Professional Documents
Culture Documents
CONJUNTO RESIDENCIA
REPARACIONES CORRESPONDIE
2. REPARACIÓN ANTEJARDÍN
2.1 TRIRURADO
2.1.1 Triturado de Grava
2.1.2 Acarreo de triturado
2.2 TUBERÍAS PVC PARA DRENAJE
2.2.1 PVC 3" presión
2.2.2 Uniones para tubería PVC 3"
2.2.3 Tee Para tubería PVC 3"
2.2.4 Codos de 45° para Tubería PVC 3"
2.2.5 Pegante PVC
2.3 GEOMEMBRANA - IMPERMEABILIZACIÓN
3.3.1 IMPERMAX 5.500 negra
3.3.2 Geotextil
2.4 REFUERZO
2.4.1 Acero de refuerzo
3. ESTRUCTURA
3.1 ESTRUCTURA EN CONCRETO
3.1.1 Concreto columna de confinamiento f'c = 21 Mpa
3.1.2 Concreto viga de confinamiento f'c = 21 Mpa
3.2 REFUERZO
3.2.1 Acero de refuerzo longitudinal
3.2.2 Acero de refuerzo transversal
4. MAMPOSTERÍA
4.1 MUROS
4.1.1 Muros en bloque de concreto (0,10m)
5. PAÑETES
5.1 Pañete en mortero impermeable
6. ACABADOS
6.1 Acabados en estuco
6.2 Pintura sobre muros
7. PISOS
7.1 Piso en cerámica baño
8. CUBIERTA
8.1 Cubierta en Teja ondulada fibrocemento, pend = 20%
8.1 Caballete
8.1 Solera
9. REDES HIDROSANITARIAS
9.1 INSTALACIONES HIDRÁULICAS
9.1.1 Tubería de agua fría, presión rde 21 ø=1/2"
9.1.2 Válvulas (Paso, cheque y corte)
9.1.3 Uniones
9.2 ACOMETIDAS
9.2.1 Suministro e instalación válvula de cheque
9.2.2 Suministro e instalación válvula de corte
9.2.3 Suministro e instalación medidor
9.3 INSTALACIONES SANITARIAS Y DE AGUAS LLUVIAS
9.3.1 Salida saniraria 2"
9.3.2 Salida sanitaria 4"
9.3.4 Suministro e instalación PVC S 2"
9.3.5 Suministro e instalación PVC S 4"
9.3.6 Suministro e instalación PVC LL 2"
9.3.7 Tubería de ventilación hasta cubierta
9.3.8 Bajantes Aguas lluvias ø=3"
9.3.9 Cajas de inspección
9.4 APARATOS SANITARIOS Y ACCESORIOS
9.4.1 Suministro e instalación sanitario tipo trevi
9.4.2 Suministro e instalación lavamanos tipo Avanti
9.4.3 Suministro e instalación ducha cromada con mezclador
9.4.4 Suministro e instalación mesón en concreto
9.4.5 Suministro e instalación división
9.4.6 Suministro e instalación lavadero prefabricado granito
9.4.7 Suministro e instalación lavaplatos
COSTOS DIRECTOS
Administración %
Imprevisto %
Utilidad %
IVA sobre la utilidad %
TOTAL A.I.U %
OBSERVACIONES
GENERALES:
Se incluyen en los costos,
UBICACIÓN DEL
PROYECTO Este proyecto se construirá en ZONA RURAL, en
El Municipio es considerado de nivel Intermedio, se cuenta con b
ÁREA Const
Elaboró: Daniel Alonso Gutiérrez Rincón
LISTADO DE ÍTEMS
m 61 $829.00 $50,569.00
m2 61 $3,631.00 $221,491.00
m2 61 $29,947.00 $1,826,767.00
m2 61 $3,158.00 $192,638.00
m2 32.2 $2,800.00 $90,160.00
SUBTOTAL $2,381,625.00
m3 1 $47,000.00 $47,000.00
Un 1 $15,000.00 $15,000.00
m 12 $16,416.67 $197,000.00
