Satuan Tertinggi - 2015

Panel MCCB 3 Pase 400 A / 3 Pole LCI -


105 bh
Contraktor F3304 1,648,718.23
Panel MCCB 3 Pase 250 A / 3 Pole LCI -
106 bh
Contraktor F1504 2,485,082.83
Panel MCCB 3 Pase 200 A / 3 Pole LCI -
107 bh
Contraktor F1154 560,025.90
Panel MCCB 3 Pase 160 A / 3 Pole LCI -
108 bh
Contraktor F1154 571,048.63
109 Panel MCB 3 Pase MCB 16 A, 5 KA (NC45a) MG bh
401,993.90
110 Panel MCB 3 Pase MCB 10 A, 5 KA (NC45a) MG bh
396,452.90
111 Panel MCB 3 Pase MCB 6 A, 5 KA (NC45a) MG bh
260,329.50
112 Panel MCB 3 Pase MCB 10 A, 6 KA, 10 A, 6 K MG bh
260,329.50
113 Panel MCB 3 Pase MCB 50 A, 10 A (NC100H) MG bh
591,209.00
16 A, 6 KA (NC45aD)
114 Panel MCB 3 Pase MCB bh
MG 260,329.50
115 Panel MCB 3 Pase MCB 6 A, 6 KA (NC45aD) MG bh
311,831.00
63 A, 10 KA (NC100H)
116 Panel MCB 3 Pase MCB bh
MG 591,209.00
32 A, 10 KA (NC100H)
117 Panel MCB 3 Pase MCB bh
MG 302,659.50
16 A, 8 KA (NC10014)
118 Panel MCB 3 Pase MCB bh
MG 301,650.64
119 Panel MCB 3 Pase MCB 16 A, 5 KA (NC45N) MG bh
302,038.66
16 A, 10 KA (NC100H)
120 Panel MCB 3 Pase MCB bh
MG 301,340.22
121 Panel MCB 3 Pase MCB 25 A, 8 KA (NC45N) MG bh
285,353.59
40 A, 8 KA L (NC45N)
122 Panel MCB 3 Pase MCB bh
MG 262,149.69
123 Panel MCB 3 Pase MCB 10 A, 8 KA (NC45N) MG bh
283,491.07
20 A, 10 KA (NC45N)
124 Panel MCB 1 Pase MCB bh
MG 130,609.22
125 Panel MCB 1 Pase MCB 10 A, 8 KA (NC45N) MG bh
62,860.05
126 Panel MCB 1 Pase MCB 6 A, 8 KA (NC45N) MG bh
55,029.00
127 Panel MCB 1 Pase MCB 20 A, 8 KA (NC45N) MG bh
55,029.00

Bahan 1 - Hal 34
Harga Satuan Tertinggi - 2015

20 A, 5 KA (NC45Na)
128 Panel MCB 1 Pase MCB bh
MG 62,860.05
10 A, 5 KA (NC45Na)
129 Panel MCB 1 Pase MCB bh
MG 64,955.39
130 Panel MCB 1 Pase MCB 6 A, 5 KA (NC45Na) MG bh
65,809.04
25 A, 5 KA (NC45Na)
131 Panel MCB 1 Pase MCB bh
MG 71,862.23
16 A, 5 KA (NC45Na)
132 Panel MCB 1 Pase MCB bh
MG 65,653.83
133 Panel MCB 1 Pase MCB 16 A, 5 KA (NC45N) MG bh
65,110.60
134 Panel MCB 1 Pase MCB 6 A, 6 KA (NC45aD) MG bh
65,809.04
135 Panel MCB 1 Pase MCB 20 A, 8 KA (NC45N) MG bh
65,809.04
136 Panel MCB 1 Pase MCB 10 A, 8 KA (NC45N) MG bh
65,809.04
137 Panel MCB 1 Pase MCB 16 A, 5 KA (NC45N) MG bh
65,809.04
138 Panel MCB 1 Pase MCB 6 A, 5 KA (NC45N) MG bh
158,857.44
139 Panel MCB 1 Pase MCB 25 A, 5 KA (NC45N) MG bh
156,529.29
50 A, 10 KA (NC100H)
140 Panel MCB 1 Pase MCB bh 656,383.09
MG

P. BAHAN ALAT PENGANTUNG DAN KUNCI


Kunci Silinder ALFA untuk
1 bh 451,131.98
Pintu Alumunium
2 Tarikan Pintu Alumunium bh 460,973.70
3 Kunci 2 Slaag ROYAL bh 184,666.98
4 Rel Henderson Lengkap bh 1,198,722.11
5 Rel maraton I Pintu unt 257,789.70
Kunci 2 Slaag Silinder SEIS
6 Tipe 210 s/d type 226 bh
Asli 408,366.92
7 Kunci 2 Slaag Ancor Asli bh 198,433.63
8 Kunci 2 Slaag ISO bh 260,654.03
Kunci KM Bulat Kualitas
9 bh
Biasa 94,687.51
10 Kunci kM Bulat ALFA bh 78,769.08
Kunci 2 Slaag Silinder
11 bh
Utama Standard 771,936.94
12 Kunci Gembok Besar bh 93,586.93
Kunci 2 Slaag Kuda
13 bh 118,869.70
Terbang
14 Kunci Lemari bh 113,613.72
15 Espangolet ps 60,602.45

Bahan 1 - Hal 35
Harga Satuan Tertinggi - 2015

16 Espangolet St. Steel bh 533,358.00


17 Casement ps 75,000.00
18 Grendel 15 cm bh 42,475.80
19 Grendel 5 cm bh 13,075.27
20 Grendel 7 cm bh 88,469.70
Hak Angin Kait Jendela
21 ps
Biasa 22,787.65
22 Hak Angin Jendela Antik ps 32,899.82
Hak Angin Sendok
23 bh
Stainless / Kuningan 43,693.97
24 Sloot Pintu Berikut Rantai bh 34,549.75
25 Sloot Jendela Tunggal bh 30,944.64
26 Sloot Handle Jendela bh 24,554.22
Engsel Pintu Union
27 ps
Standard 15,000.00
28 Engsel Jendela Unilon ps 35,000.00
29 Engsel Patrun ps 14,251.10
30 Engsel Harmonika ps 20,142.03
31 Floor Hinge ps 3,259,410.00
Door Closer Kelas Standard
32 unt
( Kelas Sedang )
646,238.00
Door Closer Kelas Standard
33 unt
( Kelas Balk) 675,869.00
34 Door Closer Kelas Rendah unt
265,268.00
35 Door Holder unt 88,300.00
36 Door Stoper unt 88,300.00
37 Tarikan Almari Rata-rata bh 21,400.17
38 Rambuncis bh 25,000.00
Seng BJLS 30 Lebar 60 cm
39 ml
( 1 rol 50 m' ) 123,205.70
Seng BJLS 30 Lebar 90 cm
40 ml
( 1 rol 50 m' ) 70,077.32
41 Seng BJLS 30 / 3 x 0.3 mm lbr
103,214.65
42 Seng Plat lbr 69,751.37
43 Waterstop Lebar 200 mm ml 71,055.14
44 Kunci Tanam biasa buah 132,400.00
45 Kunci Tanam antik buah 150,000.00
46 Kunci Tanam Kamar Mandi buah 63,500.00

Q. BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN


1 Aspal Bitumen kg 47,974.00
Aspal ( ESO ) 1 Drum 155
2 kg
kg 13,404.50

Bahan 1 - Hal 36
Harga Satuan Tertinggi - 2015

3 Aspal Emulsi kg 16,106.55


4 Aspal Curah kg 18,173.68
Aspal Concrete / Laston
5 ton
(AC -WC) 1,624,815.89
Aspal Threated Base
6 ton
( ATB ) 1,580,320.00
Lataston / Hot Rolls Sheet
7 ton
( HRS ) 1,855,465.00
8 Asphal RC 70 (Cilacap) Kg 15,521.00
Asphal Concrete (ATB) AC
9 Base Ton 1,552,100.00
Asphal Concrete (ATB) AC
10 -BC
Asphal Concrete Wearing Ton 1,693,200.00
11 Course / AC-WC
Lapis Asphal Resap Ton 1,664,980.00
12 Pengikat Ton 22,576.00
13 Lapis Asphal Perekat Ton 19,754.00
14 Beton Mortar M3 1,312,230.00
15 Beton BO M3 1,058,250.00
16 Beton K 100 M3 1,086,470.00
17 Beton K 125 M3 1,087,175.50
18 Beton K 150 M3 1,107,635.00
19 Beton K 175 M3 1,243,443.75
20 Beton K 200 M3 1,299,389.90
21 Beton K 225 M3 1,325,493.40
22 Beton K 250 M3 1,342,284.30
23 Beton K 275 M3 1,359,039.93
24 Beton K 300 M3 1,408,530.75
25 Beton K 325 M3 1,426,450.45
26 Beton K 350 M3 1,451,742.63
27 Beton K 375 M3 1,484,089.80
28 Beton K 400 M3 1,505,572.28
29 Beton K 425 M3 1,529,538.11
30 Beton K 450 M3 1,589,511.96
31 Beton K 475 M3 1,411,000.00
32 Beton K 500 M3 1,672,035.00
33 Beton K 550 M3 1,552,100.00
34 Beton K 600 M3 1,693,200.00
35 Beton K 650 M3 1,834,300.00

R. BAHAN PENGISAP AIR SUMUR DALAM

1 Pompa Kodok unit 270,912.00

Bahan 1 - Hal 37
Harga Satuan Tertinggi - 2015

2 Pompa Dragon Tegal unit 499,494.00


3 Pompa Dragon Asli unit 1,164,187.88
Mesin Pompa Air 100 W -
4 unit
Sanyo 1,530,935.00
Mesin Pompa Air 150 W -
5 unit
Sanyo 2,661,851.50
Pompa Zet Pump 250 W -
6 unit
Sanyo 8,154,451.20
Pompa Zet Pump 450 W -
7 unit
Sanyo 12,952,133.40
Pompa. Submersible kap.
8 unit
150 liter / menit 3 KW
51,150,866.50
Gear Pump Kap. 60 liter /
9 unit 23,210,950.00
menit
Deep Well dengan
10 kelengkapannya kap. 150 unit 202,644,236.06
liter / menit
11 Hand Oil Pump unit 6,999,971.00

