DAFTAR HARGA SATUAN

BAHAN DAN UPAH

#REF! #REF!
#REF! #REF! BJM

No URAIAN HARGA ( Rp ) SATUAN


###
I. HARGA SATUAN BAHAN ###

1 Papan bouwplank 3/20 1,800,000.00 m3


2 Kayu balok ulin 6,500,000.00 m3
3 Kayu balok Merant 3,000,000.00 m3
4 Kayu balok lanan 3,000,000.00 m3
5 Papan Kayu Ulin 7,000,000.00 m3
6 Papan Kayu merant 3,500,000.00 m3
7 Papan kayu kelas 2 + balok 5/7 (bekistng) 1,650,000.00 m3
8 Galam dia. 10 - 12 cm panjang 4 m 13,500.00 Btg
9 Galam dia. 10 - 12 cm panjang 7 m 19,500.00 Btg
10 Minyak Bekistng 3,000.00 Ltr
11 Paku rupa-rupa (2"-5") 20,000.00 kg
12 Paku sekrup 38,700.00 kg
13 Paku ant karat 25,000.00 kg
14 Paku Plywood 20,000.00 kg
15 Paku Payung 25,000.00 kg
16 Paku Ulin 30,000.00 kg
17 Tanah urug 100,000.00 m3
18 Pasir urug 110,000.00 m3
19 Pasir pasang 150,000.00 m3
20 Pasir beton 150,000.00 m3
21 Koral/Kerikil cor 300,000.00 m3
22 Sirtu 190,000.00 m3
23 Semen PC 1,200.00 kg
24 Semen warna 2,400.00 kg
25 Kapur 2,600.00 kg
26 Besi beton 11,500.00 kg
27 Besi Propil 15,200.00 kg
27 Kawat beton 21,000.00 kg
28 Wiremesh M6 - 150x150 43,650.79 m2
29 Wiremesh M8 - 150x150 96,800.00 m2
30 Batu belah 15 cm / 20 cm 315,000.00 m3
31 Batu Gunung 320,000.00 m3
32 Bata merah 700.00 bj
33 Plywood 3 mm 54,000.00 lbr
34 Plywood 6 mm 85,000.00 lbr
35 Plywood 9 mm 130,000.00 lbr
36 Gypsum 120 x 240 x 0.4 70,000.00 lbr
37 Gypsum 120 x 240 x 0.9 158,000.00 lbr
38 Air kerja 100.00 ltr
39 Bondeck 0,75mm 155,000.00 m2
40 Scafolding 50,000.00 Set
41 Granit 60/60 235,000.00 m2
42 Granit 60/60 ( warna gelap ) 260,000.00 m2
43 Keramik 60/60 kw. I 117,600.00 m2
44 Keramik 40/40 kw. I 55,000.00 m2
45 Keramik 40/40 kw. I (Kasar) 70,000.00 m2
No URAIAN HARGA ( Rp ) SATUAN
###
46 Keramik 30/30 kw. I 70,000.00 m2
47 Keramik 20/20 (ant selip) Kw. I 65,000.00 m2
No URAIAN HARGA ( Rp ) SATUAN
###
48 Keramik 20/25 Kw. I 70,000.00 m2
49 Plint granit 10 x 60 cm 32,000.00 bh
50 Plint keramik 10 x 60 cm 13,000.00 bh
51 List keramik 8 x 20 cm 8,200.00 bh
52 Kloset Duduk 2,012,000.00 bh
53 Kloset Jongkok 160,000.00 bh
54 Wastafel 200,000.00 bh
55 Kran Air 3/4" 15,000.00 bh
56 Floor drain 24,200.00 bh
57 Seal tape 3,000.00 bh
58 Cat kilap setara avian 57,000.00 kg
59 Cat tembok setara ICI 23,320.00 kg
60 Cat tembok tahan cuaca setara ICI 87,700.00 kg
61 Cat meni kayu 25,000.00 kg
62 Cat meni besi 21,400.00 kg
63 Cat dasar kualitas sedang 20,300.00 kg
64 Minyak cat 7,500.00 ltr
65 Ampelas 7,500.00 lbr
66 Dempul kayu 25,000.00 kg
67 Plamir 22,000.00 kg
68 Kuas 4" 17,000.00 bh
69 Kuas 3" 15,000.00 bh
70 Besi siku 13,200.00 kg
71 Atap genteng metal 0,25 mm standar setara sakura roof 29,000.00 m2
72 Nok model C 40 cm setara atap 25,000.00 bh
73 Seng gelombang (0.03 x 90 x 180) cm 36,000.00 lbr
74 Kaca bening 3 mm 90,000.00 m2
75 Kaca bening 5 mm 150,000.00 m2
76 Kunci tanam 2 slaag 130,000.00 bh
77 Engsel pintu kuningan ( 4") 25,000.00 bh
78 Engsel jendela 3" 22,000.00 bh
79 Kait angin 12,000.00 psg
80 Handel jendela 12,000.00 bh
81 Grendel jendela 10,000.00 bh
82 Espagnolet tanam 125,000.00 psg
83 Gypsum 120 x 240 x 0.6 110,000.00 lbr
84 List gypsum 17,000.00 m1
85 Lapisan dasar ( alkali ) 38,710.00 kg
86 Rangka plafond besi hollow 14,000.00 m'
87 Kawat gantungan ø 5mm 12,000.00 kg
88 Ramset 6,500,000.00 Bh
89 Plaster 30,600.00 Ban
90 Kompon 91,800.00 Zak
91 Beton Ready Mix K-225 995,100.00 m3
92 Cone block Persegi panjang K-300 3,500.00 bh
93 Solar 12,000.00 ltr
94 Minyak Pelumas 32,900.00 ltr
95 Pipa PVC AW 1/2" 4,500.00 m
96 Pipa PVC AW 3/4" 7,800.00 m
97 Pipa PVC AW 1" 8,000.00 m
98 Pipa PVC AW 2" 11,250.00 m
99 Pipa PVC AW 2.5" 20,625.00 m
100 Pipa PVC AW 3" 45,000.00 m
101 Pipa PVC AW 4" 57,500.00 m
No URAIAN HARGA ( Rp ) SATUAN
###
No URAIAN HARGA ( Rp ) SATUAN
###
II. HARGA SATUAN UPAH

1 Pekerja 70,000.00 OH
2 Tukang 75,000.00 OH
3 Kepala Tukang 95,000.00 OH
4 Mandor 95,000.00 OH
BACK UP VOLUME
KEGIATAN #REF!
PEKERJAAN #REF!
LOKASI #REF!
TAHUNG ANGGARAN #REF!

NO. U R A I A N P E K E R J AA N P PE R H ITU N GAN VOL SAT. KET.

I PERSIAPAN
1 Pembersihan Lokasi 12 x 12 144.00 m2
2 Izin Mendirikan Bangunan (IMB) 1 1.00 Paket
3 Papan nama proyek 1 1.00 bh
4 Pengukuran/Pemasangan Bouwplank ( 9 x 2 ) + ( 8 x 2 ) + 49.00 M'
( 3 + 3 + 4 + 2.5 + 2.5 )
II PEKERJAAN PONDASI
1 Galian tanah pondasi p = 49 m ( 0.7 + 0.8 ) x 0.35 x 43 11.29 m3 Dalam
2

p=6m ( 0.6 + 0.7 ) x 0.25 x 6 0.98 m3 Teras


2
Total 12.26 m3

2 Urugan tanah kembali 1 x Galian tanah pondasi 4.09 m3


3

3 Urugan pasir bawah pondasi p =43 m 0.05 x 0.7 x 43 1.51 m3 Dalam


p=6m 0.05 x 0.6 x 6 0.18 m3 Teras
Total 1.69 m3

4 Pas. Pondasi batu kali camp. 1 : 4 p = 43 m ( 0.3 + 0.6 ) x 0.6 x 43 11.61 m3 Dalam
2
p=6m ( 0.25 + 0.5 ) x 0.5 x 6 1.13 m3 Teras
2
Total 12.64 m3

III PEKERJAAN BETON


1 Beton sloof 15/20 p = 43 m 0.15 x 0.2 x 43 1.29 m3 Dalam

2 Beton sloof 15/15 p=6m 0.15 x 0.15 x 6 0.14 m3 Teras

3 Beton kolom 20/20 n = 8 bh 0.2 x 0.2 x 3.7 x 8 1.18 m3

4 Beton kolom 11/11 n = 5 bh 0.11 x 0.11 x 3.7 x 5 0.22 m3 18.5

5 Beton kolom teras 20/20 n = 2 bh 0.2 x 0.2 x 3.7 x 2 0.30 m3

6 Beton balok 15/15 p=6m 0.15 x 0.15 x 6 0.14 m3 Teras

7 Beton ringbalk 11/15 p = 43 m 0.11 x 0.15 x 43 0.71 m3 43

8 Beton geuvel 11/15 p = 4.0 m 0.11 x 0.15 x 4.56 x 4 0.30 m3 18.24


n = 4 bh
IV PEKERJAAN DINDING
1 Pas. Dinding 1/2 bata camp. 1 : 4 3.7 x 43 159.10 m2 Ruangan
n = 2 sisi 0.5 x 8 x 2.21 x 2 17.68 m2 Dinding layar
176.78 m2
Pengurang
n = 8 bh 0.2 x 3.7 x 8 5.92 m2 Kolom 20/20
n = 5 bh 0.11 x 0.11 x 5 0.06 m2 Kolom 15/15
n = 1 bh 1.4 x 2.6 x 1 + 1.48 x 0.5 x 2 5.12 m2 P1
n = 1 bh 0.9 x 2.6 x 1 2.34 m2 P2
n = 5 bh 2.2 x 1.48 x 5 16.28 m2 J1
n = 4 bh 0.6 x 0.31 x 4 + 0.5 0.3 x 0.6 x 0.74 m2 LA
4 30.46 m2
Total 146.32 m2

2 Plesteran dinding camp. 1 : 4 2 x Luas Pas. 1/2 Bata 292.64 m2


Pengurang 0.5 x 8 x 2.21 x 2 17.68 m2 Dinding layar
Total 274.96 m2

3 Plesteran pondasi camp. 1 : 4 p = 50 m 0.25 x 37 9.25 m2

4 Acian Plesteran dinding + plesteran pondasi 284.21 m2

V PEKERJAAN RANGKA ATAP


1 Pek. Kuda-kuda baja ringan p = 11.4 m ( 5.71 + 5.71 ) x 11.4 138.74 m2
( 2.85 + 2.85 ) x 1.5
2 Pek. Atap genteng metal ( 5.71 + 5.71 ) x 11.4 138.74 m2
( 2.85 + 2.85 ) x 1.5
3 Pek. Pamuung genteng metal 9 + ( 2 x 1.2 ) + 3.5 14.90 m'

4 Pek. Talang jurai 1.3 x 2 2.60 m'

4 Pek. Lisplank tampuk kiri & kanan 2 x 2/20 n = 2 sisi ( 5.71 + 5.71 ) x 2 34.24 m'
( 2.85 + 2.85 ) x 2
5 Pek. Lisplank depan & belakang 2 x 2/20 n = 2 sisi ( 9 + ( 2 x 1 )) x 2 22.00 m'

VI PEKERJAAN PLAFOND
1 Pas. Plafond dalam + rangka n = 1 bh 7.8 x 9.8 x 1 76.44 m2 Dalam

2 Pas. Plafond teras + rangka 1.5 x 3 4.50 m2 Teras


1 x 11 x 2 22.00 m2
1 x 11.42 x 2 22.84 m2
Total 49.34 m2

3 Pas. List palfond n = 1 bh ( 8.8 + 8.8 + 7.8 + 7.8 + 14 + 2 49.20 m' Dalam
n = 2 bh ( 9 + 12 ) x 1 21.00 m' Depan/Belakang
n = 2 bh ( 5.71 + 5.71 ) x 1 x 2 22.84 m' Kiri/Kanan
Total 93.04 m'

VII PEKERJAAN LANTAI


1 Urugan tanah bawah lantai n =1 bh 7.8 x 8.8 x 0.3 x 1 20.59 m3 Dalam
n =1 bh 2.8 x 1.5 x 0.3 x 1 1.26 m3 Teras
Total 21.85 m3 Teras Depan

