You are on page 1of 1

Engineering Consultant : Contractor : Prepared by: Approved by : Consultant Drawing Title : Drawing No.

: WK/SD/CSD2/
MINISTRY OF PUBLIC WORKS & HOUSING CECI In Collaboration with Contractor D.01-PRP-02a
SHOP PT. DAYA CREASI MITRAYASA METALURGICAL CORPORATION OF TYPICAL CROSS SECTION OF REALIGNMENT
Ref. Dwg :
GENERAL DIRECTORATE OF HIGHWAY CILEUNYI - SUMEDANG - DAWUAN TOLL WAY REGENCY ROAD PANYIRAPAN
PT. INDRA KARYA (Persero) CHINA Ltd.-WIKA-NINDYA-WASKITA
DRAWING Sumedang Sub-Provincce, West Java PT. PARAMA KARYA MANDIRI STA. 0+650 ~ 0+726.93
DIRECTORATE OF TOLLWAY AND URBAN ROAD PT. CIRIATAMA NUSAWIDYA CONSULT Wahyu Ahmadi Chen, Shyh - wen .................................... Scale : As Shown
JOINT OPERATION
PT. SEECONS Deputi GS Team Leader Professional engineer Rev. :

0+700
8.000

1.000 3.000 3.000 1.000


1.5

0.840 0.840
1

1.5
1

Bidang persamaan
EXISTING

ELEVASI TANAH ASLI (m)

JARAK (m)
RENCANA

ELEVASI

JARAK (m)

Tyipical Cross Section Realignment


Scale 1:200

8.000

1.000 3.000 3.000 1.000

0.840 0.840

Detail Tyipical Cross Section Detail Side Ditch (Concrete U-Ditch 60x60 cm)
Scale 1:75 Scale 1:20

You might also like