S. BAHAN PENAMPUNG AIR


Tangki Air Fiber Glass 0.5
1 bh
m3 ( Excel ) 1,058,250.00
Tangki Air Fiber Glass 1 m3
2 bh
( Excel ) 1,693,200.00
Tangki Air Fiber Glass 2 m3
3 bh
( Excel ) 3,245,300.00
Tangki SST Tanpa Kaki GS-
4 700 TK (Volume 600 Liter, unit 1,515,414.00
D-T 87 - 115)
Tangki SST Tanpa Kaki GS-
5 1000 TK (Volume 800 Liter, unit 1,515,414.00
D-T 87 - 140)
Tangki SST Tanpa Kaki GS-
6 1500 TK (Volume 1000 unit 1,752,462.00
Liter, D-T 99 - 145)
Tangki SST Tanpa Kaki GS-
7 1800 TK (Volume 1500 unit 1,752,462.00
Liter, D-T 99 - 205)
Tangki SST Tanpa Kaki GS-
8 2000 TK (Volume 1000 unit 1,752,462.00
Liter, D-T 99 - 145)
Tangki SST Tanpa Kaki GS-
9 2500 TK (Volume 1500 unit 1,752,462.00
Liter, D-T 99 - 205)

Bahan 1 - Hal 38
Harga Satuan Tertinggi - 2015

Tangki SST Tanpa Kaki GS-


10 3000 TK (Volume 2100 unit 3,555,720.00
Liter, D-T 145 - 150)

Tangki SST Tanpa Kaki GS-


11 4000 TK (Volume 3100 unit 5,308,182.00
Liter, D-T 145 - 210)

Tangki SST Tanpa Kaki GS-


12 5000 TK (Volume 4000 unit 17,483,475.24
Liter, D-T 145 - 265)

Tangki SST Tanpa Kaki GS-


13 6000 TK (Volume 5000 unit 20,673,139.51
Liter, D-T 145 - 325)

Tangki SST Pakai Kaki 700


14 TK (Volume 660 Liter, D-T unit 2,879,145.50
87 - 155)
Tangki SST Pakai Kaki
15 1000 TK (Volume 800 Liter, unit 3,498,433.40
D-T 87 - 175)
Tangki SST Pakai Kaki
16 1500 TK (Volume 1100 unit 4,128,586.00
Liter, D-T 99 - 180)
Tangki SST Pakai Kaki
17 1800 TK (Volume 1500 unit 5,627,914.60
Liter, D-T 99 - 240)
Tangki SST Pakai Kaki
18 2000 TK (Volume 1100 unit 4,878,250.30
Liter, D-T 99 - 180)
Tangki SST Pakai Kaki
19 2500 TK (Volume 1500 unit 6,627,467.00
Liter, D-T 99 - 240)
Tangki SST Pakai Kaki
20 3000 TK (Volume 2300 unit 9,813,787.20
Liter, D-T 145 - 195)
Tangki SST Pakai Kaki
21 4000 TK (Volume 3200 unit 13,867,308.00
Liter, D-T 145 - 250)
Tangki Silinder Excel GE -
22 unit 906,433.46
250 (Volume 250 Liter)
Tangki Silinder Excel GE -
23 unit 906,433.46
300 (Volume 300 Liter)
Tangki Silinder Excel GE -
24 unit 1,417,067.30
550 (Volume 550 Liter)
Tangki Silinder Excel GE -
25 unit 1,414,245.30
600 (Volume 600 Liter)

Bahan 1 - Hal 39
Harga Satuan Tertinggi - 2015

Tangki Silinder Excel GE -


26 unit 1,509,064.50
700 (Volume 700 Liter)
Tangki Silinder Excel GE -
27 unit 1,889,329.00
800 (Volume 800 Liter)
Tangki Silinder Excel GE -
28 1100 VB (Volume 1050 unit 2,278,059.50
Liter)
Tangki Silinder Excel GE -
29 1200 VB (Volume 1050 unit 2,278,059.50
Liter)
Tangki Silinder Excel GE -
30 unit 2,458,526.40
1100 (Volume 1150 Liter)
Tangki Silinder Excel GE -
31 1100 GT (Volume 1150 unit 2,458,526.40
Liter)
Tangki Silinder Excel GE -
32 unit 3,336,450.60
1600 (Volume 1600 Liter)
Tangki Silinder Excel GE -
33 unit 4,364,349.99
2000 (Volume 2000 Liter)
Tangki Silinder Excel GE -
34 unit 4,801,350.80
2250 (Volume 2250 Liter)
Tangki Silinder Excel GE -
35 unit 6,422,872.00
3100 (Volume 3100 Liter)
Tangki Silinder Excel GE
36 unit 83,021,829.00
-3250 (Volume 3250 Liter)
Tangki Silinder Excel GE -
37 unit 10,246,569.12
5200 (Volume 5200 Liter)

Tangki Sunder Excel GE -


38 unit 24,224,824.05
11000 (Volume 11000 Liter)

Tangki Silinder Dapat


39 Disusun Excel GE - 1000 unit 2,669,456.79
SN (Volume 1000 Liter)
Tangki Silinder Dapat
40 Disusun Excel GE - 2000 unit 4,448,883.00
SN (Volume 2000 Liter)
Tangki Silinder Dapat
41 Disusun Excel GE - 3000 unit 7,519,219.00
SN (Volume 3000 Liter)

Tangki Tanam / Pendam


(Dengan Pelindung Beton)
42 unit 1,938,714.00
Excel Lumba-Lumba GE -
550 K (Volume 550 Liter)

Bahan 1 - Hal 40
Harga Satuan Tertinggi - 2015

Tangki Tanam / Pendam


(Dengan Pelindung Beton)
43 unit 3,622,037.00
Excel Lumba-Lumba GE -
1100 K (Volume 1100 Liter)

Tangki Tanam / Pendam


(Dengan Pelindung Beton)
44 unit 6,990,094.00
Excel Lumba-Lumba GE -
2100 K (Volume 2100 Liter)

Tangki Tanam / Pendam


(Dengan Pelindung Beton)
45 unit 8,985,248.00
Excel Lumba-Lumba GE -
2500 K (Volume 2500 Liter)

Tangki Tanam / Pendam


46 (Langsung Pendam) GE - unit 1,938,714.00
550 ST (Volume 550 Liter)

Tangki Tanam / Pendam


(Langsung Pendam) GE -
47 unit 3,622,037.00
1100 ST (Volume 1100
Liter)
Tangki Tanam / Pendam
(Langsung Pendam) GE -
48 unit 6,990,094.00
2100 ST (Volume 2100
Liter)
Tangki Tanam / Pendam
(Langsung
49 Pendam) GE - 2500 ST unit 8,985,248.00
(Volume 2500 .
Liter)

Tangki Horisontal GE - 5000


50 unit 16,600,415.00
H (Volume 550 Liter)
51 Bak KM Fiber 60 x 60 bh 352,750.00
52 Bak Taraso WC 40 x 40 bh 70,550.00
53 Bak KM Taraso 60 x 60 bh 203,184.00

T. ALAT TUKANG

1 Palu 0.5 kg bh 90,304.00


2 Cangkul bh 97,359.00
3 Singkup bh 90,304.00
4 Sekrop bh 97,359.00
5 Pengki bh 21,165.00
6 Linggis bh 97,359.00

Bahan 1 - Hal 41
Harga Satuan Tertinggi - 2015

Rool Meter 30 meter


7 bh
( Bahan Plastik ) 128,401.00
Rool Meter 5 meter ( Bahan
8 bh
Besi ) 36,686.00
Selang Plastik untuk Water
9 m
Pas dia. 0.5cm 2,822.00
Water Pas Alumunium 60
10 bh 60,673.00
cm

U. BAHAN BAKAR DAN PELUMAS


1 Minyak Tanah lt 28,220.00
2 Kayu Bakar dari Kayu Karet m3
98,770.00
3 Bahan Bakar Residu lt 8,466.00
4 Minyak Solar lt 8,500.00
5 Bensin Premium lt 9,000.00
6 Plus Oil lt 56,440.00
7 Oil Mesran 40 SAE lt 56,440.00
8 Elpiji / botol 15 kg 173,553.00
15.1
9 Asitilin / Botol
kg btl 148,155.00
10 Angin ( 02 ) / botol btl 98,770.00
11 Karbit kg 17,637.50
12 Minyak Bekisting ltr 48,456.56
13 Rapidrant Gln 27,704.99
14 Soda Api kg 41,285.86
15 Sabun kg 10,104.17
16 Arang Kayu kg 10,973.35
17 Kawat Las bh 35,275.00

V. BAHAN PAGAR
1 Panel Beton Pracetak lbr 183,430.00
2 Kolom Beton Pracetak btg 406,368.00

W. BAHAN PENANGKAL PETIR


EF Lighting Terminal Radius
1 unit
> 110 m2 714,354.03
2 Counecting Sleeve bh 214,795.12
3 EF Coaxcial Cable ml 695,340.80

Grounding Terdiri Dan Earth


Steel Coppir Rod 5/8",
4 Earth Road Camping, Earth unit
Road Clomp, Driving TIP &
Driving Stud
46,935,504.00

Bahan 1 - Hal 42
Harga Satuan Tertinggi - 2015

Indelek Prevectron 2 Type


5 unit
S 4.50 3,969,309.50
Grounding System Max. 2
6 unit
OHM + Box 209,471.42
7 Biaya Instalasi unit 7,212,284.17

X. FIRE ALARM
1 Alarm Bell unit 289,109.67
Manual Break Glass Push
2 unit
Button 573,982.10
3 Sirine unit 473,483.63
4 Smoke Detector unit 310,839.07
5 Heat Detector unit 170,249.85

Y. BIDANG PERTAMANAN
1 Aglonema batang 63,914.86
2 Bambu krisik/jepang batang 63,914.86
3 Furadan kg 28,356.87
4 Kompos/pupuk kandang karung 32,050.87
5 M atoa (2 m) batang 44,762.56
Palm (botol, ekor tupai,
6 batang
putri, dll) tinggi 2 m 135,156.87
7 Philo batang 96,695.83
Pohon pelindung (angsana,
8 mahoni, kamboja dll) tinggi batang
2m 29,117.40
Pohon perdu (kaca piring,
9 batang
puring, mawar, melati, dll) 16,948.93
10 Rumput gajah mini m2 21,294.81

Z. BIDANG PENGAIRAN
1 Batu Belah 10 - 15 cm M3 216,997.69
2 Batu Pecah 5 - 7 cm M3 282,200.00
3 Batu Pecah 0,5 - 1 cm M3 292,570.85
4 Batu Pecah tersaring A M3 241,097.57
5 Batu Pecah tersaring B M3 233,294.74
6 Timbunan Pilthan M3 198,132.62
7 Makadam M3 114,079.35
8 Kayu Damar Laut M3 7,231,248.01
9 Kayu Klas I M3 5,974,794.84
10 Kayu Klas III M3 2,671,333.42
11 Kayu Kano 4/6 BTG 72,497.18
12 Papas 2/20 x 4 LBR 91,461.02
13 Balok Kayu 6 - 8 - 10 /4 m BTG 399,327.11