2 Urugan pasir bawah lantai n =1 bh 7.8 x 8.8 x 0.05 x 1 3.43 m3 Dalam


2.8 x 1.5 x 0.05 x 1 0.21 m3 Teras
Total 3.64 m3

3 Cor beton lantai t = 7 cm camp. 1 : 3 : 5 n =1 bh 7.8 x 8.8 x 0.07 x 1 4.80 m3 Dalam


n =1 bh 2.8 x 1.5 x 0.07 x 1 0.29 m3 Teras
Total 5.10 m3

4 Pas. Keramik 40 x 40 n =1 bh 7.8 x 8.8 x 1 68.64 m2 Dalam


3 x 1.5 4.50 m2 Teras
Total 73.14 m2

5 Cor beton rabat t = 5 cm camp. 1 : 3 : 5 p = 26 m 0.6 x 12 x 0.05 0.36 m3 Depan


p = 26 m 0.8 x 11 x 0.05 0.44 m3 Belakang
n = 2 bh 0.8 x 8 x 0.05 x 2 0.64 m3 Kiri/kanan
Total 1.44 m3

6 Pek. Saluran pas. Bata diplester + acian 26.4 + 26.4 + 11.6 + 11.6 76.00 m'

VIII PEKERJAAN KUSEN, PINTU & JENDELA


1 Kusen 6.6 x 1 6.60 m' P1
9.58 x 1 9.58 m' PJ
12.16 x 5 60.80 m' J1
2.1 x 0 0.00 m' LA
76.98 m'

2 Pintu P1 & P2 1 x 2 2.00 bh P1


1 1.00 bh P2
3.00 bh

3 Jendela J1 2 x 5 10.00 Bh

4 Jendela J2 2 x 0 0.00 Bh

5 Pas. Kaca mati n = 7 bh ( 0.60 x 0.85 ) x 7 3.57 m2

6 Pasangan Jalusi 1 1.00 Ls

IX PEKERJAAN PENGGANTUNG
1 Kunci tanam pintu 1 x 2 2.00 bh

2 Engsel Pintu 3 x 3 9.00 bh


3 Engsel jendela 2 x 10 20.00 bh

4 Kail angin 2 x 10 20.00 bh

5 Pegangan jendela 1 x 10 10.00 bh

6 Espanolet 1 x 1 1.00 bh

7 Gerendel jendela 1 x 10 10.00 bh

X PEKERJAAN INSTALASI LISTRIK


1 Instalasi titik lampu + saklar + setop kontak 6 + 1 + 3 + 2 + 1 + 1 14.00 titik
2 Lampu TL 20 watt n = 1 ruang 6 x 1 6.00 bh
3 Lampu SL 8 watt 1 x 1 1.00 bh
4 Stop kontak 1 x 3 3.00 bh
5 Saklar ganda 2 2.00 bh
6 Saklar tunggal 1 1.00 bh
7 MCB 1 1.00 bh

XI PEKERJAAN CAT-CATAN
1 Cat Tembok Luas plesteran dinding 274.96 m2 Dinding
Luas plafon (dalam + luar) 125.78 m2 Palfon
n = 8 bh 0.20 x 3.7 x 2 x 8 11.84 m2 Kolom
412.58 m2

2 Cat Kilap 76.98 x 0.25 19.25 m2 Kusen


n = 3 bh 0.70 x 2 x 2 x 3 8.40 m2 Pintu
n = 12 bh 3.10 x 0.1 x 2 x 10 6.20 m2 J1
56.24 x 0.2 11.25 m2 Listplank
93.04 x 0.05 4.65 m2 List plafond
Total 49.75 m2

Diperiksa / Disetujui : Dibuat / Diajukan Kontraktor :


Pejabat Pelaksana Teknis Kegiatan (PPTK) KONSULTAN PERENCANA
DINAS PENDIDIKAN, PEMUDA DAN OLAHRAGA KAB. TANAH BUMBU CV. FORTTUNER PROJECT CONSULTANT

AMINATUS ALIFAH, ST SYAMSUL ANWAR, ST


NIP. 19801220 200604 2 030 Wakil Direktur
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN BANGUNAN GEDUNG NEGARA

JUMLAH HARGA
NO. URAIAN JENIS PEKERJAAN BAHAN + UPAH
Rp.
1 2 3
A DAFTAR HARGA SATUAN PEKERJAAN BANGUNAN
1 1M' PENGUKURAN DAN PEMASANGAN BOUWPLANK 48,235.00
2 1M2 PEK KANTOR DIREKSI DAN LOS BAHAN 433,351.00
3 1M3 GALIAN TANAH BIASA KEDALAMAN 1 M' 25,960.00
4 1M3 GALIAN TANAH BIASA KEDALAMAN 2 M' 34,078.00
5 1M3 URUGAN TANAH KEMBALI 24,882.00
6 1M3 PEMADATAN TANAH TIAP 20 CM, TANAH DARI LUAR LOKASI 83,589.00
7 1M3 URUGAN PASIR 134,970.00
8 1M3 URUGAN SIRTU 156,365.00
9 1M3 PERKERASAN SIRTU DIPADATKAN SETIAP 20 CM 172,001.00
10 1M1 JEMBATAN SEMENTARA KY. BULAT Ø 30 CM PJG PER BTG 3M' (ASUMSI LEBAR 419,193.00
JEMBATAN 3M' & TANPA TIANG)
11 1M3 LANTAI KERJA / MEMBUAT BETON TUMBUK CAMP. 1 PC : 3 PS : 5 KR 685,646.00
12 1M3 MEMBUAT BETON BERTULANG ( TANPA BESI ) CAMP. 1 PC : 2 PS : 3 KR 969,325.00
13 1KG PEMBESIAN DENGAN BESI POLOS 12,751.00
14 1KG PEMBESIAN DENGAN BESI URIL 14,483.00
15 1KG PEK. ERECTION KONSTRUKSI KUDA-KUDA BESI 1,723.00
16 1KG PEK. KONSTRUKSI BESI SIKU / PROFIL EX. DN 16,518.00
17 1M2 PAS. BEKISTING PAPAN UTK SLOOF 123,860.00
18 1M2 PAS. BEKISTING PAPAN UTK KOLOM 160,176.00
19 1M2 PAS. BEKISTING PAPAN UTK KOLOM STRUKTUR/ BEBAS 260,106.00
20 1M2 PAS. BEKISTING PAPAN UTK BALOK BETON 168,536.00
21 1M2 PAS. BEKISTING PAPAN UTK BALOK STRUKTUR 268,466.00
22 1M2 PAS. BEKISTING PAPAN UTK PONDASI 115,060.00
23 1M2 PAS. BEKISTING PAPAN UTK LANTAI 340,406.00
24 1M2 PAS. BEKISTING PAPAN UTK TANGGA 255,018.00
25 1M2 PAS. STOOTWERK 216,502.00
26 1M3 PAS. PONDASI BATU KOSONG / AANSTAMPING 244,018.00
27 1M3 PAS. PONDASI BATU KALI 1 : 4 449,982.00
28 1M3 PAS. PONDASI BATU KALI 1 : 5 434,747.00
29 1M2 PAS. DINDING KERAMIK CORAK/WARNA UK. 20 x 25 CM 161,337.00
30 1M2 PAS. LANTAI KERAMIK NON SLIP UK. 20 x 20 CM 166,864.00
31 1M2 PAS. LANTAI KERAMIK UKURAN 40 x 40 CM 148,797.00
32 1M2 PAS. DINDING GRANIT TILE 40X40 CM POLIS 385,800.00
33 1M2 PAS. DINDING BATU ALAM ANDESIT + COATING 313,300.00
34 1M2 PAS. BATA MERAH TRASRAAM TEBAL 1/2 BATA 1 PC : 3 PS 108,103.00
35 1M2 PAS. BATA MERAH TEBAL 1/2 BATA 1 PC : 4 PS ( SK SNI T-03-1991-03 ) 104,278.00
36 1M2 PAS. BATA MERAH TEBAL 1/2 BATA 1 PC : 5 PS 101,866.00
37 1M2 PLESTERAN DINDING TRASRAAM 1 PC : 3 PS + ACIAN, T = 15 MM 36,899.00
38 1M2 PLESTERAN DINDING BIASA 1 PC : 5 PS + ACIAN, T = 15 MM 42,921.00
39 1 BUAH BAK KONTROL DARI PAS. BATA UK. 30 x 30 x 35 CM 471,605.00
40 1 UNIT PEK. SEPTICTANK uk. 2,50 x 1,50 x 2,00 M 5,689,575.00
41 1 UNIT PEK. SEPTICTANK uk. 2,00 x 1,50 x 1,50 M 3,959,239.00
42 1 M2 PENGECATAN BIDANG KAYU BARU (3x) BERIKUT MENI 28,413.00
43 1 M2 PENGECATAN DINDING (3x) 23,044.00
44 1 M2 PENGECATAN PLAFOND (3x) 25,945.00
45 1 M2 PLITURAN MEUBULAIR 84,702.00
46 1 M2 PAS. PLAFOND GYPSUM 9 MM BERIKUT RANGKA HOLLOW 112,225.00
47 1 M2 PAS. PLAFOND KALSIBOARD 3.5 MMBERIKUT RANGKA HOLLOW 114,135.00
48 1 M2 PAS. DINDING PARTISI GYPSUM 9 MM BERIKUT RANGKA HOLLOW, 2 MUKA 168,983.00
49 1 M2 PAS. RANGKA PLAFOND KAYU BORNEO SUPER (HANYA RANGKA) 80,448.00
50 1 M1 PAS. LISTPLANK (8 mm/ 20 cm ) GRC 69,300.00
51 1 M2 MEMBUAT DAUN PINTU DOUBLE TEAKWOOD RANGKA KAYU BORNEO SUPER (MELAMIK) 594,099.00
52 1 M2 MEMBUAT DAUN PINTU TEAKWOOD 4 MM & FORMIKA RANGKA KY. BORNEO (KM/WC) 469,480.00
53 1 SET PASANG HANDLE PINTU STAINLESS T=80 CM 428,532.00
54 1 M2 PAS. KACA POLOS 5 MM 98,386.00
55 1 M2 PASANG KACA TEMPERED T= 12MM 830,436.00
56 1 M1 PAS. LIST KACA ALUMUNIUM U 15 MM 33,423.00
57 1 M2 PAS. SANBLAST 74,513.00
58 1 BH PASANG KUNCI KM/WC BULAT 88,376.00
1 2 3
59 1 BH PASANG KUNCI TANAM 2 SLAAG 160,976.00
1 2 3
60 1 BH PASANG KUNCI TANAM 2 SLAAG SILINDER 328,506.00
61 1 BH PASANG ENGSEL PINTU 4" 18,526.00
62 1 BH PASANG ENGSEL JENDELA 3" 8,901.00
63 1 PSG PAS. ESPAGNOLET 59,499.00
64 1 PSG PASANG KAIT/HAK ANGIN JENDELA 60,766.75
65 1 BH PASANG RAAMBUNCIS 35,906.75
66 1 M2 MEMASANG ATAP GELOMBANG SUPER BITUMEN ex. MAHALINE 110,924.00
67 1 M2 PAS. RK. ATAP GENTENG BETON / KERAMIK, KAYU BORNEO KLAS II 76,600.00
68 1 M2 RANGKA ATAP & KUDA-KUDA BAJA RINGAN TERPASANG 203,500.00
69 1 M2 RANGKA ATAP BAJA RINGAN (KASO & RENG) TERPASANG 77,041.00
70 1 M2 MEMASANG ATAP Spandek Zincalume 97,812.00
71 1 M1 MEMASANG BUBUNGAN ATAP METAL ZINCALUME SEKUALITAS RAINBOW ROOF 188,617.00
72 1 M1 MEMASANG TALANG PATAHAN ATAP 149,583.00
73 1 M2 MEMASANG ATAP GENTENG KERAMIK GLAZUR STANDARD 138,786.00
74 1 M' MEMASANG BUBUNG GENTENG KERAMIK GLAZUR 92,880.00
75 1 M1 MEMASANG BUBUNGAN ATAP METAL ZINCALUME SEK. MAHALINE, NOK PANJANG 188,617.00
76 1 M1 MEMASANG BUBUNGAN ATAP ONDUVILLA 193,567.00
77 PAS. 1 BUAH FLOOR DRAIN 26,070.00
78 PAS. 1 BUAH KRAN AIR, DIA 1/2" ATAU DIA 3/4" 78,006.00
79 PAS. 1 BUAH CLOSET Jongkok 321,678.00
80 PAS. 1 BUAH WASTAFEL LENGKAP + CERMIN ( SK SNI Edisi Rev. 2003 ) 1,745,563.00
81 PAS. 1 BUAH URINOIR U 57W 2,067,582.00
82 PAS. 1 BH SEKAT URINOIR A100 - WHITE 708,422.00
83 PAS. 1 BUAH BAK MANDI FIBERGLASS KAP 0,30 M3 ( SK SNI Edisi Rev. 2003 ) 602,470.00
84 PAS. 1 M' PIPA PVC TYPE AW, DIA 1/2" ( SK SNI Edisi Rev. 2003 ) 15,798.00
85 PAS. 1 M' PIPA PVC TYPE AW, DIA 3/4" ( SK SNI Edisi Rev. 2003 ) 19,677.00
86 PAS. 1 M' PIPA PVC TYPE AW, DIA 2 " ( SK SNI Edisi Rev. 2003 ) 70,115.00
87 PAS. 1 M' PIPA PVC TYPE AW, DIA 4" ( SK SNI Edisi Rev. 2003 ) 134,014.00
88 PAS. 1 BUAH BAK CUCI PIRING STAINLESS STEEL STANDARD 1 LUBANG ( SK SNI Edisi Rev. 2003 ) 492,453.00
89 PAS. 1 BH KRAN TEMBOK LOKAL DIA 1/2" ATAU 3/4" ( SK SNI Edisi Rev. 2003 ) 78,006.00
90 PAS. 1 BH FLOOR DRAIN ( SK SNI Edisi Rev. 2003 ) 26,070.00
91 1 M2 PEK. WATERPROOFING 24,468.00
92 1 M' PAS. SALURAN GREVEL U 20 CM + PASANGAN 143,100.00
93 1 M2 PAS. PAVING BLOCK NATURAL, T= 6 CM 85,700.00
94 1 BH PAS. BATA ROOSTER UK. 20 x 20 CM 5,500.00
95 1 BH PAS. GLASS BLOCK DN, UK. 20 x 20 CM 33,100.00
96 1 UNIT PAS. BP LISTRIK 7700 VA 6,564,200.00
97 1 UNIT PAS. BP LISTRIK 23000 VA 20,588,200.00
98 1 BH PAS. MCB 1 PHASE 52,500.00
99 1 BH PAS. MCB 3 PHASE 66,300.00
100 INSTALASI TITIK LAMPU / STOP KONTAK 167,400.00
101 1 BH LAMPU DOWN LIGHT + SL 25 WATT 358,700.00
102 1 BH LAMPU TL IN BOW 2X40 WATT 275,800.00
103 1 BH BARET 30 CM + NEON 243,700.00
104 1 BH LAMPU SL 25 WATT 156,700.00
105 1 BH LAMPU PIJAR 25 WATT 16,500.00
106 1M2 PASANG PAGAR BESI HOLLOW 440,000.00
107 1 M2 PASANG RAILING TANGGA STAINLESS TERPASANG 715,000.00
108 1 UNIT PEMBUATAN SUMUR BOR KEDALAMAN S/D 40 M' + CASSING PIPA 16,000,000.00
109 1 BH PAS WATER TANK KAP. 1000 LTR 1,247,100.00
110 1 UNIT POMPA JET PUMP 500 WATT 5,359,200.00
111 1 UNIT EXHOUSE FAN 145 W uk. 45 x 45 cm 385,000.00
112 1 UNIT KOLOM BETON 25/25 UNTUK PINTU ENTRANCE + DILAPIS PLAT ALUM./STAINLESS 30/30 3,518,800.00
113 1 UNIT TOWER AIR DARI BESI SIKU 50.50.5 + PONDASI, TINGGI 7 M' 5,236,000.00
114 1 UNIT TOWER AIR DARI BESI SIKU 50.50.5 + PONDASI, TINGGI 3 M' 2,750,000.00
115 1 UNIT FILTER AIR 4,950,000.00
116 1 M3 PEK. BONGKARAN DINDING BATA ( analisa BOW ) 59,900.00
117 1 M2 PEK. BONGKARAN RANGKA ATAP ( analisa BOW ) 4,000.00
118 1 M2 PEK. BONGKARAN ATAP GENTENG ( analisa BOW ) 2,000.00
119 1 M3 PEK. BONGKARAN BALOK GELAGAR / KUDA-KUDA T = 3,50 M 250,800.00
120 1 M2 PEK. BONGKARAN PLAFOND ( analisa BOW ) 7,300.00
121 1 M1 PAS. LIST GYPSUMP C7 16,215.00
122 1 KG PEKERJAAN BAJA IWF EX DN 26,092.00
123 1 KG MEMASANG PLAT BESI 6 MM 22,022.00
1 2 3

