Cumulative Consolida
Time Degree of Consolidatio Consolidation
Height of tion 1.6
(months) Consolidation n Settlement Settlement
Embankment Period
(mm) (mm)
(Months)
1 3.0 1 0.0779 31.49 223.621 486.402
2 6.0 2 0.1557 44.54 316.248 393.775
Time after
constructi Total Estimated Remaining 350.000
Time Degree of
on of Consolidation Consolidation Consolidatio
Remaining Consolidation Settlement