You are on page 1of 1
Pakistan Water And Power Development Authority (WAPDA) ‘® 92-42-99202868 2 General Manager/ PD 92-42-99202869 Mohmand Dam Hydropower Project, 92-42.99202211-2008 WAPDA, 8-Wapda House, Liaison gampdmdhp@gmail.com Office, Wapda House, Lahore No. GM/PD(MDHP)/Works/ tu — Ja tes Dated: June 24, 2019 Chief Engineer/ PD (wMsc) Irrigation and Power Department, Old Anarkali, Lahore, Subject! MOHMAND DAM HYDROPOWER PROJECT — CONSULTANTS VISIT TO PHYSICAL MODELS AT IRRIGATION RESEARCH INSTITUTE (IRI) NANDIPUR Kindly be apprised that Physical models for the Spillway, Low Level Outlet and Flushing Outlet of Mohmand Dam were prepared during detailed engineering design phase. These models were tested and are being maintained at the Irrigation Research Institute, The Mohmand Dam Consultants Group (MDCG) have requested to visit the IRI Nandipur on June 25, 2019 at 1100 hrs for physical inspection of models. Its therefore requested to kindly advise the concemed to facilitate the Consultants Visit at the said date, please. jer/ PD (MDHP) Javed Afridi) Copy to: 1. General Manager (Hydro Planning), WAPDA, Sunny View, Lahore. 2. Chief Engineer-II (Hydro Planning), WAPDA, Sunny View, Lahore. 3. Project Manager (MDHP), NESPAK House, 1-C, Block-N, Model Town Extension, Lahore.

You might also like