B DAFTAR HARGA SATUAN PEKERJAAN BETON


1 1 M3 MEMBUAT BETON READY MIX MUTU K 225 (Pompa + Selang) 900,240.00
2 1 M3 PEK. BETON SLOOF S1 20/30, TUL. = 121.5KG. ( 6D 12+ dia 8 - 20 ) 3,378,460.00
3 1 M3 PEK. BETON SLOOF S2 15/25, TUL. = 136.533 KG. ( 4 D 10 + dia 8 - 20 ) 3,879,803.00
4 1 M3 PEK. BETON SLOOF S3 15/20, TUL. = 128.16667 KG. ( 4 D 10 + dia 8 - 20 ) 3,773,118.00
5 1 M3 PEK. BETON KOLOM K1 25/40, TUL. = 151.75 KG. ( 8 D 16 + dia 8 - 20 ) 4,396,955.00
6 1 M3 PEK. BETON KOLOM K2 20/30, TUL. = 121.5KG. ( 8 D 12 + dia 8 - 20 ) 4,451,717.00
7 1 M3 PEK. BETON KOLOM K3 15/25, TUL. = 184 KG. ( 6 D 12 + dia 8 - 20 ) 5,809,284.00
8 1 M3 PEK. BETON KOLOM PRAKTIS 15/15, TUL. = 162.222 KG. ( 4 dia 10 + dia 8 - 20 ) 5,691,251.00
9 1 M3 PEK. BETON KOLOM / RINGBALK PRAKTIS 12/12, TUL. = 177.766 KG. ( 4 dia 8 + dia 8 - 20 ) 5,238,133.00
10 1 M3 PEK. BETON KOLOM ENTRANCE 20/20, TUL. = 144 KG. ( 4 D 10 + dia 8 - 20 ) 5,388,540.00
11 1 M3 PEK. BETON KOLOM K2 25/25, TUL. = 133.12 KG. ( 4 D 12+ dia 8 - 20 ) 5,230,957.00
12 1 M3 PEK. BETON KOLOM K1A 25/35, TUL. = 108.114 KG. ( 8 D 12 + dia 8 - 20 ) 4,113,664.00
13 1 M3 PEK. BETON KOLOM K3A 15/25, TUL. = 184 KG. ( 6D 12 + dia 8 - 20 ) 6,128,064.00
14 1 M3 PEK. BETON KOLOM K4 15/20, TUL. = 128.17 KG. ( 4D 10 + dia 8 - 20 ) 5,559,656.00
15 1 M3 PEK. BETON BALOK B1 25/50, TUL. = 186.96KG. (7 D 19, 2 D 13,2D12 + dia 8 - 15 ) 4,872,136.00
16 1 M3 PEK. BETON BALOK B2 20/35, TUL. = 142.571 KG. ( 8 D 12 + dia 8 - 15 ) 4,590,375.00
17 1 M3 PEK. BETON BALOK B3 20/40, TUL. = 152.25 KG. ( 7 D 13, 2 D 12 + dia 8 - 15 ) 4,685,413.00
18 1 M3 PEK. BETON BALOK B4 15/30, TUL. = 170.667 KG. ( 6 D 12 + dia 8 - 15 ) 5,478,831.00
19 1 M3 PEK. BETON BALOK B5 20/30, TUL. = 162 KG. ( 8 D 12 + dia 8 - 15) 4,931,964.00
20 1 M3 PEK. BETON BALOK B6 15/25, TUL. = 160.267 KG. ( 5 D 102+ dia 8 - 20 ) 5,412,468.00
21 1 M3 PEK. BETON RING BALOK (B-7) 15/20 , TUL. = 128.17 KG. ( 4 D 10 + dia 8 - 20 ) 5,073,944.00
22 1 M3 PEK. BETON RING BALOK 20/20, TUL. = 101 KG. ( 4 D 10 + dia 8 - 20 ) 4,259,129.00
23 1 M3 PEK. BETON LINTEL 12/12, TUL. = 173.333 KG. ( 4 D 8+ dia 8 - 20 ) 6,570,807.00
24 1 M3 PEK. BETON BALOK LISTPLANK BL 7/50, TUL. = 195 KG. ( 5 D 8 + dia 8 - 20 ) 7,588,862.00
25 1 M3 PEK. BETON PLAT T = 10 CM, TUL. = 78 KG.(dia 8-15)-1 Lapis 3,248,667.00
26 1 M3 PEK. BETON PLAT T = 12 CM, TUL. = 86.667 KG. ( dia 8-15) / RANGKAP 3,409,814.00
27 1 M3 PEK. BETON PLAT 1,05 x 1,20 x 0,30 , TUL. = 68.18 KG. (D 12 - 15) 2139799
28 1 M3 PEK. BETON PLAT 1,05 x 1,20 x 0,30 , TUL. = 43.864 KG. (D 12 - 15) 1730424
1 2 3
C DAFTAR HARGA SATUAN PEKERJAAN KUSEN
1 1M' KUSEN ALUMUNIUM 4" 114,633.00
2 1M' DAUN JENDELA ALUMUNIUM SWING 147,935.00
3 1 UNIT PINTU KACA TEMPERED TYPE - PE uk. 90x240x2 (2 DAUN) 14,288,818.00
4 1 UNIT KUSEN ALUMUNIUM 4" + DAUN PINTU Rangka Alumunium,Panel teakwood Lapis Megatic TYPE P1 8 3,953,136.00
5 1 UNIT KUSEN ALUMUNIUM 4" + DAUN PINTU Rangka Alumunium,Panel teakwood Lapis Megatic TYPE P2 8 7,217,786.00
6 1 UNIT KUSEN +PINTU PVC TYPE P3 70 * 190 ( 1 DAUN ) 290,400.00
7 1 UNIT KUSEN ALUMUNIUM 4" + DAUN PINTU Rangka Alumunium,Panel teakwood Lapis Megatic TYPE P1' 3,590,276.00
8 1 UNIT KUSEN ALUMUNIUM 4" + DAUN PINTU Lemari Gudang 60 * 210 ( 2 DAUN ) 3,590,276.00
9 1 UNIT KUSEN ALUMUNIUM + TYPE BV-1 562,114.00
10 1 UNIT KUSEN ALUMUNIUM + TYPE BV-2 1,047,309.00
11 1 UNIT KUSEN ALUMUNIUM + TYPE BV-3 1,678,818.00
12 1 UNIT KUSEN ALUMUNIUM + TYPE BV-4 2,025,266.00
13 1 UNIT KUSEN ALUMUNIUM 4" + JENDELA TYPE J1 (1 DAUN) 1,266,945.00
14 1 UNIT KUSEN ALUMUNIUM 4" + JENDELA TYPE J2 (2 DAUN) 2,357,356.00
15 1 UNIT KUSEN ALUMUNIUM 4" + JENDELA TYPE J3 (2 DAUN) 3,184,948.00
16 1 UNIT KUSEN ALUMUNIUM 4" + JENDELA TYPE J4 (2 DAUN) 3,740,087.00
17 1M' JALUSI ALUMUNIUM 46,200.00
18 1 BH PINTU P1 UKURAN 0.8X2.10 2,702,186.00
19 1 BH PINTU P1 UKURAN 0.6X2.10 1,887,367.00
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
BIDANG CIPTA KARYA
TAHUN 2016

