car PGR NAGE CT COROT SRST MAN CONTRACTOR
1 Real Estate
gthoe
aimoored ean MLL
Jonouecr numeen esas
pnovecr name ARBOUR ROW DEVELOPMENT
levee Gi ReaLesrare
JPRovEcr MANAGER cosT CONSULTANTS OG JONES & PARTNERS(ME)
Jcousuiranr [AREF SADEQ DESIGN CONSULTANTS W.LL (ASO)
Juan conteacron [ALMORYYED CONTRACTING W.LL
Project Commencement Project Completion
smact? 2600019
fre ‘Mr Rober Aleksander Gave Sadeu Deen Constants
From 1. Blo Prasad Rao -Almosyed Contracting,
sue: ‘Methoe Statement -Bakfing Around Piecape/Foundatons.
MSH Deseintion Revision
Aoproval Requires On ox Before
JMain Contractor (Name & Sign) Mr. N. Bala Prasada Rao BP BI Ship- Date: 13-May-2017
7 compete Ate. (ayer by ber mo ou
tne 1D MM ECEIVE
F
a 14 way 2a Be
be In x :
ccosutane ame se) Vi jays Mee, j Vin we 2 Ly _
[cient ame sign) ate
[Receives by contractor bateDate: 13-05-2017 |
BACKFILLING AROUND Rev -0
. PILECAPS/FOUNDATIONS | Page 1 of
Almoayyed Contracting B fee
CLIENT | GFH REAL ESTATE
PROJECT
MANAGER D.G.JONES & PARTNERS(ME).W.L.L
CONSULTANT | AREF SADEQ DESIGN CONSULTANTS
CONTRACTOR | ALMOAYYED CONTRACTING
PROJECT | HARBOUR ROW DEVELOPMENT
METHOD STATEMENT
FOR
BACKFILLING AROUND PILECAPS/FOUNDATIONS,
ISSUE RECORD
DESCRIPTION PREPARED BY | REVIEWEDBY | APPROVED BYDate: 13-05-2017
BACKFILLING AROUND Rev -0
PILECAPS/FOUNDATIONS | Page 2 of 5
INDEX
Deseription
Purpose
Scope
| Risk Assessment
Reference Documents
Responsibility
Tools & Equipments
Procedure
| Documentation
HSE Requirements