un 2 $5,000.00 $10,000.00
un 1 $11,500.00 $11,500.00
un 2 $16,000.00 $32,000.00
un 1/4 $130,000.00 $32,500.00
m2 61 $58,427.00 $3,564,047.00
m 6.1 $56,000.00 $341,600.00
m 6.1 $60,754.00 $370,599.40
SUBTOTAL $4,276,246.40
UN 2 $89,003.00 $178,006.00
UN 1 $91,019.00 $91,019.00
UN 1 $119,944.00 $119,944.00
UN 12 $17,080.00 $204,960.00
UN 4 $25,049.00 $100,196.00
m 10 $36,288.00 $362,880.00
m 6 $15,239.00 $91,434.00
m 3 $22,424.00 $67,272.00
m 3.5 $22,127.00 $77,444.50
m 2 $22,127.00 $44,254.00
UN 1 $302,065.00 $302,065.00
UN 1 $472,075.00 $472,075.00
UN 1 $211,530.00 $211,530.00
UN 1 $141,885.00 $141,885.00
UN 1 $427,298.00 $427,298.00
UN 1 $250,000.00 $250,000.00
UN 1 $251,813.00 $251,813.00
UN 1 $345,678.00 $345,678.00
SUBTOTAL $4,619,080.26
UN 10 $74,207.00 $742,070.00
UN 10 $80,586.00 $805,860.00
UN 10 $80,144.00 $801,440.00
UN 20 $15,674.00 $313,480.00
UN 10 $48,259.00 $482,590.00
UN 2 $17,234.00 $34,468.00
UN 10 $10,965.00 $109,650.00
UN 1 $25,643.00 $25,643.00
UN 1 $667,315.00 $667,315.00
UN 1 $347,649.00 $347,649.00
m 2 $22,357.00 $44,714.00
SUBTOTAL $4,374,879.00
UN 1 $523,899.00 $523,899.00
UN 1 $492,885.00 $492,885.00
UN 1 $478,954.00 $478,954.00
UN 1 $487,986.00 $487,986.00
10 0.1 $5,826,500.09
1 0.01 $582,650.01
4 0.04 $2,330,600.03
2 0.02 $1,165,300.02
17 0.17 $9,905,050.15
$68,170,051.02
truirá en ZONA RURAL, en un lote destinado para tal fin. Esta localizado a 7 KM de la cabecera Municipal.
Intermedio, se cuenta con buena disponibilidad de recursos, con buena infraestructura comercial y desarrollo tecnológico.
Construida : 37.20 m2, Futura : 22.80 m2
Gutiérrez Rincón Fecha: 04/03/2019
P-01
Pág 1 de 1
Valor Total
$50,569.00
$221,491.00
$1,826,767.00
$192,638.00
$90,160.00
$2,381,625.00
$47,000.00
$15,000.00
$197,000.00
$10,000.00
$11,500.00
$32,000.00
$32,500.00
$120,045.50
$6,030.00
$2,516,400.00
$2,987,475.50
$863,813.56
$634,233.71
$2,292,651.36
$2,296,239.23
$6,086,937.86
$5,895,068.03
$5,895,068.03
$3,592,145.00
$3,592,145.00
$14,050,982.43
$7,093,146.32
$21,144,128.75
$168,053.11
$168,053.11
$3,564,047.00
$341,600.00
$370,599.40
$4,276,246.40
$158,006.76
$588,000.00
$133,320.00
$178,006.00
$91,019.00
$119,944.00
$204,960.00
$100,196.00
$362,880.00
$91,434.00
$67,272.00
$77,444.50
$44,254.00
$302,065.00
$472,075.00
$211,530.00
$141,885.00
$427,298.00
$250,000.00
$251,813.00
$345,678.00
$4,619,080.26
$742,070.00
$805,860.00
$801,440.00
$313,480.00
$482,590.00
$34,468.00
$109,650.00
$25,643.00
$667,315.00
$347,649.00
$44,714.00
$4,374,879.00
$523,899.00
$492,885.00
$478,954.00
$487,986.00
$636,487.50
$86,562.30
$32,588.16
$2,739,361.96
5,000.87
pal.
arrollo tecnológico.
019