HARGA SATUAN PEKERJAAN PERSIAPAN

1.1 Pembuatan 1 M 2 pagar sementara dari kayu tinggi 2 meter


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Kayu L.02 OH 0.200 75,000.00 15,000.00
kepala Tukang L.03 OH 0.020 95,000.00 1,900.00
Mandor L.04 OH 0.020 95,000.00 1,900.00
JUMLAH TENAGA KERJA 46,800.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm batang 1.250 13,500.00 16,875.00
semen portland kg 5.000 1,200.00 6,000.00
Pasir beton m3 0.005 150,000.00 750.00
Koral beton m3 0.009 300,000.00 2,700.00
Kayu 5/7 m3 0.072 1,650,000.00 118,800.00
Paku biasa 2" - 5" kg 0.060 20,000.00 1,200.00
Residu liter 0.400 2,000.00 800.00
JUMLAH HARGA BAHAN 147,125.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 193,925.00


E Overhead & Profit 10% x D 19,392.50
F Harga Satuan Pekerjaan (D+E) 213,317.50

1.2 Pembuatan 1 M 2 pagar sementara dari seng gelombang tinggi 2 meter


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang Kayu L.02 OH 0.400 75,000.00 30,000.00
kepala Tukang L.03 OH 0.020 95,000.00 1,900.00
Mandor L.04 OH 0.020 95,000.00 1,900.00
JUMLAH TENAGA KERJA 47,800.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm batang 1.250 13,500.00 16,875.00
semen portland kg 2.500 1,200.00 3,000.00
seng gelombang lbr 1.200 36,000.00 43,200.00
pasir beton m3 0.005 150,000.00 750.00
koral beton m3 0.009 300,000.00 2,700.00
kayu 5/7 m3 0.072 1,650,000.00 118,800.00
paku biasa 2"-5" kg 0.060 20,000.00 1,200.00
mani besi liter 0.450 0.00
JUMLAH HARGA BAHAN 186,525.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 234,325.00


E Overhead & Profit 10% x D 23,432.50
F Harga Satuan Pekerjaan (D+E) 257,757.50
1.3 Pembuatan 1 M 2 pagar sementara dari kawat duri tinggi 1,8 meter
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang Kayu L.02 OH 0.300 75,000.00 22,500.00
kepala Tukang L.03 OH 0.020 95,000.00 1,900.00
Mandor L.04 OH 0.020 95,000.00 1,900.00
JUMLAH TENAGA KERJA 40,300.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm batang 1.000 13,500.00 13,500.00
semen portland kg 2.000 1,200.00 2,400.00
kawat duri m' 25.000 36,000.00 900,000.00
pasir beton m3 0.005 150,000.00 750.00
koral beton m3 0.009 300,000.00 2,700.00
paku biasa 2"-5" kg 0.060 1,650,000.00 99,000.00
JUMLAH HARGA BAHAN 1,018,350.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 1,058,650.00


E Overhead & Profit 10% x D 105,865.00
F Harga Satuan Pekerjaan (D+E) 1,164,515.00

1.4 Pengukuran dan pemasangan 1 M 1 Bouwplank


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Kayu L.02 OH 0.100 75,000.00 7,500.00
kepala Tukang L.03 OH 0.010 95,000.00 950.00
Mandor L.04 OH 0.005 95,000.00 475.00
JUMLAH TENAGA KERJA 15,925.00
B BAHAN
Kayu balok 5/7 m3 0.006 1,800,000.00 10,800.00
Paku 2"-3" kg 0.020 20,000.00 400.00
kyu papan 3/20 m3 0.007 3,500,000.00 24,500.00
JUMLAH HARGA BAHAN 35,700.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 51,625.00


E Overhead & Profit 10% x D 5,162.50
F Harga Satuan Pekerjaan (D+E) 56,787.50
1.5 Pembuatan 1 M 2 kantor sementara lantai plesteran
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 2.000 70,000.00 140,000.00
Tukang Kayu L.02 OH 2.000 75,000.00 150,000.00
Tukang batu L.02 OH 1.000 75,000.00 75,000.00
kepala Tukang L.03 OH 0.300 95,000.00 28,500.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
JUMLAH TENAGA KERJA 398,250.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm batang 1.250 0.00
kayu m3 0.180 0.00
paku biasa kg 0.080 0.00
besi strip kg 1.100 0.00
semen portland kg 35.000 1200 42,000.00
pasir pasang m3 0.150 0.00
pasir beton m3 0.100 150000 15,000.00
koral beton m3 0.150 300000 45,000.00
bata merah bh 30.000 0.00
seng plat lbr 0.250 0.00
jendela naco bh 0.200 0.00
kaca polos m2 0.080 0.00
kunci tanam bh 0.150 0.00
plywood 4mm lbr 0.060 0.00
JUMLAH HARGA BAHAN 102,000.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 500,250.00


E Overhead & Profit 10% x D 50,025.00
F Harga Satuan Pekerjaan (D+E) 550,275.00

1.6 Pembuatan 1 M 2 rumah jaga (konstruksi kayu)


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 70000 70,000.00
Tukang Kayu L.02 OH 1.500 75000 112,500.00
kepala Tukang L.03 OH 0.150 95000 14,250.00
Mandor L.04 OH 0.050 95000 4,750.00
JUMLAH TENAGA KERJA 201,500.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm btg 3.000 13500 40,500.00
kayu m3 0.276 0.00
paku biasa kg 0.700 0 0.00
seng gelombang lbr 1.500 36000 54,000.00
JUMLAH HARGA BAHAN 94,500.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 296,000.00


E Overhead & Profit 10% x D 29,600.00
F Harga Satuan Pekerjaan (D+E) 325,600.00
1.7 Pembuatan 1 M 2 gudang semen dan peralatan
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 70000 14,000.00
Tukang Kayu L.02 OH 0.400 75000 30,000.00
kepala Tukang L.03 OH 0.020 95000 1,900.00
Mandor L.04 OH 0.020 95000 1,900.00
JUMLAH TENAGA KERJA 47,800.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm batang 1.700 13500 22,950.00
kayu m 3
0.210 0.00
paku biasa kg 0.300 0.00
semen portland kg 10.500 1200 12,600.00
pasir beton m3 0.030 150000 4,500.00
koral beton m3 0.050 300000 15,000.00
seng gelombang lbr 1.500 36000 54,000.00
seng plat lbr 0.250 0.00
JUMLAH HARGA BAHAN 109,050.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 156,850.00


E Overhead & Profit 10% x D 15,685.00
F Harga Satuan Pekerjaan (D+E) 172,535.00

1.8 Pembuatan 1 M 2 bedeng pekerja


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 70000 70,000.00
Tukang Kayu L.02 OH 2.000 75000 150,000.00
kepala Tukang L.03 OH 0.200 95000 19,000.00
Mandor L.04 OH 0.050 95000 4,750.00
JUMLAH TENAGA KERJA 243,750.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm batang 1.250 13500 16,875.00
kayu m 3
0.186 0 0.00
paku biasa kg 0.300 0 0.00
semen portland kg 18.000 1200 21,600.00
pasir beton m3 0.030 150000 4,500.00
koral beton m 3
0.050 300000 15,000.00
seng gelombang lbr 1.500 36000 54,000.00
plywood 4 mm lbr 1.350 0.00
JUMLAH HARGA BAHAN 111,975.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 355,725.00


E Overhead & Profit 10% x D 35,572.50
F Harga Satuan Pekerjaan (D+E) 391,297.50
1.9 Pembersihan 1 M 2 lapangan dan perataan
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 70000 7,000.00
Mandor L.04 OH 0.050 95000 4,750.00
JUMLAH TENAGA KERJA 11,750.00
B BAHAN
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 11,750.00


E Overhead & Profit 10% x D 1,175.00
F Harga Satuan Pekerjaan (D+E) 12,925.00

1.10 Pembuatan 1 M 2 stager/perancah dari bambu


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 70000 70,000.00
Tukang Kayu L.02 OH 2.000 75000 150,000.00
kepala Tukang L.03 OH 0.200 95000 19,000.00
Mandor L.04 OH 0.050 95000 4,750.00
JUMLAH TENAGA KERJA 243,750.00
B BAHAN
Bambu diameter 6-8/600 cm batang 1.250 0.00
tali ijuk m3 0.186 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 243,750.00


E Overhead & Profit 10% x D 24,375.00
F Harga Satuan Pekerjaan (D+E) 268,125.00

1.11 Pembuatan 1 kotak adukan ukuran 40cm x 50 cm x 25cm


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Tukang Kayu L.02 OH 0.300 75000 22,500.00
kepala Tukang L.03 OH 0.030 95000 2,850.00
JUMLAH TENAGA KERJA 25,350.00
B BAHAN
Kayu papan kelas III m3 0.036 0.00
Kayu balok 5/7 kelas III m 3
0.120 0.00
paku biasa kg 0.080 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 25,350.00


E Overhead & Profit 10% x D 2,535.00
F Harga Satuan Pekerjaan (D+E) 27,885.00
1.12 Pembuatan 1 M 2 jalan sementara
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 70000 70,000.00
Mandor L.04 OH 0.005 95000 475.00
JUMLAH TENAGA KERJA 70,475.00
B BAHAN
Papan kayu kelas 2 m3 0.050 1800000 90,000.00
Kayu balok 5/7 kelas III m 3
0.020 1650000 33,000.00
Paku biasa kg 0.080 20000 1,600.00
JUMLAH HARGA BAHAN 124,600.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 195,075.00


E Overhead & Profit 10% x D 19,507.50
F Harga Satuan Pekerjaan (D+E) 214,582.50

1.13 Pembongkaran 1 M 3 beton bertulang


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 13.334 70000 933,380.00
Mandor L.04 OH 0.666 95000 63,270.00
JUMLAH TENAGA KERJA 996,650.00
B BAHAN
0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 996,650.00


E Overhead & Profit 10% x D 99,665.00
F Harga Satuan Pekerjaan (D+E) 1,096,315.00

1.14 Pembongkaran 1 M 3 dinding tembok bata


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 6.667 70000 466,690.00
Mandor L.04 OH 0.333 95000 31,635.00
JUMLAH TENAGA KERJA 498,325.00
B BAHAN
0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 498,325.00


E Overhead & Profit 10% x D 49,832.50
F Harga Satuan Pekerjaan (D+E) 548,157.50
1.15 Pemasangan 1 M 2 pagar jaring galvanis panjang 240 cm
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.042 70000 2,940.00
Tukang Kayu L.02 OH 0.004 75000 300.00
kepala Tukang L.03 OH 0.002 95000 190.00
Mandor L.04 OH 0.042 95000 3,990.00
JUMLAH TENAGA KERJA 7,420.00
B BAHAN
Kawat jaring lbr 0.143 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 7,420.00


E Overhead & Profit 10% x D 742.00
F Harga Satuan Pekerjaan (D+E) 8,162.00

1.16 Pemasangan 1 M 2 panel beton pracetak 5x50x213 cm


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 0.375 70000 26,250.00
Tukang Kayu L.02 0.125 75000 9,375.00
kepala Tukang L.03 0.012 95000 1,140.00
Mandor L.04 0.190 95000 18,050.00
JUMLAH TENAGA KERJA 54,815.00
B BAHAN
Panel beton pracetak lbr 0.99 0.00
kolom beton pracetak batang 0.53 0.00
semen PC kg 45.00 1200 54,000.00
pasir beton m3 0.074 150000 11,100.00
koral beton m3 0.146 300000 43,800.00
JUMLAH HARGA BAHAN 108,900.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 163,715.00


E Overhead & Profit 10% x D 16,371.50
F Harga Satuan Pekerjaan (D+E) 180,086.50
HARGA SATUAN PEKERJAAN TANAH

2.1 Penggalian 1 M 3 tanah biasa sedalam 1 m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 70,000.00 52,500.000
Mandor L.04 OH 0.025 95,000.00 2,375.000
JUMLAH TENAGA KERJA 54,875.000
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 54,875.000


E Overhead & Profit 10% x D 5,487.500
F Harga Satuan Pekerjaan (D+E) 60,362.500

2.2 Penggalian 1 M 3 tanah biasa sedalam 2 m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 70,000.00 63,000.000
Mandor L.04 OH 0.045 95,000.00 4,275.000
JUMLAH TENAGA KERJA 67,275.000
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 67,275.000