Bahan 1 - Hal 43
Harga Satuan Tertinggi - 2015

14 Batang Kelapa 13TG 576,125.41


15 Lempengen rumput M2 48,002.22
16 Triplek tb. 3 mm LBR 67,492.83
17 Triplek tb. 4 mm LBR 84,895.17
18 Triplek tb. 6 mm LBR 64,906.00
19 Triplek tb. 9 mm LBR 125,579.00
20 Multiplek 12 mm LBR 177,687.23
21 Seng gelombang BJLS 30 LBR 33,864.00
22 Seng Plat 3 x 6 BWG 30 M2 49,385.00
23 Conblock M2 53,928.42
24 Batako PSPM BH 5,432.35
Pipa Beton Tidak Bertulang
25 M'
dia 0,50 m 151,710.72
Pipa Beton Tidak Bertulang
26 M'
dia 0,60 m 183,712.20
Pipa Beton Tidak Bertulang
27 M'
dia 0,80 m 261,246.65
Pipa Beton Tidak Bertulang
28 M'
dia 1,00 m 339,077.41
Pipa Beton Bertulang dia
29 M'
0,50 m 160,698.79
Pipa Beton Bertulang dia
30 M'
0,60 m 205,441.60
Pipa Beton Bertulang dia
31 M'
0,80 m 399,919.73
Pipa Beton Bertulang dia
32 M'
1,00 m 265,493.76
33 Besi Beton U24 dia. 14 mm BTG
125,536.67
34 Besi Beton U24 dia. 22 mm BTG
287,321.93
35 Besi Beton U24 dia. 25 mm BTG
366,634.24
36 Besi Beton U32 dia. 10 mm BTG
228,158.70
37 Besi Beton U32 dia. 12 mm BTG
130,376.40
38 Besi Beton U32 dia. 16 mm BIG
167,711.46
39 Besi Beton U32 dia. 19 mm BIG
266,185.15
40 Besi Beton U32 dia. 22 mm BIG
336,805.70
41 Besi Beton U32 dia. 25 mm BTG
380,264.50
42 Besi Beton Ulir 10 BIG 103,412.19
43 Besi Beton Ulir 12 BIG 135,216.13

Bahan 1 - Hal 44
Harga Satuan Tertinggi - 2015

44 Besi Beton Ulir 16 BTG 201,490.80


45 Besi Beton Ulir 19 BIG 270,432.26
46 Besi Beton Ulir 22 BIG 366,140.39
47 Besi Beton Ulir 25 BTG 475,182.47
48 Baja U 24 KG 77,336.91
49 Baja U 32 KG 36,544.90
50 Baja U 36 KG 82,966.80
51 Baja U 42 KG 115,363.36
52 Wermes 06 M2 244,455.75
53 Wermes 08 M2 461,749.75
54 Wermes 10 M2 597,558.50
55 Besi Pofil 4x4 KG 26,075.28
56 Besi Struktur H- Beam KG 29,235.92
Besi C macam-macaw
57 KG
ukuran 16,297.05
Besi L macam-macam
58 KG
ukuran 22,815.87
59 Pipa Galvanis 2,5" BTG 309,643.95
60 Pipa Galvanis 3" BTG 543,235.00
61 Pipa Galvanis 4" BTG 706,205.50
62 Kawat Bronjong 3 mm KG 87,213.91
63 Kawat Bronjong 5 mm KG 125,339.13
64 Stempet / Gemuk KG 54,224.73
65 0li SAE 140 LTR 66,274.67
66 Oli SAE 90 LTR 71,114.40
67 Oli SAE 20 LTR 45,730.51
68 Laston SPC TONNE 1,303,764.00
69 Cat (untuk besi profil) KG 54,817.35
70 Meni KG 30,915.01
71 Glass Bead KG 14,124.11
Cat Marka Jalan (thermo
72 5 KG
pastic) 119,511.70
73 Kapur Hidrasi M3 9,235.00
74 Pipa PVC dia 5" BTG 554,099.70
75 Pipa PVC dia 12" BTG 1,035,702.22
Saluran Beton (Uditch) Stu
76 M'
50/50 - 120 1,303,764.00
Saluran Beton (Uditch) Stu
77 M'
60/60 - 120 1,521,058.00
Saluran Beton (Uditch) Stu
78 M'
80/80 - 120 2,814,945.00
Saluran Beton (Uditch) Stu
79 M'
100/100 - 120 4,291,556.50
80 Box Culvert BC 50-50-100 M'
1,097,758.00
81 Box Culvert BC 60-60-100 M'
1,207,533.80

Bahan 1 - Hal 45
Harga Satuan Tertinggi - 2015

82 Box Culvert BC 80-80-100 M'


2,650,704.60
Box Culvert BC 100-100-
83 M'
100 3,230,766.70
Karet Penyambung Piga dia
84 BH
50 cm 83,954.50
Karet Penyambung Piga dia
85 BH
60 cm 105,387.59
Karet Penyambung Pipa dia
86 BH 146,673.45
80 cm
Karet Penyambung Pipa dia
87 BH
100 cm 239,023.40
88 Plat Penjepit 12x4x8 mm LBR 2,879,145.50
Besi UNP 20 (200x80x7,5
89 BTG/ 6 m
mm) 706,205.50
90 Besi Essentaal 1,5-64 mm KG
59,755.85
91 Kuningan 3" KG 157,044.30
92 Bambu BH 31,507.63
93 Baud 1,5 BH 11,161.01
94 Baud Uk 3/4 - 7 cm BH 40,693.24
95 Baud Uk 3/4 - 17 cm BH 34,075.65
96 Cat Glotek Hitam (setara) KG 51,557.94
97 Cat Glotek Biru (setara) KG 53,138.26
98 Amplas LBR 5,531.12
99 Prasasti 40 can x 60 cm BH 651,882.00
100 Prasasti 20 cm x 30 cm BH 543,235.00

Tambahan Harga Bahan

Rangka hollow besi


1 40 x 60 x 2,1mm bt 41,388.86
Alucobond 40 x 60 x 2,1mm

Rangka hollow besi


2 40 x 40 x 1,1mm bt 19,919.09
Alucobond 40 x 40 x 1,1mm

Braket siku besi Alucobond


3 40 x 40 x 4mm 40 x 40 x 4mm bt 7,760.50
4 Brazing Alucobond m2 62,084.00
5 Braket Alucobond m2 2,116.50
Aluminium Composite
6 Panel / ACP bh 260,752.80
Main frame 170cm
7 ( STEGER ) bt 232,815.00
8 Cross Brace bh 70,550.00
9 Join Pin bh 7,055.00

PRODUK GALVALUM TRUSS

Bahan 1 - Hal 46
Harga Satuan Tertinggi - 2015

1 Truss Profil U, T min 0.83 mm m' 190,485.00


2 PROFIL U 75 TEBAL 0.53 mm m' 132,634.00
3 PROFIL U 100 TEBAL 0.53 mm m' 174,964.00
4 PROFIL U 100 TEBAL 0.83 mm m' 261,035.00
5 PROFIL U 60 TEBAL 0.53 MM m' 119,935.00
6 RENG 39 m' 63,495.00
7 RENG 36 m' 56,440.00
8 RENG 29 m' 49,385.00
9 PROFIL C75 TEBAL 0.6 MM m' 84,660.00
10 PROFIL C75 TEBAL 0.65 MM m' 90,304.00
11 PROFIL C75 TEBAL 0.7 MM m' 97,359.00
12 PROFIL C75 TEBAL 0.75 MM m' 100,181.00
13 PROFIL C75 TEBAL 0.95 MM m' 132,634.00
14 RENG m' 42,330.00
15
tiang pancang pipa galvanis bh
Semen Mortar Utama
1 MU-100 Plester Premium40 kg kg 2,116.50
MU-200 Acian Plester &
2 Beton 5 kg kg 6,067.30
MU-200 Acian Plester &
3 Beton 40 kg kg 5,591.09
4 MU-260 Acian Profil 25 kg kg 10,751.82
5 MU-270 Acian Putih 25 kg kg 8,804.64
6 MU-300 Pasangan Bata 40 kg kg 1,781.39

7 MU-301 Pas Bata & Plester 10 kg kg 296.31

8 MU-301 Pas Bata & Plester 40 kg kg 2,028.31


MU-380 Perekat Bata
9 Ringan 5 kg kg 5,926.20
MU-380 Perekat Bata
10 Ringan 40 kg kg 5,291.25
MU-400 Perekat Keramik
11 Dinding 5 kg kg 9,877.00

12 MU-410 Self Leveling Floor 25 kg kg 14,392.20


13 MU-440 Perata Lantai 40 kg kg 1,940.13
MU-445 Perata Lantai
14 Premium 40 kg kg 3,703.88
MU-450 Perekat Keramik
15 Lantai 5 kg kg 9,453.70
MU-450 Perekat Keramik
16 Lantai 40 kg kg 57,851.00
MU-460 Perekat Keramik
17 Daerah Basah 25 kg kg 24,748.94

Bahan 1 - Hal 47
Harga Satuan Tertinggi - 2015

MU-470 White Tile


18 Addesive 25 kg kg 21,729.40
MU-480 Perekat Keramik
19 diatas Keramik 5 kg kg 21,306.10
MU-L500 Perekat Mortar &
20 Beton 2 kg karung 289,960.50

21 MU-600 Pelapis Kedap Air 3 kg karung 162,265.00

22 MU-600 Pelapis Kedap Air 30 kg kg 6,608.18


23 MU-700 Floor Hardener 25 kg kg 8,861.08
24 MU-800 Non-Shrink Grout 40 kg kg 5,538.18
MU-830 Perbaikan
25 Permukaan Beton 40 kg kg 9,277.33
26 MU-840 Finish Coat Repair 25 kg kg 18,343.00

Bahan Pabrikasi

Plavond PVC (setara


1 shunda, Flat Gloss Half m2 99,000.00
Silver
2 screw buah 350.00
3 Plat Bondex m2 140,000.00
Aluminum Composite Panel
4 m2 450,000.00
type PVDF 0.3 warna Silver

Water Proofing Coating


5 setara kg 42,500.00
Fosroc/Sika/Aquaproof
Rangkap baja ringan +
6 m2 190,000.00
Genteng metal pasir
7 Spardek m2 110,700.00
8 Kayu Bekisting m3 1,500,000.00
Concrete Vibrator E20 5.5 25
10 geotekstile m2 50,000.00
Keterangan :
Untuk harga material di atas sudah termasuk keuntungan dan ketentuan pajak yang berlaku.

