You are on page 1of 3
Loa b, 2 a. b. e d. 3 a b. 4 a b. 5 a b. 6 hrs, : 100 Max. Marks: Note: Answer FIVE full questions, choosir osing one full question from each module. lain the need for estimation at 10 Marks) jo a abe ion and costing, a estimate, (10 Marks) What is estimation? Exp Write a note on detailed OR Write the detailed specifications for the following: Earthwork in exeavation for foundation in hard soil Providing and laying PCC roof slab with CC 1:1.5:3 First class brickvork in CM I in super strstr 8 and laying plastering to internal walls in CM 1:6. anmaris What is tender? What are the contents et wear? Write short notes on the following + i) Administrative sanction and technical sanction ii) Security retention and earnest money deposit iii) Measurement book and its importance iv) Valuation’and different methods of valuation. (12 Marks) (oe Maney OR xplain at least three standard test results considered as a part of specification and their ion i i antiti (12 Marks) inclusion in the Bill of quantities. aaa Write a note on material security ‘and workers safety considered in specification. (08 Marks) Module-3 Foiars affecting rate analysis ofan tem. (0 Mar) What is rate analysis? Describe the Write short note of ' ®) Schedule ofates ys Unit rate and lump sum rate (10 Marks) OR ate analysis for the following Given: ee r = 2 750/m: Brg for bed in foundation fe Ot ncey ih CM ig. bso apouneo? 4 1.6 in super stBclure He ing 1:3 60 Ri ment = @ 320/bag, sand = % 120/m? and doy ailed esti etd im: 7 rept ok. Meriva items © it EXCAVation @ a, Earth r n@t 2 snr CM 1 in found: class brick work in su lential building es shown in Fi in Fi @ the rate of 2 100/m? On at the rate of & 2150/m? '8.Q7 for the following ¢ Per structure in Ci e int CM 1:6 at th w a, the rate of 3700/m? ‘ LL Ti a (08 Marks) sot u . g foo Iw fosece aw t om aid [2 L too Fe none an foro Xecievin eee t 1 Sem zs 4 ia \ 0:0 £5 \ " : L 4 i q : » &r¥ rin Y cobnn0asm Fig.Q7 ‘ OR 3 Prepare a detailed estimate for a office room of size 6mx8m for the following items of work, ‘a. Providing and laying flooring using modular tiles of size (0.6mx1.2m in CM 1:6 on a bed of a PCC 1:48 (07 Marts) i A b. Providing and laying false ceiling. (06 Masks) “ © providing and laying two coats of plastic emulsion for intemal walls over a coat of primer and B putty. (07 Marks) ia Module-5 9 Estimate the earth work for a portion of the toad from the following data Formation width of road is 10m side slopes ae 2:1 in Gling ‘and 15:1 in eutting. Cost of (20 Marks) filling is < 200%m’ and cost ‘ofcutting is % 140%m’ OE ————— 10 PB detailed estimate fi a repare a detailed estimate for a septic tank wi shown in Fig.Ql0 for the following items of work. oe ea EQ a. Barth work in excavation (o7Marks) b. First class brick work (06 Marks) c. 12mm thick plastering for walls using CM 1:6. (07 Marks) Work v Ye net =I fe 400. mm. S.W. Pipe — Iron Foot Stops wo J) sepe ving ick Wor with 418 Cement motat 3 0f3 — \pen

You might also like