E Overhead & Profit 10% x D 6,727.500
F Harga Satuan Pekerjaan (D+E) 74,002.500

2.3 Penggalian 1 M 3 tanah biasa sedalam 3 m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.050 70,000.00 73,500.000
Mandor L.04 OH 0.067 95,000.00 6,365.000
JUMLAH TENAGA KERJA 79,865.000
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 79,865.000


E Overhead & Profit 10% x D 7,986.500
F Harga Satuan Pekerjaan (D+E) 87,851.500
2.4 Penggalian 1 M 3 tanah keras sedalam 1 m
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.000
Mandor L.04 OH 0.032 95,000.00 3,040.000
JUMLAH TENAGA KERJA 73,040.000
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 73,040.000


E Overhead & Profit 10% x D 7,304.000
F Harga Satuan Pekerjaan (D+E) 80,344.000

2.5 Penggalian 1 M 3 tanah cadas sedalam 1 m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.000
Mandor L.04 OH 0.060 95,000.00 5,700.000
JUMLAH TENAGA KERJA 110,700.000
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 110,700.000


E Overhead & Profit 10% x D 11,070.000
F Harga Satuan Pekerjaan (D+E) 121,770.000

2.6 Penggalian 1 M 3 tanah lumpur sedalam 1 m


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 70,000.00 84,000.000
Mandor L.04 OH 0.045 95,000.00 4,275.000
JUMLAH TENAGA KERJA 88,275.000
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 88,275.000


E Overhead & Profit 10% x D 8,827.500
F Harga Satuan Pekerjaan (D+E) 97,102.500
2.7 Penggalian 1 M 3 tanah tebing setinggi 1 m
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500.000
Mandor L.04 OH 0.005 95,000.00 475.000
JUMLAH TENAGA KERJA 3,975.000
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 3,975.000


E Overhead & Profit 10% x D 397.500
F Harga Satuan Pekerjaan (D+E) 4,372.500

2.8 Pembuangan 1 M 3 tanah sejauh 30 meter


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.330 70,000.00 23,100.000
Mandor L.04 OH 0.010 95,000.00 950.000
JUMLAH TENAGA KERJA 24,050.000
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 24,050.000


E Overhead & Profit 10% x D 2,405.000
F Harga Satuan Pekerjaan (D+E) 26,455.000

2.9 Pengurugan kembali 1 M 3 galian tanah


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 70,000.00 35,000.000
Mandor L.04 OH 0.050 95,000.00 4,750.000
JUMLAH TENAGA KERJA 39,750.000
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 39,750.000


E Overhead & Profit 10% x D 3,975.000
F Harga Satuan Pekerjaan (D+E) 43,725.000
2.10 Pemadatan tanah 1 M 3 tanah (per 20 cm)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 70,000.00 35,000.000
Mandor L.04 OH 0.050 95,000.00 4,750.000
JUMLAH TENAGA KERJA 39,750.000
B BAHAN
Tanah Urug M3 1.200 100,000.00 120,000.000
JUMLAH HARGA BAHAN 120,000.000
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 159,750.000


E Overhead & Profit 10% x D 15,975.000
F Harga Satuan Pekerjaan (D+E) 175,725.000

2.11 Pengurugan 1 M 3 dengan pasir urug


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.000
Mandor L.04 OH 0.010 95,000.00 950.000
JUMLAH TENAGA KERJA 21,950.000
B BAHAN
Pasir urug 1.200 110,000.00 132,000.000
JUMLAH HARGA BAHAN 132,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 153,950.000


E Overhead & Profit 10% x D 15,395.000
F Harga Satuan Pekerjaan (D+E) 169,345.000

2.12 Pemasangan 1 M 3 lapisan pudel campuran 1KP:3PP:7TL


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 70,000.00 56,000.000
Tukang L.02 OH 0.400 75,000.00 30,000.000
Kepala Tukang L.03 OH 0.040 95,000.00 3,800.000
Mandor L.04 OH 0.080 95,000.00 7,600.000
JUMLAH TENAGA KERJA 97,400.000
B BAHAN
Kapur padam m3 0.135 2,600.00 351.000
Pasir pasang m 3
0.400 150,000.00 60,000.000
Tanah liat m3 0.948 50,000.00 47,400.000
JUMLAH HARGA BAHAN 107,751.000
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 205,151.000


E Overhead & Profit 10% x D 20,515.100
F Harga Satuan Pekerjaan (D+E) 225,666.100
2.13 Pemasangan 1 M 2 lapisan ijuk tebal 10 cm untuk bidang resapan
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.000
Mandor L.04 OH 0.015 95,000.00 1,425.000
JUMLAH TENAGA KERJA 11,925.000
B BAHAN
ijuk m3 6.000 50,000.00 300,000.000
JUMLAH HARGA BAHAN 300,000.000
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 311,925.000


E Overhead & Profit 10% x D 31,192.500
F Harga Satuan Pekerjaan (D+E) 343,117.500

2.14 Pengurugan 1 M 3 sirtu padat


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.000
Mandor L.04 OH 0.025 95,000.00 2,375.000
JUMLAH TENAGA KERJA 19,875.000
B BAHAN
Sirtu m3 1.200 190,000.00 228,000.000
JUMLAH HARGA BAHAN 228,000.000
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 247,875.000


E Overhead & Profit 10% x D 24,787.500
F Harga Satuan Pekerjaan (D+E) 272,662.500
HARGA SATUAN PEKERJAAN PONDASI

3.1 Pemasangan 1 M 3 pondasi batu belah campuran 1SP:3PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.000
Tukang L.02 OH 0.750 75,000.00 56,250.000
Kepala Tukang L.03 OH 0.075 95,000.00 7,125.000
Mandor L.04 OH 0.075 95,000.00 7,125.000
JUMLAH TENAGA KERJA 175,500.000
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.000
semen portland kg 202.000 1,200.00 242,400.000
Pasir pasang m3 0.485 150,000.00 72,750.000
JUMLAH HARGA BAHAN 693,150.000
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 868,650.000


E Overhead & Profit 10% x D 86,865.000
F Harga Satuan Pekerjaan (D+E) 955,515.000

3.2 Pemasangan 1 M 3 pondasi batu belah campuran 1SP:4PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.000
Tukang L.02 OH 0.750 75,000.00 56,250.000
Kepala Tukang L.03 OH 0.075 95,000.00 7,125.000
Mandor L.04 OH 0.075 95,000.00 7,125.000
JUMLAH TENAGA KERJA 175,500.000
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.000
semen portland kg 163.000 1,200.00 195,600.000
Pasir pasang m 3
0.520 150,000.00 78,000.000
JUMLAH HARGA BAHAN 651,600.000
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 827,100.000


E Overhead & Profit 10% x D 82,710.000
F Harga Satuan Pekerjaan (D+E) 909,810.000
3.3 Pemasangan 1 M 3 pondasi batu belah campuran 1SP:5PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.000
Tukang L.02 OH 0.750 75,000.00 56,250.000
Kepala Tukang L.03 OH 0.075 95,000.00 7,125.000
Mandor L.04 OH 0.075 95,000.00 7,125.000
JUMLAH TENAGA KERJA 175,500.000
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.000
semen portland kg 136.000 1,200.00 163,200.000
Pasir pasang m 3
0.544 150,000.00 81,600.000
JUMLAH HARGA BAHAN 622,800.000
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 798,300.000


E Overhead & Profit 10% x D 79,830.000
F Harga Satuan Pekerjaan (D+E) 878,130.000

3.4 Pemasangan 1 M 3 pondasi batu belah campuran 1SP:6PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.000
Tukang L.02 OH 0.750 75,000.00 56,250.000
Kepala Tukang L.03 OH 0.075 95,000.00 7,125.000
Mandor L.04 OH 0.075 95,000.00 7,125.000
JUMLAH TENAGA KERJA 175,500.000
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.000
semen portland kg 117.000 1,200.00 140,400.000
Pasir pasang m 3
0.561 150,000.00 84,150.000
JUMLAH HARGA BAHAN 602,550.000
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 778,050.000


E Overhead & Profit 10% x D 77,805.000
F Harga Satuan Pekerjaan (D+E) 855,855.000
3.5 Pemasangan 1 M 3 pondasi batu belah campuran 1SP:8PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.000
Tukang L.02 OH 0.750 75,000.00 56,250.000
Kepala Tukang L.03 OH 0.075 95,000.00 7,125.000
Mandor L.04 OH 0.075 95,000.00 7,125.000
JUMLAH TENAGA KERJA 175,500.000
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.000
semen portland kg 91.000 1,200.00 109,200.000
Pasir pasang m 3
0.584 150,000.00 87,600.000
JUMLAH HARGA BAHAN 574,800.000
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 750,300.000


E Overhead & Profit 10% x D 75,030.000
F Harga Satuan Pekerjaan (D+E) 825,330.000

3.6 Pemasangan 1 M 3 batu kosong ( aanstamping )


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.780 70,000.00 54,600.000
Tukang L.02 OH 0.390 75,000.00 29,250.000
Kepala Tukang L.03 OH 0.039 95,000.00 3,705.000
Mandor L.04 OH 0.039 95,000.00 3,705.000
JUMLAH TENAGA KERJA 91,260.000
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.000
Pasir urug m3 0.432 150,000.00 64,800.000
JUMLAH HARGA BAHAN 442,800.000
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 534,060.000


E Overhead & Profit 10% x D 53,406.000
F Harga Satuan Pekerjaan (D+E) 587,466.000
3.7 Pemasangan 1 M 3 pondasi sumuran, diameter 100 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.400 70,000.00 168,000.000
Tukang L.02 OH 0.800 75,000.00 60,000.000
Kepala Tukang L.03 OH 0.080 95,000.00 7,600.000
Mandor L.04 OH 0.119 95,000.00 11,305.000
JUMLAH TENAGA KERJA 246,905.000
B BAHAN
Batu belah m3 0.450 315,000.00 141,750.000
Semen Portlan kg 194.000 1,200.00 232,800.000
Pasir beton m 3
0.312 150,000.00 46,800.000
Kerikil m3 0.468 300,000.00 140,400.000
JUMLAH HARGA BAHAN 561,750.000
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 808,655.000


E Overhead & Profit 10% x D 80,865.500
F Harga Satuan Pekerjaan (D+E) 889,520.500
HARGA SATUAN PEKERJAAN BETON

4.5 Pemasangan 1 M 3 beton mutu f" c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c= 0,66
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 95,000.00 2,660.00
Mandor L.04 OH 0.083 95,000.00 7,885.00
JUMLAH TENAGA KERJA 146,670.00
B BAHAN
Semen Portland kg 326.000 1,200.00 391,200.00
Pasir beton kg 760.000 107.19 81,466.05
Kerikil (maks 30mm) kg 1,029.000 222.22 228,666.67
Air liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 722,832.72
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 869,502.72


E Overhead & Profit 10% x D 86,950.27
F Harga Satuan Pekerjaan (D+E) 956,452.99

4.17 Pembesian 10 kg dengan besi polos atau besi ulir


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 70,000.00 4,900.00
Tukang besi L.02 OH 0.070 75,000.00 5,250.00
Kepala Tukang L.03 OH 0.007 95,000.00 665.00
Mandor L.04 OH 0.004 95,000.00 380.00
JUMLAH TENAGA KERJA 11,195.00
B BAHAN
Besi beton (polos/ulir) kg 10.500 11,500.00 120,750.00
Kawat beton kg 0.150 21,000.00 3,150.00
JUMLAH HARGA BAHAN 123,900.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 135,095.00


E Overhead & Profit 10% x D 13,509.50
F Harga Satuan Pekerjaan (D+E) 148,604.50
G Harga Satuan Pekerjaan (D+E)/10 14,860.45

4.18 Pembesian 10 kg kabel presstressed polos/strands


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500.00
Tukang besi L.02 OH 0.050 75,000.00 3,750.00
Kepala Tukang L.03 OH 0.005 95,000.00 475.00
Mandor L.04 OH 0.003 95,000.00 285.00
JUMLAH TENAGA KERJA 8,010.00
B BAHAN
Besi beton (polos/ulir) kg 10.500 11,500.00 120,750.00
Kawat beton kg 0.100 21,000.00 2,100.00
JUMLAH HARGA BAHAN 2,100.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 10,110.00