Bahan 1 - Hal 48
Harga Satuan Tertinggi - 2015

HARGA
KONTRAKTUAL

261,270.17
202,290.37
263,857.00
198,000.00
227,641.34
318,180.50
328,527.83
237,988.67
32,904.52
346,635.67
383,627.38
323,354.17
311,635.81
292,312.17

339,909.90
203,500.00
292,829.53
27,161.75
97,782.30
136,584.80
2,845.52
3,880.25
8,148.53
1,267.55

995.93

1,215.81
10,144.75
14,589.74
10,864.70
13,192.85
27,937.80
22,893.48

Bahan 1 - Hal 49
Harga Satuan Tertinggi - 2015

25,997.68
34,922.25
9,079.79
54,323.50
38,802.50
36,474.35
23,643.66
27,472.17
126,133.99
147,811.66
107,353.58
123,391.95
121,529.43
90,200.00
143,569.25

93,126.00 1862.52

71,500.00

1,784,915.00

1,707,310.00

1,474,495.00

1,376,195.33

1,334,806.00

1,288,243.00

825,000.00

1,239,093.17

1,179,596.00

533,560.24
14,486.27
15,003.63
84,395.44
758.42

Bahan 1 - Hal 50
Harga Satuan Tertinggi - 2015

31,042.00
6,091.99
7,139.66
6,596.43
9,900.00
90,530.00
330,000.00
1,870.00
4,290.00
2,640.00
72,600.00

56,263.63

143,569.25
100,886.50
33,990.00 6180

152,105.80
23,798.86
36,939.98
139,689.00
72,172.65
333,701.50

209,533.50
128,979.51
99,334.40

124,168.00
38,802.50
13,968.90
11,640.75
43,458.80
42,294.73
465,630.00
698,445.00
20,177.30
27,937.80

Bahan 1 - Hal 51
Harga Satuan Tertinggi - 2015

3,104.20
6,208.40
16,297.05

71,396.60
42,682.75
48,115.10

41,906.70
38,802.50
71,396.60
72,948.70
22,505.45
31,042.00
26,385.70
103,214.65
74,500.80
67,516.35
45,010.90
4,656.30
34,922.25
27,161.75
51,219.30
75,664.88
71,784.63

124,168.00
97,006.25
23,281.50
38,802.50
27,937.80
38,802.50
114,730.00
27,500.00

16,500.00
22,000.00
59,083.27

9,754,431.13
6,710,245.67
6,880,976.67

Bahan 1 - Hal 52
Harga Satuan Tertinggi - 2015

8,883,185.67
9,623,020.00
8,844,383.17
9,465,223.17
11,666,618.33
12,419,904.20
4,314,838.00
15,957,657.47
24,991,914.20
13,180,433.20
11,418,023.65
3,880,250.00
3,104,200.00
3,259,410.00
23,436.71
47,804.68
13,037.64
15,676.21
17,073.10
32,852.78
60,531.90

195,305.92

75,276.85
5,432,350.00
5,432,350.00

24,200.00

11,000.00

38,500.00
3,321,494.00
2,444,557.50
931,260.00
23,281.50
23,281.50
294,899.00
676,715.60

Bahan 1 - Hal 53
Harga Satuan Tertinggi - 2015

3,300,000.00
3,300,000.00
2,860,000.00
2,750,000.00
1,650,000.00
1,650,000.00

24,200.00
2,310,000.00

31,042.00
88,469.70
79,933.15
24,833.60

97,006.25

117,959.60
77,605.00
228,934.75
15,521.00

79,933.15
131,928.50
6,208.40

74,242.12
93,384.68
71,396.60
138,136.90
203,325.10
144,345.30
27,937.80

35,698.30

44,234.85
38,802.50

97,006.25

Bahan 1 - Hal 54
Harga Satuan Tertinggi - 2015

147,449.50
214,189.80
280,930.10
382,592.65
441,572.45
194,012.50
259,809.90
102,438.60
182,371.75

147,449.50
137,360.85
145,121.35
82,261.30
143,569.25
204,877.20
249,888.10
189,356.20
346,583.93

1,722.83
1,427.93
3,521.02
1,099.41
4,074.26
1,650.00
4,656.30
1,263.46
5,139.00

3,880.25
5,856.07

1,552.10

1,552.10

3,404.23

3,212.00

3,104.20

Bahan 1 - Hal 55
Harga Satuan Tertinggi - 2015

3,181.77

4,074.25

6,420.05

8,324.90

12,416.80

15,003.64

3,104.20

3,585.35

4,252.75

5,587.56

4,345.88

10,370.86 114079.405

8,183.80

12,675.49

9,877.00

33,628.84

41,032.35

55,493.26
57,405.46
44,458.34
52,306.29
34,100.00

Bahan 1 - Hal 56
Harga Satuan Tertinggi - 2015

36,331.56
32,068.97
36,052.70
52,824.17

6,501.44

6,600.00

6,640.07
95,609.36
1,687,505.20
562,139.58
514,975.92

1,842.89 1675.3368
27,368.18
45,653.47
37,885.21

2,172,940.00

1,008,865.00

2,077,982.52

1,815,143.70
125,202.73
102,438.60
104,766.75
726,072.38
849,774.75
675,163.50
570,396.75
349,222.50
314,300.25
745,008.00
628,600.50
368,932.62
26,173.06

543,180.68

Bahan 1 - Hal 57
Harga Satuan Tertinggi - 2015

20,177.30
20,177.30
20,177.30
6,573.14
7,051.19
2,560.97
14,819.45
16,492.61
18,165.78
23,424.29
1,056.00
2,046.00
1,155.00

616.00
4,950.00

1,540.00
33,000.00
5,882.80

93,500.00
137,500.00
18,700.00
60,500.00

8,525,000.00
30,800.00
11,000.00
5,500.00
3,828.00
7,150.00

46,563.00
62,084.00
139,689.00
73,466.07
102,179.92
135,032.70
186,252.00

Bahan 1 - Hal 58
Harga Satuan Tertinggi - 2015

244,197.07
620,840.00
450,109.00
18,625.20
23,281.50
31,042.00
38,802.50
10,476.68

16,500.00
23,540.00

71,500.00 8,701.47

104,500.00

181,500.00 8,702.53

240,350.00

194,012.50
202,549.05
15,055.37
31,909.62
17,073.10
20,177.30
17,073.10
25,097.46
23,281.50
56,651.65
18,625.20
34,922.25
40,742.63
35,310.28
23,669.53
22,117.43
28,325.83
42,682.75

Bahan 1 - Hal 59
Harga Satuan Tertinggi - 2015

53,547.45
42,682.75
523,833.75
326,717.05
38,802.50
62,084.00
31,042.00

49,667.20

67,516.35
54,019.29
61,070.48
90,797.85
162,970.50
198,668.80
235,919.20
273,169.60
77,605.00

82,500.00

93,500.00

66,000.00

82,500.00

126,500.00

145,200.00

126,500.00

145,200.00

Bahan 1 - Hal 60
Harga Satuan Tertinggi - 2015

319,965.42
369,291.15

388,025.00
171,260.27

33,702.30
65,731.44
573,656.16

23,281.50

35,698.30
21,729.40
23,281.50
18,625.20
18,625.20
18,625.20
39,677.88
110,548.32
97,782.30
45,010.90
31,042.00
55,094.89
28,085.25

17,073.10

40,354.60
776,826.05
543,235.00
729,875.03
657,399.72
500,540.61

301,041.44

334,590.08

371,596.02

518,595.41

Bahan 1 - Hal 61
Harga Satuan Tertinggi - 2015

230,230.75

227,413.69

268,517.18

344,449.79

366,858.24

467,376.11
172,609.04
345,730.28
243,058.86
129,072.64
226,296.18
172,655.60
239,706.32
217,914.84
184,389.48
257,889.18
181,036.94
137,453.98
112,309.96
134,450.66
191,432.13
217,914.84
201,152.16
144,159.05
134,101.44
102,252.35
75,432.06
115,755.62
127,664.11
64,536.32
152,540.39
154,232.18
134,939.57
191,176.04
102,252.35

Bahan 1 - Hal 62
Harga Satuan Tertinggi - 2015

182,410.55
98,899.81
982,002.03
67,050.72
192,770.82
160,921.73
127,396.37
93,871.01
124,590.95
98,061.68
85,489.67
68,726.99
48,611.77
36,194.97
52,800.00
26,510.00
472,989.00

165,000.00

385,000.00
313,500.00
232,980.00
1,100,000.00

3,300,000.00

4,125,000.00

22,000.00

591,030.00
440,000.00
24,636.48
55,781.00
60,500.00
55,000.00

Bahan 1 - Hal 63
Harga Satuan Tertinggi - 2015

118,476.97

123,650.63

136,584.80

228,158.70

349,222.50
324,218.17

186,252.00
341,462.00

465,630.00

931,260.00 229804.866666667
151,671.21
252,784.40
314,300.25
304,754.84
366,661.90

2,264,870.88

5,812,614.50
2,028,594.70
152,283.55

35,698.30
138,136.90
217,294.00
54,323.50

24,057.55
18,625.20
18,625.20

3,492.23
2,328.15
86,917.60
24,833.60
27,937.80

Bahan 1 - Hal 64
Harga Satuan Tertinggi - 2015

9,312.60

11,640.75

7,760.50
15,521.00
1,164.08
4,656.30
12,416.80
1,552.10
40,354.60
38,802.50
1,552.10
14,300.00
19,800.00
74,415.00
100,430.00
14,630.00

246,783.90

282,482.20

335,253.60

451,661.10

772,169.75

890,129.35

1,185,028.35

2,447,661.70

152,796.48

297,227.15

512,322.34

622,521.44

1,133,033.00

Bahan 1 - Hal 65
Harga Satuan Tertinggi - 2015

232,815.00

294,899.00

337,581.75

419,067.00

395,785.50

535,474.50

752,768.50

931,260.00

1,652,986.50

1,288,243.00

10,476.68

13,192.85

19,013.23

25,609.65

29,877.93

34,146.20

62,084.00

73,724.75

117,007.39

154,592.65

46,563.00

65,964.25

63,636.10

90,021.80

Bahan 1 - Hal 66
Harga Satuan Tertinggi - 2015

107,482.93

141,241.10

172,671.13

264,245.03

424,499.35

1,109,751.50

1,366,624.05

41,130.65

175,232.09

135,184.81

49,667.20

53,547.45

76,828.95

174,611.25

240,575.50

364,743.50

5,432.35

7,372.48

8,148.53

10,864.70

14,744.95

14,744.95

Bahan 1 - Hal 67
Harga Satuan Tertinggi - 2015

24,057.55

35,698.30

45,010.90
66,740.30
135,808.75
15,521.00
6,208.40

88,857.73

77,085.05

76,248.46

88,319.15

99,314.22

112,101.97

120,587.31
42,350.00
11,935.00
53,900.00

124,168.00
175,387.30
350,774.60
534,698.45
1,345,670.70
1,737,575.95
103,990.70
62,860.05
55,099.55
81,485.25

