Professional Documents
Culture Documents
ABT
ABT
alon
Balancing of generation and load demand is an important task as excess generation results in unnecessary high frequency and
to have reliable and quality supply a suitable tariff mechanism needs to be in place so as to send the commercial signals to the
ABT is a scheme of tariff for central generators as well as tariff for deviations in SEB drawals
ABT incentives grid discipline and reliability of supply through frequency linked pricing mechanism
onal grid operation in india along with the development of SEM for implementation of ABT
unnecessary high frequency and shortage of generation results in low ferquency, hence poor quality of power suply