E Overhead & Profit 10% x D 1,011.00
F Harga Satuan Pekerjaan (D+E) 11,121.00
HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

5.1 Pemasangan 1 kg besi profil


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 70,000.00 4,200.000
Tukang las kontruksi L.03 OH 0.060 75,000.00 4,500.000
Kepala Tukang L.03 OH 0.060 95,000.00 5,700.000
Mandor L.04 OH 0.003 95,000.00 285.000
JUMLAH TENAGA KERJA 14,685.000
B BAHAN
Besi profil kg 1.150 15,200.00 17,480.000
JUMLAH HARGA BAHAN 17,480.000
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 32,165.000


E Overhead & Profit 10% x D 3,216.500
F Harga Satuan Pekerjaan (D+E) 35,381.500

5.2 Pengerjaan 100 kg pekerjaan perakitan


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.000
Tukang las kontruksi L.03 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.03 OH 0.001 95,000.00 95.000
Mandor L.04 OH 0.005 95,000.00 475.000
JUMLAH TENAGA KERJA 15,070.000
B BAHAN
Solar liter 1.000 12,000.00 12,000.000
Minyak pelumas liter 0.100 32,900.00 3,290.000
JUMLAH HARGA BAHAN 15,290.000
C PERALATAN
Sewa alat jam 0.800 100,000.00 80,000.000
JUMLAH HARGA ALAT 80,000.000

D Jumlah (A+B+C) 110,360.000


E Overhead & Profit 10% x D 11,036.000
F Harga Satuan Pekerjaan (D+E) 121,396.000
5.3 Pembuatan 1 m 2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.050 70,000.00 73,500.000
Tukang las kontruksi L.03 OH 1.050 75,000.00 78,750.000
Kepala Tukang L.03 OH 0.105 95,000.00 9,975.000
Mandor L.04 OH 0.052 95,000.00 4,940.000
JUMLAH TENAGA KERJA 167,165.000
B BAHAN
Besi siku L 30.30.3 kg 15.000 -
Besi plat baja kg 32.800
Kawat las kg 0.050 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa alat jam 0.800 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 167,165.000


E Overhead & Profit 10% x D 16,716.500
F Harga Satuan Pekerjaan (D+E) 183,881.500

5.4 Pengerjaan 10 cm pengelasan dengan las listrik


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 70,000.00 2,800.000
Tukang las kontruksi L.03 OH 0.020 75,000.00 1,500.000
Kepala Tukang L.03 OH 0.002 95,000.00 190.000
Mandor L.04 OH 0.002 95,000.00 190.000
JUMLAH TENAGA KERJA 4,680.000
B BAHAN
Kawat Listrik kg 0.400 -
Solar kg 0.300
Minyak Pelumas kg 0.040 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa alat jam 0.170 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 4,680.000


E Overhead & Profit 10% x D 468.000
F Harga Satuan Pekerjaan (D+E) 5,148.000
5.5 Pemasangan 1 m 2 pintu rolling door besi
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 70,000.00 84,000.000
Tukang las besi L.03 OH 1.200 75,000.00 90,000.000
Kepala Tukang L.03 OH 0.120 95,000.00 11,400.000
Mandor L.04 OH 0.006 95,000.00 570.000
JUMLAH TENAGA KERJA 185,970.000
B BAHAN
Pintu gulung besi m2 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 185,970.000


E Overhead & Profit 10% x D 18,597.000
F Harga Satuan Pekerjaan (D+E) 204,567.000

5.6 Pemasangan 1 m 2 pintu rolling door aluminium


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.000
Tukang khusus aluminium L.03 OH 1.000 75,000.00 75,000.000
Kepala Tukang L.03 OH 0.100 95,000.00 9,500.000
Mandor L.04 OH 0.050 95,000.00 4,750.000
JUMLAH TENAGA KERJA 159,250.000
B BAHAN
Rolling door aluminium m2 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 159,250.000


E Overhead & Profit 10% x D 15,925.000
F Harga Satuan Pekerjaan (D+E) 175,175.000
5.7 Pemasangan 1 m kusen pintu aluminium
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.043 70,000.00 3,010.000
Tukang khusus aluminium L.03 OH 0.043 75,000.00 3,225.000
Kepala Tukang L.03 OH 0.004 95,000.00 408.500
Mandor L.04 OH 0.002 95,000.00 199.500
JUMLAH TENAGA KERJA 6,843.000
B BAHAN
Profil aluminum m 1.100 -
skrup fixer bh 2.000 -
sealent tube 0.060 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 6,843.000


E Overhead & Profit 10% x D 684.300
F Harga Satuan Pekerjaan (D+E) 7,527.300

5.8 Pemasangan 1 m2 pintu aluminium strip lebar 8 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 70,000.00 5,950.000
Tukang khusus aluminium L.03 OH 0.085 75,000.00 6,375.000
Kepala Tukang L.03 OH 0.0085 95,000.00 807.500
Mandor L.04 OH 0.004 95,000.00 399.000
JUMLAH TENAGA KERJA 13,531.500
B BAHAN
Profil aluminum m 4.400 -
aluminium strip m 14.600 -

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 13,531.500


E Overhead & Profit 10% x D 1,353.150
F Harga Satuan Pekerjaan (D+E) 14,884.650
5.9 Pemasangan 1 m 2 kusen pintu kaca rangka aluminium
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 70,000.00 5,950.000
Tukang khusus aluminium L.03 OH 0.085 75,000.00 6,375.000
Kepala Tukang L.03 OH 0.009 95,000.00 855.000
Mandor L.04 OH 0.005 95,000.00 475.000
JUMLAH TENAGA KERJA 13,655.000
B BAHAN
Profil aluminum m 4.400 - -
skrup fixer bh 4.500 - -
sealent tube 0.270 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 13,655.000


E Overhead & Profit 10% x D 1,365.500
F Harga Satuan Pekerjaan (D+E) 15,020.500

5.10 Pemasangan 1 m 1 talang datar/jurai seng bjls 28 lebar 90 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 70,000.00 5,950.000
Tukang L.03 OH 0.085 75,000.00 6,375.000
Kepala Tukang L.03 OH 0.009 95,000.00 855.000
Mandor L.04 OH 0.005 95,000.00 475.000
JUMLAH TENAGA KERJA 13,655.000
B BAHAN
Seng plat m 4.400 - -
Paku 1 cm - 2,5 cm kg 4.500 - -
Papan kayu kelas II atau III m3 0.270 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 13,655.000


E Overhead & Profit 10% x D 1,365.500
F Harga Satuan Pekerjaan (D+E) 15,020.500
5.11 Pemasangan 1 m 1 talang 1/2 lingkaran D-15 m, seng plat bjls 30 lebar 45
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.000
Tukang L.03 OH 0.300 75,000.00 22,500.000
Kepala Tukang L.03 OH 0.030 95,000.00 2,850.000
Mandor L.04 OH 0.008 95,000.00 760.000
JUMLAH TENAGA KERJA 36,610.000
B BAHAN
Seng plat m 1.050 - -
Paku 1 cm - 2,5 cm kg 0.010 - -
Besi Strip kg 0.500 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 36,610.000


E Overhead & Profit 10% x D 3,661.000
F Harga Satuan Pekerjaan (D+E) 40,271.000

5.12 Pemasangan 1 m 2 rangka besi hollow 1x40.40.2mm, modul 60x120cm, dinding partisi
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.000
Tukang besi L.03 OH 0.250 75,000.00 18,750.000
Kepala Tukang L.03 OH 0.025 95,000.00 2,375.000
Mandor L.04 OH 0.013 95,000.00 1,235.000
JUMLAH TENAGA KERJA 39,860.000
B BAHAN
Rangka metal hollow 40.40.2mm m1 3.500 -
Assesoris (perkuatan, las dll) Ls 100Xrangka -

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 39,860.000


E Overhead & Profit 10% x D 3,986.000
F Harga Satuan Pekerjaan (D+E) 43,846.000
5.13 Pemasangan 1 m 2 rangka besi hollow 1x40.40.2mm, modul 60x60cm, plafond
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 70,000.00 24,500.000
Tukang besi L.03 OH 0.350 75,000.00 26,250.000
Kepala Tukang L.03 OH 0.035 95,000.00 3,325.000
Mandor L.04 OH 0.018 95,000.00 1,710.000
JUMLAH TENAGA KERJA 55,785.000
B BAHAN
Rangka metal hollow 40.40.2mm m1 4.000 14,000.00 56,000.000
Assesoris (perkuatan, las dll) Ls 100x rangka 14,000.00 14,000.000

JUMLAH HARGA BAHAN 70,000.000


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 125,785.000


E Overhead & Profit 10% x D 12,578.500
F Harga Satuan Pekerjaan (D+E) 138,363.500
HARGA SATUAN PEKERJAAN PASANGAN DINDING

6.1 Pemasangan 1 m 2 dinding bata merah (5x11x22)cm tebal 1 batu camp. 1SP:2PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.000
Tukang batu L.02 OH 0.200 75,000.00 15,000.000
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.000
Mandor L.04 OH 0.030 95,000.00 2,850.000
JUMLAH TENAGA KERJA 61,750.000
B BAHAN
Bata merah m3 140.000 700.00 98,000.000
Semen portland kg 43.500 1,200.00 52,200.000
Pasir pasang m3
0.080 150,000.00 12,000.000
JUMLAH HARGA BAHAN 162,200.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 223,950.000


E Overhead & Profit 10% x D 22,395.000
F Harga Satuan Pekerjaan (D+E) 246,345.000

6.2 Pemasangan 1 m 2 dinding bata merah (5x11x22)cm tebal 1 batu camp. 1SP:3PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.000
Tukang batu L.02 OH 0.200 75,000.00 15,000.000
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.000
Mandor L.04 OH 0.030 95,000.00 2,850.000
JUMLAH TENAGA KERJA 61,750.000
B BAHAN
Bata merah m3 140.000 700.00 98,000.000
Semen portland kg 32.950 1,200.00 39,540.000
Pasir pasang m3 0.091 150,000.00 13,650.000
JUMLAH HARGA BAHAN 151,190.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 212,940.000


E Overhead & Profit 10% x D 21,294.000
F Harga Satuan Pekerjaan (D+E) 234,234.000
6.3 Pemasangan 1 m 2 dinding bata merah (5x11x22)cm tebal 1 batu camp. 1SP:4PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.000
Tukang batu L.02 OH 0.200 75,000.00 15,000.000
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.000
Mandor L.04 OH 0.030 95,000.00 2,850.000
JUMLAH TENAGA KERJA 61,750.000
B BAHAN
Bata merah m3 140.000 700.00 98,000.000
Semen portland kg 26.550 1,200.00 31,860.000
Pasir pasang m3 0.093 150,000.00 13,950.000
JUMLAH HARGA BAHAN 143,810.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 205,560.000


E Overhead & Profit 10% x D 20,556.000
F Harga Satuan Pekerjaan (D+E) 226,116.000

6.4 Pemasangan 1 m 2 dinding bata merah (5x11x22)cm tebal 1 batu camp. 1SP : 5PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.000
Tukang batu L.02 OH 0.200 75,000.00 15,000.000
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.000
Mandor L.04 OH 0.030 95,000.00 2,850.000
JUMLAH TENAGA KERJA 61,750.000
B BAHAN
Bata merah m3 140.000 700.00 98,000.000
Semen portland kg 22.200 1,200.00 26,640.000
Pasir pasang m3 0.102 150,000.00 15,300.000
JUMLAH HARGA BAHAN 139,940.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 201,690.000


E Overhead & Profit 10% x D 20,169.000
F Harga Satuan Pekerjaan (D+E) 221,859.000
6.5 Pemasangan 1 m 2 dinding bata merah (5x11x22)cm tebal 1 batu camp. 1SP : 6PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.000
Tukang batu L.02 OH 0.200 75,000.00 15,000.000
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.000
Mandor L.04 OH 0.030 95,000.00 2,850.000
JUMLAH TENAGA KERJA 61,750.000
B BAHAN
Bata merah m3 140.000 700.00 98,000.000
Semen portland kg 18.500 1,200.00 22,200.000
Pasir pasang m3 0.122 150,000.00 18,300.000
JUMLAH HARGA BAHAN 138,500.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 200,250.000


E Overhead & Profit 10% x D 20,025.000
F Harga Satuan Pekerjaan (D+E) 220,275.000

6.6 Pemasangan 1 m 2 dinding bata merah (5x11x22)cm tebal 1 batu camp. 1SP : 3KP : 10PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.000
Tukang batu L.02 OH 0.200 75,000.00 15,000.000
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.000
Mandor L.04 OH 0.030 95,000.00 2,850.000
JUMLAH TENAGA KERJA 61,750.000
B BAHAN
Bata merah m3 140.000 700.00 98,000.000
Semen portland kg 10.080 1,200.00 12,096.000
Kapur padam m3 0.0275 2,600.00 71.500
Pasir pasang m3
0.122 150,000.00 18,300.000
JUMLAH HARGA BAHAN 128,467.500
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 190,217.500


E Overhead & Profit 10% x D 19,021.750
F Harga Satuan Pekerjaan (D+E) 209,239.250
6.7 Pemasangan 1 m 2 dinding bata merah (5x11x22)cm tebal 1/2 batu campuran 1SP : 2PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.000
Tukang batu L.02 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.03 OH 0.010 95,000.00 950.000
Mandor L.04 OH 0.015 95,000.00 1,425.000
JUMLAH TENAGA KERJA 30,875.000
B BAHAN
Bata merah m3 70.000 700.00 49,000.000
Semen portland kg 19.950 1,200.00 23,940.000
Pasir pasang m3 0.038 150,000.00 5,700.000
JUMLAH HARGA BAHAN 78,640.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 109,515.000


E Overhead & Profit 10% x D 10,951.500
F Harga Satuan Pekerjaan (D+E) 120,466.500

6.8 Pemasangan 1 m 2 dinding bata merah (5x11x22)cm tebal 1/2 batu campuran 1SP : 3PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.000
Tukang batu L.02 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.03 OH 0.010 95,000.00 950.000
Mandor L.04 OH 0.015 95,000.00 1,425.000
JUMLAH TENAGA KERJA 30,875.000
B BAHAN
Bata merah m3 70.000 700.00 49,000.000
Semen portland kg 14.370 1,200.00 17,244.000
Pasir pasang m3 0.040 150,000.00 6,000.000
JUMLAH HARGA BAHAN 72,244.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 103,119.000


E Overhead & Profit 10% x D 10,311.900
F Harga Satuan Pekerjaan (D+E) 113,430.900
6.9 Pemasangan 1 m 2 dinding bata merah (5x11x22)cm tebal 1/2 batu campuran 1SP : 4PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.000
Tukang batu L.02 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.03 OH 0.010 95,000.00 950.000
Mandor L.04 OH 0.015 95,000.00 1,425.000
JUMLAH TENAGA KERJA 30,875.000
B BAHAN
Bata merah m3 70.000 700.00 49,000.000
Semen portland kg 11.500 1,200.00 13,800.000
Pasir pasang m3 0.043 150,000.00 6,450.000
JUMLAH HARGA BAHAN 69,250.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 100,125.000


E Overhead & Profit 10% x D 10,012.500
F Harga Satuan Pekerjaan (D+E) 110,137.500

6.10 Pemasangan 1 m 2 dinding bata merah (5x11x22)cm tebal 1/2 batu campuran 1SP : 5PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.000
Tukang batu L.02 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.03 OH 0.010 95,000.00 950.000
Mandor L.04 OH 0.015 95,000.00 1,425.000
JUMLAH TENAGA KERJA 30,875.000
B BAHAN
Bata merah m3 70.000 700.00 49,000.000
Semen portland kg 9.680 1,200.00 11,616.000
Pasir pasang m3 0.045 150,000.00 6,750.000
JUMLAH HARGA BAHAN 67,366.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 98,241.000


E Overhead & Profit 10% x D 9,824.100
F Harga Satuan Pekerjaan (D+E) 108,065.100
6.11 Pemasangan 1 m 2 dinding terawang (rooster) 12x11x24 campuran 1SP : 3PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.000
Tukang batu L.02 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.03 OH 0.010 95,000.00 950.000
Mandor L.04 OH 0.015 95,000.00 1,425.000
JUMLAH TENAGA KERJA 30,875.000
B BAHAN
Bata merah m3 30.000 700.00 21,000.000
Semen portland kg 11.000 1,200.00 13,200.000
Pasir pasang m3 0.035 150,000.00 5,250.000
JUMLAH HARGA BAHAN 39,450.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 70,325.000


E Overhead & Profit 10% x D 7,032.500
F Harga Satuan Pekerjaan (D+E) 77,357.500

6.12 Pemasangan 1 m 2 plesteran 1SP :1PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.000
Tukang batu L.03 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.03 OH 0.015 95,000.00 1,425.000
Mandor L.04 OH 0.015 95,000.00 1,425.000
JUMLAH TENAGA KERJA 35,100.000
B BAHAN
Semen portland kg 15.500 1,200.00 18,600.000
Pasir pasang m 3
0.016 150,000.00 2,400.000
JUMLAH HARGA BAHAN 21,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 56,100.000


E Overhead & Profit 10% x D 5,610.000
F Harga Satuan Pekerjaan (D+E) 61,710.000
6.13 Pemasangan 1 m 2 plesteran 1SP :2PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.000
Tukang batu L.03 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.03 OH 0.015 95,000.00 1,425.000
Mandor L.04 OH 0.015 95,000.00 1,425.000
JUMLAH TENAGA KERJA 35,100.000
B BAHAN
Semen portland kg 10.224 1,200.00 12,268.800
Pasir pasang m3 0.016 150,000.00 2,400.000
JUMLAH HARGA BAHAN 14,668.800
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 49,768.800


E Overhead & Profit 10% x D 4,976.880
F Harga Satuan Pekerjaan (D+E) 54,745.680

6.14 Pemasangan 1 m 2 plesteran 1SP :3PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.000
Tukang batu L.03 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.03 OH 0.015 95,000.00 1,425.000
Mandor L.04 OH 0.015 95,000.00 1,425.000
JUMLAH TENAGA KERJA 35,100.000
B BAHAN
Semen portland kg 7.776 1,200.00 9,331.200
Pasir pasang m3
0.023 150,000.00 3,450.000
JUMLAH HARGA BAHAN 12,781.200
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 47,881.200


E Overhead & Profit 10% x D 4,788.120
F Harga Satuan Pekerjaan (D+E) 52,669.320
6.15 Pemasangan 1 m 2 plesteran 1SP :4PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.000
Tukang batu L.03 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.03 OH 0.015 95,000.00 1,425.000
Mandor L.04 OH 0.015 95,000.00 1,425.000
JUMLAH TENAGA KERJA 35,100.000
B BAHAN
Semen portland kg 6.240 1,200.00 7,488.000
Pasir pasang m3 0.024 150,000.00 3,600.000
JUMLAH HARGA BAHAN 11,088.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,188.000


E Overhead & Profit 10% x D 4,618.800
F Harga Satuan Pekerjaan (D+E) 50,806.800

6.16 Pemasangan 1 m 2 finishing siar pasangan coneblock ekspose


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 70,000.00 4,900.000
Tukang batu L.03 OH 0.035 75,000.00 2,625.000
Kepala Tukang L.03 OH 0.004 95,000.00 380.000
Mandor L.04 OH 0.004 95,000.00 380.000
JUMLAH TENAGA KERJA 8,285.000
B BAHAN
Semen portland kg 1.600 1,200.00 1,920.000
JUMLAH HARGA BAHAN 1,920.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 10,205.000


E Overhead & Profit 10% x D 1,020.500
F Harga Satuan Pekerjaan (D+E) 11,225.500
6.17 Pemasangan 1 m 2 finishing siar pasangan batu kali, cam. 1SP : 2PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.000
Tukang batu L.03 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.03 OH 0.015 95,000.00 1,425.000
Mandor L.04 OH 0.015 95,000.00 1,425.000
JUMLAH TENAGA KERJA 35,100.000
B BAHAN
Semen portland kg 6.340 1,200.00 7,608.000
Pasir pasang m3 0.012 150,000.00 1,800.000
JUMLAH HARGA BAHAN 9,408.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 44,508.000


E Overhead & Profit 10% x D 4,450.800
F Harga Satuan Pekerjaan (D+E) 48,958.800

6.18 Pemasangan 1 m 2 acian


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.000
Tukang batu L.03 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.03 OH 0.010 95,000.00 950.000
Mandor L.04 OH 0.010 95,000.00 950.000
JUMLAH TENAGA KERJA 23,400.000
B BAHAN
Semen portland kg 3.250 1,200.00 3,900.000
JUMLAH HARGA BAHAN 3,900.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 27,300.000


E Overhead & Profit 10% x D 2,730.000
F Harga Satuan Pekerjaan (D+E) 30,030.000
HARGA SATUAN PEKERJAAN LANTAI DAN PENUTUP DINDING

7.4 Pemasangan 1 m 2 lantai keramik ukuran 40cm x 40cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.000
Tukang batu L.02 OH 0.350 75,000.00 26,250.000
Kepala Tukang L.03 OH 0.035 95,000.00 3,325.000
Mandor L.04 OH 0.035 95,000.00 3,325.000
JUMLAH TENAGA KERJA 81,900.000
B BAHAN
keramik bh 6.630 11,200.00 74,256.000
Semen PC kg 9.800 1,200.00 11,760.000
Pasir pasang m3 0.045 150,000.00 6,750.000
Semen warna kg 1.300 2,400.00 3,120.000
JUMLAH HARGA BAHAN 95,886.000
C PERALATAN
Bongkaran lantai m2 1.000 13,300.00 13,300.000
JUMLAH HARGA ALAT 13,300.000

D Jumlah (A+B+C) 191,086.000


E Overhead & Profit 10% x D 19,108.600
F Harga Satuan Pekerjaan (D+E) 210,194.600
HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

12.1 Pemasangan 1 buah closet duduk/monoblock


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 3.300 70,000.00 231,000.000
Tukang batu L.02 OH 1.100 75,000.00 82,500.000
Kepala Tukang L.03 OH 0.010 95,000.00 950.000
Mandor L.04 OH 0.1600 95,000.00 15,200.000
JUMLAH TENAGA KERJA 329,650.000
B BAHAN
closed duduk Unit 1.000 2,012,000.00 2,012,000.00
Perlengkapan Ls 6%xclosed 120,720.00 120,720.00
JUMLAH HARGA BAHAN 2,132,720.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,462,370.000


E Overhead & Profit 10% x D 246,237.000
F Harga Satuan Pekerjaan (D+E) 2,708,607.000

12.2 Pemasangan 1 buah closet jongkok porselen


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.000
Tukang batu L.02 OH 1.500 75,000.00 112,500.000
Kepala Tukang L.03 OH 0.150 95,000.00 14,250.000
Mandor L.04 OH 0.1600 95,000.00 15,200.000
JUMLAH TENAGA KERJA 211,950.000
B BAHAN
closed duduk Unit 1.000 160,000.00 160,000.00
Semen PC kg 6.000 1,200.00 7,200.00
Pasir Pasang m3 0.010 150,000.00 1,500.00
JUMLAH HARGA BAHAN 168,700.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 380,650.000


E Overhead & Profit 10% x D 38,065.000
F Harga Satuan Pekerjaan (D+E) 418,715.000
12.3 Pemasangan 1 buah urinoir
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.000
Tukang batu L.02 OH 1.000 75,000.00 75,000.000
Kepala Tukang L.03 OH 0.100 95,000.00 9,500.000
Mandor L.04 OH 0.0500 95,000.00 4,750.000
JUMLAH TENAGA KERJA 159,250.000
B BAHAN
Urinoir Unit 1.000 -
Semen PC kg 6.000
Pasir Pasang m3 0.010
Perlengkapan % 30.000
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 159,250.000


E Overhead & Profit 10% x D 15,925.000
F Harga Satuan Pekerjaan (D+E) 175,175.000

12.4 Pemasangan 1 buah wastafel


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.200 70,000.00 84,000.000
Tukang batu L.02 OH 1.450 75,000.00 108,750.000
Kepala Tukang L.03 OH 0.150 95,000.00 14,250.000
Mandor L.04 OH 0.0600 95,000.00 5,700.000
JUMLAH TENAGA KERJA 212,700.000
B BAHAN
Wastafel Unit 1.200 200,000.00 240,000.00
Semen PC kg 6.000 1,200.00 7,200.00
Pasir Pasang m 3
0.010 150,000.00 1,500.00
Perlengkapan % 12.000 18,000.00 18,000.00
JUMLAH HARGA BAHAN 266,700.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 479,400.000