77,993.03
256,096.50
62,084.00
249,112.05

Bahan 1 - Hal 68
Harga Satuan Tertinggi - 2015

135,808.75

90,797.85

50,443.25
158,702.23
83,425.38

363,191.40
3,676,924.90
84,589.45

1,462,078.20

884,697.00

353,102.75

311,972.10

3,084,022.70

2,775,154.80
186,029.74

298,779.25
940,122.49

1,861,992.29

1,578,485.70

127,116.99
874,751.53

2,080,590.05

3,009,521.90

931,260.00

600,662.70

1,554,428.15

Bahan 1 - Hal 69
Harga Satuan Tertinggi - 2015

1,756,201.15
69,844.50
1,375,579.67
973,911.71
7,425,000.00

14,960,000.00

92,893.19

93,126.00

90,797.85

164,522.60

276,273.80

100,886.50

138,136.90

77,605.00

100,110.45

121,839.85

107,870.95

96,230.20

69,844.50

69,844.50

141,023.81

135,808.75
835,029.80

Bahan 1 - Hal 70
Harga Satuan Tertinggi - 2015

462,525.80
29,877.93

2,910.19

2,910.19

2,910.19

7,760.50

4,656.30
15,536.52

90,021.80
251,213.59

149,001.60
130,376.40

109,423.05
162,970.50

166,074.70
128,824.30

143,569.25
100,886.50 130.5
170,731.00

143,550.00

151,525.00

110,975.15

123,391.95
4,950.00
6,600.00
10,088.65
12,804.83
27,161.75
3,931.99
7,760.50

7,760.50

Bahan 1 - Hal 71
Harga Satuan Tertinggi - 2015

14,699.94
83,347.77
55,931.48

81,865.51
23,281.50
34,060.83

40,394.95

40,873.00

52,771.40
14,341.40
6,931.68
3,346.33

10,278.01
1,400,459.83
1,400,459.83
119,511.70
133,614.08
159,428.61
175,204.15

110,667.83
274,518.37
129,431.17
66,209.48

11,000.00

11,000.00

12,429.22

15,536.52

21,273.08

23,185.27

Bahan 1 - Hal 72
Harga Satuan Tertinggi - 2015

23,782.83

24,380.39

28,682.81

31,670.60

34,538.88

40,155.93

34,299.86

29,041.34

29,758.41

30,834.02

34,060.83

39,080.33

11,114.59

11,114.59

14,102.38

18,046.27

25,455.99

28,563.30

Bahan 1 - Hal 73
Harga Satuan Tertinggi - 2015

32,387.67

38,363.26

33,582.79

23,543.80

26,292.57

30,475.48

26,770.62

53,780.27

40,873.00

35,973.02

24,380.39

19,958.45

80,670.40

197,313.82

68,719.23

12,429.22

14,221.89

18,404.80

Bahan 1 - Hal 74
Harga Satuan Tertinggi - 2015

23,543.80

27,487.69

29,041.34

35,973.02

42,665.68

37,287.65

24,141.36

34,658.39

40,036.42

42,904.70

65,731.44

40,633.98

9,202.40

7,290.21

Bahan 1 - Hal 75
Harga Satuan Tertinggi - 2015

6,095.10

99,194.71
91,784.99

66,209.48
105,170.30
74,933.84
75,889.93
65,014.36
41,351.05
495,973.56
700,936.12
63,819.25
142,218.92
141,621.36
136,243.34
1,015,849.45
2,910,109.90
55,409.97
44,002.04
83,114.96
66,817.91
83,114.96
66,003.05

124,672.43

101,041.71

86,374.37

88,004.07

60,438.77

Bahan 1 - Hal 76
Harga Satuan Tertinggi - 2015

32,524.26

35,213.27

35,469.37

17,926.76

19,556.46

22,815.87

29,334.69

239,620.96

106,006.88
106,843.46
113,655.63
1,705.00
44,000.00
50,600.00
57,200.00
66,000.00
74,800.00
83,600.00

92,716,307.68

388,884,141.67

972,211,134.11

56,849,115.92

10,079,818.55

8,108,154.88
8,371,771.30

9,437,156.03

Bahan 1 - Hal 77
Harga Satuan Tertinggi - 2015

1,486,547.06
34,035,131.72
19,688,388.50
5,106,409.00
21,515,582.70

174,197.36

266,195.50

8,332.19

10,520.13

13,808.00

17,037.40

9,876.01

8,308.39

20,715.36

27,955.39

14,892.40

19,595.26

32,249.53

24,611.65

32,606.52

35,898.52

49,066.54

14,892.40

22,686.53

33,481.90

Bahan 1 - Hal 78
Harga Satuan Tertinggi - 2015

14,735.64

29,238.46

30,411.85

26,179.27

35,741.76

55,131.63

69,915.90
1,379,506.48
2,821,717.80
235,143.15
294,071.21
360,118.24
739,348.01
78,381.05
95,624.88
843,380.10

29,314.00

32,459.58

32,138.82

133,247.79

225,737.42

131,680.16

197,560.00

14,871.70

49,770.67

68,499.35
74,462.00
78,381.05
39,190.53
47,028.63

Bahan 1 - Hal 79
Harga Satuan Tertinggi - 2015

7,838.11
5,486.67

195,952.63

454,610.09
195,952.63

164,600.21
188,921.61

595,695.98

313,524.20

1,160,039.54

148,924.00
62,704.84

658,400.82
282,171.78
1,167,509.80
1,228,699.79
47,696.03
64,753.61
100,867.87
127,040.94
170,662.71
34,532,579.77

34,362,438.57

34,142,537.04

35,233,461.57

60,775,828.04

61,869,468.74

34,621,778.96

66,957,299.10

4,832,075.33

Bahan 1 - Hal 80
Harga Satuan Tertinggi - 2015

4,767,864.95

1,196,964.00

869,176.00

6,628,879.41

4,367,066.17

4,397,378.68

2,724,975.41

437,304.18

445,539.62

379,091.11

351,244.89

175,562.69

96,369.89

4,137,386.41

4,181,714.38

643,733.48

604,012.13

642,016.85

617,038.91

621,460.84

626,121.80

604,729.20

703,087.33

717,189.71

Bahan 1 - Hal 81
Harga Satuan Tertinggi - 2015

1,813,590.05

2,733,591.11

616,028.49

628,153.50

442,193.29

436,098.19

286,362.45

286,362.45

650,329.90

286,362.45

343,014.10

650,329.90

332,925.45

331,815.70

332,242.53

331,474.24

313,888.94

288,364.66

311,840.17

143,670.14

69,146.06

60,531.90

60,531.90

Bahan 1 - Hal 82
Harga Satuan Tertinggi - 2015

69,146.06

71,450.92

72,389.94

79,048.45

72,219.21

71,621.65

72,389.94

72,389.94

72,389.94

72,389.94

174,743.18

172,182.21
722,021.40

496,245.17
507,071.07
203,133.67
1,318,594.32
283,568.67

449,203.61
218,277.00
286,719.43

104,156.26
86,645.98

849,130.63
102,945.62
130,756.66
124,975.09
66,662.70

Bahan 1 - Hal 83
Harga Satuan Tertinggi - 2015

586,693.80
82,500.00
46,723.38
14,382.79
97,316.67

25,066.42
36,189.80

48,063.36
38,004.72
34,039.11
27,009.64

16,500.00
38,500.00
15,676.21
22,156.23
3,585,351.00

710,861.80

743,455.90

291,794.80
97,130.00
97,130.00
23,540.18
27,500.00

135,526.27

77,085.05

113,536.12
76,726.51
78,160.65
145,640.00
165,000.00
69,850.00

52,771.40

14,744.95

Bahan 1 - Hal 84
Harga Satuan Tertinggi - 2015

17,717.21
19,991.05

1,787,297.47

1,738,352.00

2,041,011.50
17,073.10

1,707,310.00

1,862,520.00
1,831,478.00
24,833.60
21,729.40
1,443,453.00
1,164,075.00
1,195,117.00
1,195,893.05
1,218,398.50
1,367,788.13
1,429,328.89
1,458,042.74
1,476,512.73
1,494,943.92
1,549,383.83
1,569,095.50
1,596,916.89
1,632,498.78
1,656,129.50
1,682,491.92
1,748,463.16
1,552,100.00
1,839,238.50
1,707,310.00
1,862,520.00
2,017,730.00

298,003.20

Bahan 1 - Hal 85
Harga Satuan Tertinggi - 2015

549,443.40
1,280,606.67

1,684,028.50

2,928,036.65

8,969,896.32

14,247,346.74

56,265,953.15
25,532,045.00

222,908,659.67

7,699,968.10

1,164,075.00

1,862,520.00

3,569,830.00

1,666,955.40

1,666,955.40

1,927,708.20

1,927,708.20

1,927,708.20

1,927,708.20

Bahan 1 - Hal 86
Harga Satuan Tertinggi - 2015

3,911,292.00

5,839,000.20

19,231,822.76

22,740,453.46

3,167,060.05

3,848,276.74

4,541,444.60

6,190,706.06

5,366,075.33

7,290,213.70

10,795,165.92

15,254,038.80

997,076.80

997,076.80

1,558,774.03

1,555,669.83

Bahan 1 - Hal 87
Harga Satuan Tertinggi - 2015

1,659,970.95

2,078,261.90

2,505,865.45

2,505,865.45

2,704,379.04

2,704,379.04

3,670,095.66

4,800,784.99

5,281,485.88

7,065,159.20

91,324,011.90

11,271,226.03

26,647,306.46

2,936,402.47

4,893,771.30

8,271,140.90

2,132,585.40

Bahan 1 - Hal 88
Harga Satuan Tertinggi - 2015

3,984,240.70

7,689,103.40

9,883,772.80

2,132,585.40

3,984,240.70

7,689,103.40

9,883,772.80

18,260,456.50

388,025.00
77,605.00
223,502.40

99,334.40
107,094.90
99,334.40
107,094.90
23,281.50
107,094.90

Bahan 1 - Hal 89
Harga Satuan Tertinggi - 2015

141,241.10

40,354.60

3,104.20
66,740.30

31,042.00

108,647.00
9,312.60
9,500.00
9,900.00
62,084.00
62,084.00
190,908.30

162,970.50
108,647.00
19,401.25
53,302.22
30,475.48
45,414.45
11,114.59
12,070.68
38,802.50

201,773.00
447,004.80

785,789.43
236,274.63
764,874.88

51,629,054.40

Bahan 1 - Hal 90
Harga Satuan Tertinggi - 2015

4,366,240.45

230,418.56
7,933,512.59

318,020.63

631,380.31
520,831.99
341,922.97
187,274.83

70,306.34
70,306.34
31,192.55
35,255.95
49,238.82

148,672.55
106,365.41

32,029.14

18,643.83
23,424.29

238,697.46
310,420.00
321,827.94
265,207.33
256,624.21
217,945.88
125,487.29
7,954,372.81
6,572,274.32
2,938,466.76
79,746.90
100,607.12
439,259.82

