Total Load

SL.No. Description Area (Ft2) W/ft2 QTY Load (W) (KW)


1 Office General Load 4,304 3 2 12,912 25.82

2 Computers 20 500 10.00


3 AC 10 1000 10.00

4 External Lighting at yard 50 500 25.00


5 Storage 20 300 6.00
6 Parking 20 300 6.00
7 Misc Load 1 1000 1.00

Equipment/Tools
8 Compressor 10 1500 15.00
9 Battery Charger 10 700 7.00
10 Welder 10 9000 90.00
11 Drill 10 600 6.00

Total Connected Load 201.82


Additional 10% Load 20.18
Required Temporary Generator KW 222.01
Required Temporary Generator KVA 277.51

Note: