You are on page 1of 8
Republic of the Philippines Department of Environment and Natural Resources ENVIRONMENTAL MANAGEMENT BUREAU DDENR Compound, Visayas Avenue, Diliman, Quezon City 1116 Telephone Nos.: 927-15-17, 928-20-96 Email : emb@emb.gov.ph Visitus at hitpwwn.emb goxph i OCT 13-205 ECC-CO-1412-0029 Mr. Angelito U. Lantin President Atimonan One Energy, Inc. (A1E) 8F Rockwell Business Center I Ortigas Ave., Pasig City SUBJECT: ENVIRONMENTAL COMPLIANCE CERTIFICATE Dear Sir: This refers to the Environmental Compliance Certificate (ECC) application for the proposed Coal - Fired Power Plant Project to be located at Barangay Villa Ibaba, Municipality of Atimonan, Quezon Province After satisfying the requirements of PD No. 1586 and its implementing rules and regulations, the Environmental Management Bureau (EMB) of this Department, has decided to grant an ECC for the above-mentioned project. With the issuance of this ECC, you are expected to fully implement the measures presented in the Environmental Impact Statement (EIS) and the Environmental Management and Monitoring Plan (EMMoP), intended to protect and mitigate the project’s adverse impacts on community health, welfare and the environment. Environmental considerations shall be incorporated in all phases and aspects of the project. However, you may proceed with the project, implementation only after securing all the necessary permits from other pertinent Government agencies. This Office shall be strictly monitoring the project periodically to ensure your compliance with stipulations cited in the attached ECC. Please be guided accordingly. Very truly yours, By the Authority of the Secretary: MIGUEL T. CUNA tant Secretary and Concurrent Director LOU ~ Province of Quezon “GU ~ Municipality of Atimonan CU Beg Vila aba, Aumonan bon DENR- FMB Environmental Compliance Certificate Coal ~Fited Power Plant Project ‘Atumonan One Energy, Inc Protect the environment... Protect life Republic of the Philippines Department of Environment and Natural Resources ENVIRONMENTAL MANAGEMENT BUREAU DENR Compound, Visayas Avenue, Diliman, Quezon City 1116 Telephone Nos. 927-15-17, 928-20-98, Email: emb@emb.gov.ph Visit us at itp: emb gov ph KS ENVIRONMENTAL COMPLIANCE CERTIFICATE (Issued under Presidential Decree No. 1586) ECC-CO-1412-0029 THIS IS TO CERTIFY THAT THE PROPONENT, Atimonan One Energy, Inc., as represented by its President, Mr. Angelito U. Lantin, is granted this Environmental Compliance Certificate (ECC) for the proposed Coal - Fired Power Plant Project to be located at Barangay Villa Ibaba, Municipality of Atimonan, Quezon Province by the Department of Environment and Natural Resources (DENR) through the Environmental Management Bureau (EMB). SUBJECT ONLY to the conditions and restrictions set in this ECC and in the attached documents labeled as Annexes A and B with the following details: PROJECT DESCRIPTION ‘The Certificate shall cover Coal ~ Fired Power Plant Project with a capacity of one thousand two hundred megawatts (1200 MW) to be constructed and operated within the one hundred thirty (130) hectares land area in Barangay Villa Ibaba, Atimonan, Quezon using Pulverized Coal Technology with the following facilities: Major Components > 2 units x 600 MW pulverized coal (PC) boiler 2 units x 600 MW steam turbine 2 units x 600 MW generator Electrical systems (lighting, distributed control system, transformer and substation, emergency diesel generator) Fuel oil tank Coal handling system with enclosed conveyors Coal stockyard with wind fences Coal stacker/reclaimer Ash handling and disposal system Cooling water system Water supply system Fire protection system Auxiliary Steam System (Auxiliary Boiler) vvy VVVVVVVVY ‘Support Facilities Pollution control system: Electrostatic precipitator, seawater flue gas desulfurizer, stack, continuous emission monitoring system, wastewater treatment plant Access road > Buildings © Bachelor's offices and quarters (BOQ) © Workshop, warehouse and motorpool © Administration building, car parking area and gatehouse/guardhouse | © Temporary housing facility © Sampling laboratory > Coal unloading jetty approximately 600 meter long, single berth for 80,000 DWT Panamax Vessel > Marine offloading facility approximately 300 meter long, with a 35 meter x 25 meter pad at the end of the facility for vessels with up to 4 meters draft requirement Environmental Compliance Certificate Coat Pred Power Plat Pret 5 ma oe Protect the environment... Motect life Page 20F 8 This Certificate is issued in compliance with the requirements of Presidential Decree No. 1586 and in accordance with DENR Administrative Order No. 2003-30. Non-compliance with any of the provisions of this Certificate shall be a sufficient cause for its cancellation and/or imposition of a fine in an amount not to exceed Fifty Thousand Pesos (P50,000.00) for every violation thereof and shall be without prejudice to imposition of fines and penalties under other environmental laws, rules and regulations. The EMB, however, is not precluded from reevaluating, and correcting any deficiencies or errors that may be found after issuance of this Certificate Issued at DENR, Quezon City, Philippines, this OCT 1320 Recommending Afproval: Approved by the Authority of the Secretary: ATTY. MICHAE]| DRAKE P. MATIAS ATTY. JUAN MIGUEL T. CUNA OIC Chief, EIA Mhnagement Division DENR Asistant Secretary and Concurrent Director STATEMENT OF ACCOUNTABILITY Atimonan One Energy, Inc., proponent of this 2 x 600 MW Coal Fired Power Plant Project, located at Barangay Villa Ibaba, Atimonan, Quezon, hereby represented by Mr. Angelito U. Lantin, President, takes full responsibility in complying with all conditions in this Environmental Compliance Certificate (ECC) TIN 06444 TH 60D Subscribed and sworn to before me this Or is aw above-named affiant taking oath presenting, issued on at , the Notary Public Doc. No. _34B Page No, SI Book No. 5, - Series of _ 2] 217 @oue20is), FOL WO, 5343/18 WO. CPs! 04-07-15 MAKATI CHAPTER PIR NO. 08096 0 03.1213 BASIS CITY 8° FLOOR LOPEZ sLDU. ORTIGAS AVENUE, PSIG CTY Environmental Compliance Certificate Coal Fited Power Plant Project [Atimonan One Energy, Ine Page 3.0f8

You might also like