Bahan 1 - Hal 91
Harga Satuan Tertinggi - 2015

633,737.95
52,802.44
74,242.12
93,384.68
71,396.60
138,136.90
195,455.95
37,250.40
54,323.50
59,321.26
5,975.59

166,881.79

202,083.42

287,371.32

372,985.15

176,768.67

225,985.76

439,911.70

292,043.14

138,090.34

316,054.12

403,297.66

250,974.57

143,414.04

184,482.61

292,803.67

370,486.27

418,290.95
113,753.41
148,737.74

Bahan 1 - Hal 92
Harga Satuan Tertinggi - 2015

221,639.88
297,475.49
402,754.43
522,700.72
85,070.60
40,199.39
91,263.48
126,899.70
268,901.33
507,924.73
657,314.35
28,682.81
32,159.51

17,926.76

25,097.46
340,608.35
597,558.50
776,826.05
95,935.30
137,873.04
59,647.20
72,902.14
78,225.84
50,303.56
1,434,140.40
60,299.09
34,006.51
15,536.52

131,462.87
10,158.49
609,509.67
1,139,272.44

1,434,140.40

1,673,163.80

3,096,439.50

4,720,712.15

1,207,533.80

1,328,287.18

Bahan 1 - Hal 93
Harga Satuan Tertinggi - 2015

2,915,775.06

3,553,843.37

92,349.95

115,926.35
161,340.80

262,925.74
3,167,060.05

776,826.05

65,731.44
172,748.73
34,658.39
12,277.11
44,762.56
37,483.22
56,713.73
58,452.09
6,084.23
717,070.20
597,558.50

45,527.75

21,911.00

8,536.55
68,292.40
2,328.15

286,828.08

256,096.50
77,605.00
7,760.50

Bahan 1 - Hal 94
Harga Satuan Tertinggi - 2015

209,533.50
145,897.40
192,460.40
287,138.50
131,928.50
69,844.50
62,084.00
54,323.50
93,126.00
99,334.40
107,094.90
110,199.10
145,897.40
46,563.00

3,000,000.00

2,328.15

6,674.03

6,150.20
11,827.00
9,685.10
1,959.53

325.94

2,231.14

6,518.82

5,820.38

10,864.70

15,831.42
2,134.14

4,074.26

10,399.07

63,636.10

27,223.83

Bahan 1 - Hal 95
Harga Satuan Tertinggi - 2015

23,902.34

23,436.71

318,956.55

178,491.50

7,269.00
9,747.19
6,091.99

10,205.06
20,177.30

108,900.00

385.00
154,000.00

495,000.00

46,750.00

209,000.00
121,770.00 45,201,000.00
1,650,000.00
HP
55,000.00

rlaku.

Bahan 1 - Hal 96
STANDAR HARGA SATUAN
A. HARGA SATUAN UPAH

DAFTAR HARGA SATUAN UPAH

UPAH (SWAKELOLA) UPAH


URAIAN
Org/jam Org/hr Org/jam

Mandor Rp 13,637.40 Rp 109,099.20

Kepala Tukang Batu Rp 12,835.20 Rp 102,681.60

Kepala Tukang Kayu Rp 12,835.20 Rp 102,681.60

Kepala Tukang Besi Rp 12,835.20 Rp 102,681.60

Kepala Tukang Cat Rp 12,835.20 Rp 102,681.60

Kepala Tukang Listrik Rp 12,835.20 Rp 102,681.60

Tukang Batu Rp 11,230.80 Rp 89,846.40

Tukang Kayu Rp 12,033.00 Rp 96,264.00

Tukang Besi/Baja Rp 11,230.80 Rp 89,846.40

Tukang Aluminium Rp 12,033.00 Rp 96,264.00

Tukang Cat Rp 11,230.80 Rp 89,846.40

Tukang Listrik Rp 11,230.80 Rp 89,846.40

Tukang Pipa Rp 11,230.80 Rp 89,846.40

Tukang Plitur Rp 11,230.80 Rp 89,846.40

Tukang Taman Rp 11,230.80 Rp 89,846.40

Upah - Hal 97
Pembantu Tukang Rp 8,022.00 Rp 64,176.00

Pekerja Biasa Rp 8,022.00 Rp 64,176.00

Penjaga Malam Rp 8,022.00 Rp 64,176.00

Sopir Rp 11,230.80 Rp 89,846.40

Operator Rp 12,835.20 Rp 102,681.60

Mekanik Rp 11,230.80 Rp 89,846.40

Pembantu Sopir Rp 9,626.40 Rp 77,011.20

Pembantu Operator Rp 9,626.40 Rp 77,011.20

Pembantu Mekanik Rp 9,626.40 Rp 77,011.20

Upah - Hal 98
RINGKASAN ANALISA PERALATAN
Biaya Pemilikan
Umur Jam Harga
Eko- Kerja / Dasar Faktor Angsuran Modal Pengemba- Asuransi Biaya
No Jenis Peralatan Tenaga
nomis Tahun Pemilikan Nilai Sisa lian dll Pasti
(HDP) ( 20% * HDP ) Suku Bunga Modal Faktor
i = 16% 0.002
Pw A W B C D E F G
20% x B ix(1+i)^A/(1+i)^A-1 (B-C) x D / W (0,002xB)/W (E+F)
1 Dump Truck 320 4 2,100 388,920,282 77,784,056 0.3090313 45,786.11 370.40 46,156.51
2 Excavator 246 3 2,100 2,197,399,591 439,479,918 0.3797802 317,915.77 2092.76 320,008.53
3 Bulldozer 315 3 2,100 398,537,075 79,707,415 0.3797802 57,659.62 379.56 58,039.18
4 Motor Greder 100 3 2,100 591,698,475 118,339,695 0.3797802 85,605.86 563.52 86,169.38
5 Wheel Loader 135 2 2,100 1,056,566,765 211,313,353 0.5236364 210,764.49 1006.25 211,770.74
6 Water tank 280 4 2,100 518,560,376 103,712,075 0.3090313 61,048.15 493.87 61,542.01
7 Concrete Mixer 200 4 2,100 4,042,500 808,500 0.3090313 475.91 3.85 479.76
8 Stamper 5.5 3 2,100 10,990,000 2,198,000 0.3797802 1,590.01 10.47 1,600.48
9 Vibrator Roller 125 4 2,100 1,120,000,000 224,000,000 0.3090313 131,853.35 1066.67 132,920.02
ATAN
Biaya Operasional

Bahan Bakar Pelumas Perawatan & Operator Pembantu Biaya Biaya Alat
0,125 - 0,175 Ltr/HP Perbaikan Operator Operasi per Jam
Solar : Rp. 4500 (Ms) 0,01-0,02 ltr/HP (Rp) (Rp)
Bensin : Rp. 6500 (Mb) Rp/ltr 28000 (Mp) 12,5% - 17,5 %
H I K L M P S
0,125 x Pw x Ms 0,01 x Pw x Mp ( 12,5 x B ) / W H+I+K+L+M G+P
0.125 s 276,000.00 0.01 92,800.00 12.5 23,150.02 s 9,375.00 10,519.00 411,844.02 458,000.53
0.125 s 212,175.00 0.01 71,340.00 12.5 130,797.59 O 12,500.00 9,375.00 436,187.59 756,196.13
0.125 s 271,687.50 0.01 91,350.00 12.5 23,722.44 O 12,500.00 9,375.00 408,634.94 466,674.12
0.125 s 86,250.00 0.01 7,300.00 12.5 35,220.15 O 12,500.00 9,375.00 150,645.15 236,814.53
0.125 s 116,437.50 0.01 39,150.00 12.5 62,890.88 O 12,500.00 9,375.00 240,353.38 452,124.12
0.125 B 255,500.00 0.01 81,200.00 12.5 30,866.69 S 9,375.00 10,519.00 387,460.69 449,002.70
0.125 172,500.00 0.01 13,800.00 12.5 240.63 M 10,519.00 9,350.00 206,409.63 206,889.38
0.125 s 4,743.75 0.01 1,595.00 12.5 654.17 O 12,500.00 9,375.00 28,867.92 30,468.40
0.125 s 107,812.50 0.01 36,250.00 12.5 66,666.67 O 9,375.00 9,375.00 229,479.17 362,399.19
RENCANA ANGGARAN BIAYA
Pengendalian Banjir Sungai Tilamuta Kabupaten Boalemo
Tahung Anggaran 2019

No uraian satuan volume harga satuan (Rp)


1 Mobilisasi / demobilisasi Ls Ls Rp 1,000,000,000

2 Dewatering Ls ls Rp 275,000,000.0

3 Pekerjaan tanah M 1200


Timbunan tanah dipadatkan dari
m³ 16650 Rp 293,908.97
borrow jarak 2 km
Stripping tanah m² 10800 Rp 68,913.86

4 Pekerjaan pasangan M 3200


galian tanah biasa m³ 31045.8 Rp 161,257.33
pasangan batu m³ 36800 Rp 898,038.48
pasangan batu kosong m³ 1652.53 Rp 563,192.61
plesteran 1 : 3 m² 1920 Rp 55,402.72
Siaran 1 : 2 m2 14720 Rp 72,690.10
trimbisan tanah m³ 5450 Rp 53,105.68
buangan hasil galian jarak 4 - 5 Km m³ 25595.8 Rp 45,450.25

5 Pekerjaan beton M 3200


penulangan Kg 563200 Rp 25,408.55
pekerjaan beton K 225 m³ 5120 Rp 893,854.17
pekerjaan bekisting m² 20480 Rp 150,574.20
pekerjaan bongkaran cetakan m² 20480 Rp 3,303.78

6 Perkuatan tebing M 259


galian pasir dan kerikil m³ 323.75 Rp 45,508.24
bronjong kawat pabrikasi m3 2978.5 Rp 335,616.95
tiang pancang pipa galvanis bh 129.5 Rp 30,585,295.62
geotkestile m² 1036 Rp 50,000.00
Total Biaya Terbilang
en Boalemo

jumlah harga (Rp)


Rp 1,000,000,000

Rp 275,000,000.0

Rp 4,893,584,338
Rp 744,269,728

Rp 5,006,362,721
Rp 33,047,816,037
Rp 930,692,677
Rp 106,373,217
Rp 1,069,998,338
Rp 289,425,939
Rp 1,163,335,489

Rp 14,310,095,109
Rp 4,576,533,369
Rp 3,083,759,527
Rp 67,661,424

Rp 14,733,293
Rp 999,635,079
Rp 3,960,795,782
Rp 51,800,000
Rp 75,591,872,068

Rp 75,591,872,068
REKAPITULASI DAFTAR KUANTITAS DAN HARGA

Satuan Kerja :
Kegiatan :
Pekerjaan : Pengendalian Banjir Sungai Tilamuta
Lokasi : Kabupaten Boalemo Provinsi Gorontalo
Tahun Anggaran : Tahung Anggaran 2019

No URAIAN PEKERJAAN SATUAN HARGA (Rp)


1 2 3 4
Ls Rp 1,000,000,000
I. Mobilisasi / demobilisasi

Ls Rp 275,000,000
II. Dewatering

Pekerjaan tanah M Rp 5,637,854,066


III.

Pekerjaan pasangan M Rp 41,614,004,418


IV.

Pekerjaan beton M Rp 22,038,049,429


V.

Perkuatan tebing M Rp 5,026,964,155


VI.

Jumlah Harga
A. Rp 75,591,872,068

Pajak Pertambahan Nilai (PPN) 10%


B. Rp 7,559,187,207

Total
C. Rp 83,151,059,275

D. Dibulatkan Rp 78,304,700,000

"TUJUH PULUH DELAPAN MILIAR TIGA RATUS EMPAT JUTA


E. Terbilang
TUJUH RATUS RIBU RUPIAH"

Jakarta, Desember 2018


PT.SUMBER SARI CIPTA MANDIRI

RIZKI GEOVANI, Str, M.T.


DIREKTUR
ARGA

KET
5

TUS EMPAT JUTA


"

Desember 2018
ER SARI CIPTA MANDIRI

EOVANI, Str, M.T.


DIREKTUR
Analisa Harga Satuan

Pekerjaan : Pengendalian Banjir Sungai Tilamuta Kab. Boalemo Gor


Jenis Pekerjaan : timbunan tanah dipadatkan dari borrow jarak 2 km
Satuan : m3

3.1 Timbunan tanah dipadatkan


dari borrow jarak 2 km

harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 0.0778 Rp 64,176
2 Mandor OH 0.0156 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
1 tanah timbunan M3 1.1 Rp 183,900
Jumlah Harga Bahan
C Peralatan
1 Excavator unit 0.0285 Rp756,196
2 dump trcuk unit 0.113 Rp458,001
3 vibro roller unit 0.0178 Rp362,399
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M3 (D+E)

Analisa Harga Satuan

Pekerjaan : Pengendalian Banjir Sungai Tilamuta Kab. Boalemo Gor


Jenis Pekerjaan : timbunan tanah dipadatkan dari borrow jarak 2 km
Satuan : m3

3.2 Stripping Tanah

harga satuan
No uraian kode satuan koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 0.0778 Rp 64,176
2 Mandor OH 0.0156 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan

C Peralatan
1 Bulldozer unit 0.009 Rp466,674
2 Dump Truck unit 0.113 Rp458,001
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M2 (D+E)
Analisa Harga Satuan

Pekerjaan : Pengendalian Banjir Sungai Tilamuta Kab. Boalemo Gor


Jenis Pekerjaan : galian tanah biasa
Satuan : m3

4.1 Galian Tanah Biasa

harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 0.675 Rp 64,176
2 Mandor OH 0.0675 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Excavator unit 0.0372 Rp756,196
2 dump truck unit 0.148 Rp458,001
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M3 (D+E)

Analisa Harga Satuan

Pekerjaan : Pengendalian Banjir Sungai Tilamuta Kab. Boalemo Gor


Jenis Pekerjaan : Pasangan Batu
Satuan : m3

4.2 Pasangan Batu

harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 1.800 Rp 64,176
2 Tukang batu OH 0.900 Rp 89,846
3 Mandor OH 0.068 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu kali m3 1.200 Rp185,000
2 Pasir Pasang m3 0.520 Rp206,947
3 Semen Portland kg 163 Rp1,640
Jumlah Harga Bahan
1 Concrete Mixer unit 0.076 206,889.38
2 1 set alat bantu pasangan set 1
C Peralatan
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M3 (D+E)
Analisa Harga Satuan

Pekerjaan : Pengendalian Banjir Sungai Tilamuta Kab. Boalemo Gor


Jenis Pekerjaan : Pasangan Batu Kosong
Satuan : m3

4.3 Pasangan Batu Kosong

harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 1.000 Rp 64,176
2 Tukang batu OH 0.500 Rp 89,846
3 Kepala Tukang Batu OH 0.050 Rp 102,682
4 Mandor OH 0.100 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu Belah m3 1.200 Rp265,738
2 pasir m3 0.001 Rp180,000
3 Dump Truck unit 0.148 Rp458,001
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M3 (D+E)

Analisa Harga Satuan

Pekerjaan : Pengendalian Banjir Sungai Tilamuta Kab. Boalemo Gor


Jenis Pekerjaan : Plesteran
Satuan : m3

4.4 Plesteran

harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 0.300 Rp 64,176
2 Tukang batu OH 0.150 Rp 89,846
3 Kepala Tukang Batu OH 0.015 Rp 102,682
4 Mandor OH 0.030 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir Pasang m3 0.016 Rp206,947
2 Semen Portland kg 5.800 Rp1,640
Jumlah Harga Bahan
1 1 set peralatan set
C Peralatan
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M2 (D+E)
4.5 Siaran

harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 0.300 Rp 64,176
2 Tukang batu OH 0.150 Rp 89,846
3 Kepala Tukang Batu OH 0.015 Rp 102,682
4 Mandor OH 0.030 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir Pasang m3 0.012 Rp206,947
2 Semen Portland kg 6.300 Rp1,640
Jumlah Harga Bahan
1 1 set peralatan set
2 Concrete Mixer unit 0.076 206,889.38
C Peralatan
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M3 (D+E)

4.5 penimbunan tanah kembali (timbrisan)

harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 0.033 Rp 64,176
4 Mandor OH 0.003 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan

Jumlah Harga Bahan


C Peralatan
1 Dump truck 0.1 Rp458,001
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M3 (D+E)
4.7 Buangan Hasil Galian

harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 0.0352 Rp 64,176
2 Mandor OH 0.0176 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Excavator unit 0.037 Rp756,196
2 Dump truck unit 0.02 Rp458,001
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M3 (D+E)

5.1 Penulangan

harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 0.025 Rp 64,176
2 Tukang besi OH 0.025 Rp 89,846
3 Kepala tukang besi OH 0.003 Rp 102,682
4 Mandor OH 0.003 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
1 Besi ulir diameter 16 Kg 1.05 Rp8,703
2 Besi polos diameter 10 Kg 1.05 Rp8,701
3 kawat ikat Kg 0.021 Rp21,165
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / Kg (D+E)

5.2 pekerjaan beton K225 (ready mix)


harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 0.500 Rp 64,176
2 Tukang batu OH 0.167 Rp 89,846
3 Kepala tukang batu OH 0.033 Rp 102,682
4 Mandor OH 0.111 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
1 beton ready mix K 225 M3 1 Rp750,000
Jumlah Harga Bahan
C Peralatan
1 vibrator concrete unit 0.01 Rp45,201,000
2 sekop bh 0.025 Rp55,000
3 1 set alat bantu
4 pacul bh 0.025 Rp50,000
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M3 (D+E)
5.3 pekerjaan bekisting

harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 0.360 Rp 64,176
2 Tukang kayu OH 0.180 Rp 96,264
3 Kepala tukang kayu OH 0.018 Rp 102,682
4 Mandor OH 0.036 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
1 kayu papan 3/20 kelas II m3 0.014 Rp2,600,000
2 kaso 5/7 m3 0.008 Rp4,938,500
3 paku 5 dan 7 cm kg 0.3 Rp16,932
4 minyak bekisting L 0.2 Rp48,457
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M2 (D+E)

5.4 pembongkaran bekisting

No uraian kode satuan koefisien harga satuan


(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 0.040 Rp 64,176
4 Mandor OH 0.004 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M2 (D+E)

6.1 galian pasir dan kerikil


harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 0.147 Rp 64,176
4 Mandor OH 0.015 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Excavator 0.028 Rp756,196
1 Dump Track 0.02 Rp458,001
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M3 (D+E)
6.1 bronjong kawat pabrikasi

harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 1.635 Rp 64,176
2 tukang batu OH 0.545 Rp 89,846
3 kepala tukang batu OH 0.650 Rp 102,682
4 Mandor OH 0.229 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
1 batu m3 2.2 Rp309,009
2 kawat bronjong Kg 21.1 Rp87,214
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D
bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M3 (D+E)

6.1 tiang pancang pipa galvanis

harga satuan
No uraian kode satuan koefisien (Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 pekerja OH 0.200 Rp 64,176
2 tukang listrik OH 0.040 Rp 89,846
3 kepala tukang listrik OH 0.040 Rp 102,682
4 Mandor OH 0.020 Rp 109,099
Jumlah Harga Tenaga Kerja
B Bahan
1 kawat las listrik kg 0.1 Rp 38,803
2 BBM non subsidi L 0.8 Rp 8,500
3 tiang pancang bh 1 Rp 2,750,000
Jumlah Harga Bahan
C Peralatan
1 1 set Theodolite 1 Rp 500,000
2 Mobile Crane 0.161 Rp 277,039
3 alat pancang hammer 0.04 Rp 2,500,000
4 las listrik 0.04 Rp 1,190,000
Jumlah Harga Peralatan
Jumlah harga tenaga kerja,
D bahan dan peralatan (A+B+C)
E Overhead + Profit (10%)
F Harga Satuan Pekerjaan / M (D+E)
F Harga Satuan Pekerjaan / 8M (D+E)
ngai Tilamuta Kab. Boalemo Gorontalo
atkan dari borrow jarak 2 km

16650

Jumlah harga (Rp)


7

Rp 4,993
Rp 1,702
Rp 6,695

Rp 202,290
Rp 202,290

Rp 21,552 456
Rp 51,754 94.08
Rp 6,451 449.4382022472
Rp 58,205
Rp 267,189.97
Rp 26,719.00
Rp 293,908.97

ngai Tilamuta Kab. Boalemo Gorontalo


atkan dari borrow jarak 2 km

10800

Jumlah harga (Rp)


7

Rp 4,993
Rp 1,702
Rp 6,695

Rp 4,200 888.8888888889
Rp 51,754 94.08
Rp 55,954
Rp 62,649
Rp 6,265
Rp 68,914
ngai Tilamuta Kab. Boalemo Gorontalo

31045.8

Jumlah harga (Rp)


7

Rp 43,319
Rp 7,364
Rp 50,683

Rp 28,130 456
Rp 67,784 54.0540540541
Rp 95,915
Rp 146,598
Rp 14,660
Rp 161,257

ngai Tilamuta Kab. Boalemo Gorontalo

36800

Jumlah harga (Rp)


7

Rp 115,517 4.4444444444
Rp 80,862 8.8888888889
Rp 7,364 118.5185185185
Rp 203,743
Rp 222,000
Rp 107,612
Rp 267,320
Rp 596,932
Rp 15,724 16.8

Rp 15,724
Rp 816,399
Rp 81,640
Rp 898,038
ngai Tilamuta Kab. Boalemo Gorontalo

1652.53

Jumlah harga (Rp)


7

Rp 64,176 8
Rp 44,923 16
Rp 5,134 160
Rp 10,910 80
Rp 125,143

Rp 318,886
Rp 180
Rp 67,784 54.0540540541
Rp 386,850

Rp 511,993
Rp 51,199
Rp 563,193

ngai Tilamuta Kab. Boalemo Gorontalo

1920

Jumlah harga (Rp)


7

Rp 19,253 26.6666666667
Rp 13,477 53.3333333333
Rp 1,540 533.3333333333
Rp 3,273 266.6666666667
Rp 37,543

Rp 3,311
Rp 9,512
Rp 12,823

Rp 50,366
Rp 5,037
Rp 55,403
14720

Jumlah harga (Rp)


7

Rp 19,253 26.6666666667
Rp 13,477 53.3333333333
Rp 1,540 533.3333333333
Rp 3,273 266.6666666667
Rp 37,543

Rp 2,483
Rp 10,332
Rp 12,815

Rp 15,724 16.8

Rp 15,724
Rp 66,082
Rp 6,608
Rp 72,690

5450

Jumlah harga (Rp)


7

Rp 2,118
Rp 360
Rp 2,478

Rp -

Rp 45,800 80
Rp 45,800
Rp 48,278
Rp 4,828
Rp 53,106
25595.8

Jumlah harga (Rp)


7

Rp 2,259 227.2727272727
Rp 1,920 454.5454545455
Rp 4,179

Rp 27,979 216.2162162162
Rp 9,160 400
Rp 37,139
Rp 41,318.41
Rp 4,131.84
Rp 45,450.25

563200

Jumlah harga (Rp)


7

Rp 1,604 320
Rp 2,246 320
Rp 257 3200
Rp 273 3200
Rp 4,380

Rp 9,138
Rp 9,137
Rp 444
Rp 18,719

Rp 23,098.68
Rp 2,309.87
Rp 25,408.55

5120
Jumlah harga (Rp)
7

Rp 32,088 16
Rp 14,977 47.9904019196
Rp 3,419 240.2402402402
Rp 12,110 72.0720720721
Rp 62,595

Rp 750,000
Rp 750,000

Rp 452,010 800
Rp 1,375

Rp 1,250
Rp 454,635
Rp 812,594.70
Rp 81,259.47
Rp 893,854.17
20480

Jumlah harga (Rp)


7

Rp 23,103 22.2222222222
Rp 17,328 44.4444444444
Rp 1,848 444.4444444444
Rp 3,928 222.2222222222
Rp 46,207

Rp 36,400
Rp 39,508
Rp 5,080
Rp 9,691
Rp 90,679

Rp 136,885.63
Rp 13,688.56
Rp 150,574.20

20480

Jumlah harga (Rp)


7

Rp 2,567 200
Rp 436 2000
Rp 3,003

Rp 3,003.44
Rp 300.34
Rp 3,303.78

323.75
Jumlah harga (Rp)
7

Rp 9,434 54.4217687075
Rp 1,604 544.2176870748
Rp 11,038

Rp 21,173 456
Rp 9,160 400
Rp 30,333
Rp 41,371.13
Rp 294,245.82
Rp 335,616.95
2978.5

Jumlah harga (Rp)


7

Rp 104,928 4.8929663609
Rp 48,966 14.6788990826
Rp 66,743 12.3076923077
Rp 24,984 34.9344978166
Rp 245,621

Rp 679,820
Rp 1,840,214
Rp 2,520,033

Rp 2,765,654.11
Rp 276,565.41
Rp 3,042,219.52

129.5

Jumlah harga (Rp)


7

Rp 12,835 40
Rp 3,594 200
Rp 4,107 200
Rp 2,182 400
Rp 22,718

Rp 3,880
Rp 6,800
Rp 2,750,000
Rp 2,760,680

Rp 500,000
Rp 44,603 49.6894409938
Rp 100,000 200
Rp 47,600
Rp 692,203
Rp 3,475,601.77
Rp 347,560.18
Rp 3,823,161.95
Rp 30,585,295.62
JANGKA WAKTU PELAKSANAAN

Saruan Kerja : Sungai Tilamuta Kabupaen Boalemo Gorontalo


Kegiatan : Pengendalian Banjir Sungai Tilamuta Kab. Boalemo Provinsi Gorontalo
Pekerjaan : Bangunan Pengendali Banjir Sungai Tilamuta Kab. Boalemo Provinsi Gorontalo
Lokasi : Sungai Tilamuta Kabupaen Boalemo Gorontalo
Tahun Anggaran : 2019

No WAKTU PELAKSANAAN
Uraian Bobot Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Januari
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1
1 Mobilisasi / demobilisasi 1.323 0.331 0.331 0.331 0.331

2 dewatering 0.364 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008

3 pekerjaan tanah
timbunan tanah
dipadatkan dari borrow 6.474 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65
jarak 2 km
stripping tanah 0.985 0.25 0.25 0.25 0.25

4 Pekerjaan pasangan
galian tanah biasa 6.623 0.83 0.83 0.83 0.83 0.83 0.83
0.83 0.83
pasangan batu 43.719 1.75 1.75 1.75 1.75 1.75
1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75
pasangan batu kosong 1.231 0.05 0.05 0.05 0.05 0.05 0.05
0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
plesteran 1 : 3 0.141 0.006 0.006 0.006 0.006
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
Siaran 1 : 2 1.415 0.057 0.057
0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057
trimbisan tanah 0.383 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
buangan hasil galian jarak 4 - 5 Km1.539 0.192 0.192 0.192 0.192 0.192 0.192 0.192 0.192

5 Pekerjaan beton
penulangan 18.931 1.893 1.893 1.893 1.893 1.893 1.893 1.893 1.893 1.893 1.893 1.893
pekerjaan beton K 225 6.054 0.505 0.505 0.505 0.505 0.505 0.505 0.505 0.505 0.505 0.505 0.505 0.505
pekerjaan bekisting 4.079 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
pekerjaan bongkaran cetakan 0.090 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

6 perkuatan tebing
galian pasir dan kerikil 0.019 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
bronjong kawat pabrikasi 1.322 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
tiang pancang pipa galvanis 5.240 0.655 0.655 0.655 0.655 0.655 0.655 0.655 0.655
geotkestile 0.069 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009

RENCANA BOBOT 0.3 0.34 0.58 1.23 0.90 1.78 3.47 3.48 3.48 3.54 3.54 3.56 4.07 2.59 2.40 2.40 2.40 4.29 4.80 4.80 4.29 4.29 4.30 4.30 4.30 4.36 4.36 4.36 2.47 2.47 1.92 0.79 0.79 0.79 0.73 0.73 0.73 0.74 0.74 0.08 0.08 0.08 0.08 0.08 0.08
BOBOT KOMULATIF RENCANA100.00 0.0 0.34 0.6 1.82 2.72 4.50 7.97 11.45 14.93 18.47 22.00 25.56 29.62 32.21 34.61 37.01 39.40 43.69 48.49 53.28 57.57 61.85 66.15 70.44 74.74 79.10 83.46 87.82 90.29 92.76 94.68 95.47 96.26 97.05 97.78 98.51 99.24 99.98 ### ### ### ### ### 101 100
BOBOT AKTUAL
BOBOT KOMULATIF AKTUAL
DEVIASI

Jakarta, 22 November 2018


PT. SUMBER SARI CIPTA MANDIRI

RIZKI GEOVANI, Str, M.T.


DIREKTUR
JANGKA WAKTU PELAKSANAAN

Saruan Kerja : Sungai Tilamuta Kabupaen Boalemo Gorontalo


Kegiatan : Pengendalian Banjir Sungai Tilamuta Kab. Boalemo Provinsi Gorontalo
Pekerjaan : Bangunan Pengendali Banjir Sungai Tilamuta Kab. Boalemo Provinsi Gorontalo
Lokasi : Sungai Tilamuta Kabupaen Boalemo Gorontalo
Tahun Anggaran : 2019

WAKTU PELAKSANAAN
No Uraian Bobot Februari Maret April Mei Juni Juli Agustus September Oktober November
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1
1 Mobilisasi / demobilisasi 1.323 0.22 0.22 0.22 0.22 0.22 0.220482 1.32

2 dewatering 0.364 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.36

3 pekerjaan tanah
timbunan tanah
dipadatkan dari borrow 6.474 0.92 0.92 0.92 0.92 0.92 0.92 0.92
jarak 2 km 6.4737
stripping tanah 0.985 0.49 0.49

4 Pekerjaan pasangan
galian tanah biasa 6.623 1.32 1.32 1.32 1.32 1.32
pasangan batu 43.719 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82
pasangan batu kosong 1.231 0.25 0.25 0.25 0.25 0.25
plesteran 1 : 3 0.141 0.141
Siaran 1 : 2 1.415 0.472 0.472 0.472
trimbisan tanah 0.383 0.191 0.191
buangan hasil galian jarak 4 - 5 Km1.539 0.513 0.513 0.513

5 Pekerjaan beton
penulangan 18.931 3.786 3.786 3.786 3.786 3.786
pekerjaan beton K 225 6.054 3.027 3.03
pekerjaan bekisting 4.079 0.68 0.68 0.68 0.68 0.68 0.68
pekerjaan bongkaran cetakan 0.090 0.09

6 perkuatan tebing
galian pasir dan kerikil 0.019 0.02
bronjong kawat pabrikasi 1.322 0.66 0.66
tiang pancang pipa galvanis 5.240 1.747 1.747 1.747
geotkestile 0.069 0.0685258859

RENCANA BOBOT 0.2 0.23 0.72 1.65 0.93 2.51 4.33 4.33 4.33 4.33 1.83 1.83 1.83 1.83 1.83 1.83 2.51 6.30 9.32 6.30 6.30 6.30 1.83 1.83 1.83 1.83 1.83 1.83 2.30 3.01 4.35 2.38 1.76 1.76 0.67 0.89 0.30
BOBOT KOMULATIF RENCANA100.00 0.2 0.46 1.18 2.83 3.77 6.27 10.60 14.92 19.25 23.58 25.41 27.24 29.07 30.90 32.74 34.57 37.08 43.38 52.70 59.00 65.30 71.59 73.43 75.26 77.09 78.92 80.75 82.58 84.89 87.89 92.25 94.63 96.38 98.14 98.81 99.70 100.00
BOBOT AKTUAL
BOBOT KOMULATIF AKTUAL
DEVIASI

Jakarta, 22 November 2018


PT. SUMBER SARI CIPTA MANDIRI

RIZKI GEOVANI, Str, M.T.


DIREKTUR