E Overhead & Profit 10% x D 47,940.000
F Harga Satuan Pekerjaan (D+E) 527,340.000
12.5 Pemasangan 1 buah bak cuci piring stainlessteel
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 70,000.00 2,100.000
Tukang batu L.02 OH 0.300 75,000.00 22,500.000
Kepala Tukang L.03 OH 0.030 95,000.00 2,850.000
Mandor L.04 OH 0.0150 95,000.00 1,425.000
JUMLAH TENAGA KERJA 28,875.000
B BAHAN
Bak cuci piring Unit 1.000 -
Waterdrain kg 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 28,875.000


E Overhead & Profit 10% x D 2,887.500
F Harga Satuan Pekerjaan (D+E) 31,762.500

12.6 Pemasangan 1 buah floor drain


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.010 70,000.00 700.000
Tukang batu L.02 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.03 OH 0.010 95,000.00 950.000
Mandor L.04 OH 0.0050 95,000.00 475.000
JUMLAH TENAGA KERJA 9,625.000
B BAHAN
Floor drain Unit 1.000 24,200.00 24,200.00
JUMLAH HARGA BAHAN 24,200.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 33,825.000


E Overhead & Profit 10% x D 3,382.500
F Harga Satuan Pekerjaan (D+E) 37,207.500
12.7 Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45 cm tinggi 45 cm
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 3.200 70,000.00 224,000.000
Tukang batu L.02 OH 1.150 75,000.00 86,250.000
Kepala Tukang L.03 OH 0.110 95,000.00 10,450.000
Mandor L.04 OH 0.0160 95,000.00 1,520.000
JUMLAH TENAGA KERJA 322,220.000
B BAHAN
Bata merah bh 70.000 -
Semen PC kg 77.000 -
Pasir pasang m3 0.130 -
Pasir beton m3 0.090 -
Kerikil m3 0.020 -
Baja tulangan kg 2.600 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 322,220.000


E Overhead & Profit 10% x D 32,222.000
F Harga Satuan Pekerjaan (D+E) 354,442.000

12.8 Pemasangan 1 buah bak kontrol pasangan bata 60cm x 60 cm tinggi 65 cm


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 3.200 70,000.00 224,000.000
Tukang batu L.02 OH 1.150 75,000.00 86,250.000
Kepala Tukang L.03 OH 0.110 95,000.00 10,450.000
Mandor L.04 OH 0.0160 95,000.00 1,520.000
JUMLAH TENAGA KERJA 322,220.000
B BAHAN
Bata merah bh 123.000 - -
Semen PC kg 114.000 - -
Pasir pasang m3 0.184 - -
Pasir beton m3 0.120 - -
Kerikil m3 0.033 - -
Baja tulangan kg 4.850 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 322,220.000


E Overhead & Profit 10% x D 32,222.000
F Harga Satuan Pekerjaan (D+E) 354,442.000
12.9 Pemasangan 1 buah kran diameter 1/2" atau 3/4"
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.010 70,000.00 700.000
Tukang batu L.02 OH 0.400 75,000.00 30,000.000
Kepala Tukang L.03 OH 0.040 95,000.00 3,800.000
Mandor L.04 OH 0.0050 95,000.00 475.000
JUMLAH TENAGA KERJA 34,975.000
B BAHAN
Kran air m 1.000 15,000.00 15,000.00
Sealtape bh 0.025 3,000.00 75.00
JUMLAH HARGA BAHAN 15,075.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 50,050.000


E Overhead & Profit 10% x D 5,005.000
F Harga Satuan Pekerjaan (D+E) 55,055.000

12.10 Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.010 70,000.00 700.000
Tukang batu L.02 OH 0.400 75,000.00 30,000.000
Kepala Tukang L.03 OH 0.040 95,000.00 3,800.000
Mandor L.04 OH 0.0050 95,000.00 475.000
JUMLAH TENAGA KERJA 34,975.000
B BAHAN
Pipa PVC 1/2" M 1.200 -
Perlengkapan % 35.000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 34,975.000


E Overhead & Profit 10% x D 3,497.500
F Harga Satuan Pekerjaan (D+E) 38,472.500

12.11 Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.036 70,000.00 2,520.000
Tukang batu L.02 OH 0.060 75,000.00 4,500.000
Kepala Tukang L.03 OH 0.006 95,000.00 570.000
Mandor L.04 OH 0.0020 95,000.00 190.000
JUMLAH TENAGA KERJA 7,780.000
B BAHAN
Pipa PVC 3/4" M 1.200 7,800.00 9,360.00
Perlengkapan % 35.000 2,730.00 2,730.00
JUMLAH HARGA BAHAN 12,090.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 19,870.000


E Overhead & Profit 10% x D 1,987.000
F Harga Satuan Pekerjaan (D+E) 21,857.000
12.12 Pemasangan 1 m' pipa PVC tipe AW diameter 1"
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.036 70,000.00 2,520.000
Tukang batu L.02 OH 0.060 75,000.00 4,500.000
Kepala Tukang L.03 OH 0.006 95,000.00 570.000
Mandor L.04 OH 0.0020 95,000.00 190.000
JUMLAH TENAGA KERJA 7,780.000
B BAHAN
Pipa PVC 1" M 1.200 8,000.00 9,600.00
Perlengkapan % 35.000 2,800.00 2,800.00
JUMLAH HARGA BAHAN 12,400.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 20,180.000


E Overhead & Profit 10% x D 2,018.000
F Harga Satuan Pekerjaan (D+E) 22,198.000

12.13 Pemasangan 1 m' pipa PVC tipe AW diameter 11/2"


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.054 70,000.00 3,780.000
Tukang batu L.02 OH 0.090 75,000.00 6,750.000
Kepala Tukang L.03 OH 0.009 95,000.00 855.000
Mandor L.04 OH 0.0030 95,000.00 285.000
JUMLAH TENAGA KERJA 11,670.000
B BAHAN
Pipa PVC 11/2" M 1.200 -
Perlengkapan % 35.000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 11,670.000


E Overhead & Profit 10% x D 1,167.000
F Harga Satuan Pekerjaan (D+E) 12,837.000

12.14 Pemasangan 1 m' pipa PVC tipe AW diameter 2"


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.054 70,000.00 3,780.000
Tukang batu L.02 OH 0.090 75,000.00 6,750.000
Kepala Tukang L.03 OH 0.009 95,000.00 855.000
Mandor L.04 OH 0.0030 95,000.00 285.000
JUMLAH TENAGA KERJA 11,670.000
B BAHAN
Pipa PVC 2" M 1.200 -
Perlengkapan % 35.000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 11,670.000


E Overhead & Profit 10% x D 1,167.000
F Harga Satuan Pekerjaan (D+E) 12,837.000
12.15 Pemasangan 1 m' pipa PVC tipe AW diameter 2 1/2"
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.081 70,000.00 5,670.000
Tukang batu L.02 OH 0.135 75,000.00 10,125.000
Kepala Tukang L.03 OH 0.0135 95,000.00 1,282.500
Mandor L.04 OH 0.0040 95,000.00 380.000
JUMLAH TENAGA KERJA 17,457.500
B BAHAN
Pipa PVC 2" M 1.200 20,625.00 24,750.00
Perlengkapan % 35.000 7,218.75 7,218.75
JUMLAH HARGA BAHAN 31,968.750
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 49,426.250


E Overhead & Profit 10% x D 4,942.625
F Harga Satuan Pekerjaan (D+E) 54,368.875

12.16 Pemasangan 1 m' pipa PVC tipe AW diameter 3"


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.081 70,000.00 5,670.000
Tukang batu L.02 OH 0.135 75,000.00 10,125.000
Kepala Tukang L.03 OH 0.0135 95,000.00 1,282.500
Mandor L.04 OH 0.0040 95,000.00 380.000
JUMLAH TENAGA KERJA 17,457.500
B BAHAN
Pipa PVC 3" M 1.200 45,000.00 54,000.00
Perlengkapan % 35.000 15,750.00 15,750.00
JUMLAH HARGA BAHAN 69,750.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 87,207.500


E Overhead & Profit 10% x D 8,720.750
F Harga Satuan Pekerjaan (D+E) 95,928.250

12.17 Pemasangan 1 m' pipa PVC tipe AW diameter 4"


Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.081 70,000.00 5,670.000
Tukang batu L.02 OH 0.135 75,000.00 10,125.000
Kepala Tukang L.03 OH 0.0135 95,000.00 1,282.500
Mandor L.04 OH 0.0040 95,000.00 380.000
JUMLAH TENAGA KERJA 17,457.500
B BAHAN
Pipa PVC 4" M 1.200 57,500.00 69,000.00
Perlengkapan % 35.000 20,125.00 20,125.00
JUMLAH HARGA BAHAN 89,125.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 106,582.500


E Overhead & Profit 10% x D 10,658.250
F Harga Satuan Pekerjaan (D+E) 117,240.750
HARGA SATUAN PEKERJAAN KUNCI DAN KACA

10.1 Pemasangan 1 buah kunci tanam biasa


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 70,000.00 700.000
Tukang kayu L.02 OH 0.500 75,000.00 37,500.000
Kepala Tukang L.03 OH 0.050 95,000.00 4,750.000
Mandor L.04 OH 0.005 95,000.00 475.000
JUMLAH TENAGA KERJA 43,425.000
B BAHAN
Kunci tanam biasa bh 1.0000 130,000.00 130,000.000
JUMLAH HARGA BAHAN 130,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 173,425.000


E Overhead & Profit 10% x D 17,342.500
F Harga Satuan Pekerjaan (D+E) 190,767.500

10.2 Pemasangan 1 buah kunci kamar mandi


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 70,000.00 700.000
Tukang kayu L.02 OH 0.500 75,000.00 37,500.000
Kepala Tukang L.03 OH 0.050 95,000.00 4,750.000
Mandor L.04 OH 0.005 95,000.00 475.000
JUMLAH TENAGA KERJA 43,425.000
B BAHAN
Kunci tanam KM bh 1.0000 130,000.00 130,000.000
JUMLAH HARGA BAHAN 130,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 173,425.000


E Overhead & Profit 10% x D 17,342.500
F Harga Satuan Pekerjaan (D+E) 190,767.500

10.3 Pemasangan 1 buah kunci silinder


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.005 70,000.00 350.000
Tukang kayu L.02 OH 0.500 75,000.00 37,500.000
Kepala Tukang L.03 OH 0.050 95,000.00 4,750.000
Mandor L.04 OH 0.003 95,000.00 285.000
JUMLAH TENAGA KERJA 42,885.000
B BAHAN
Kunci silinder bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,885.000


E Overhead & Profit 10% x D 4,288.500
F Harga Satuan Pekerjaan (D+E) 47,173.500
10.4 Pemasangan 1 buah engsel pintu
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.000
Tukang kayu L.02 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.03 OH 0.015 95,000.00 1,425.000
Mandor L.04 OH 0.0008 95,000.00 76.000
JUMLAH TENAGA KERJA 13,801.000
B BAHAN
Engsel pintu bh 1.0000 25,000.00 25,000.000
JUMLAH HARGA BAHAN 25,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 38,801.000


E Overhead & Profit 10% x D 3,880.100
F Harga Satuan Pekerjaan (D+E) 42,681.100

10.5 Pemasangan 1 buah engsel jendela kupu-kupu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 70,000.00 700.000
Tukang kayu L.02 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.03 OH 0.010 95,000.00 950.000
Mandor L.04 OH 0.0005 95,000.00 47.500
JUMLAH TENAGA KERJA 9,197.500
B BAHAN
Engsel kupu-kupu bh 1.0000 22,000.00 22,000.000
JUMLAH HARGA BAHAN 22,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,197.500


E Overhead & Profit 10% x D 3,119.750
F Harga Satuan Pekerjaan (D+E) 34,317.250

10.6 Pemasangan 1 buah engsel angin


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.000
Tukang kayu L.02 OH 0.200 75,000.00 15,000.000
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.000
Mandor L.04 OH 0.0005 95,000.00 47.500
JUMLAH TENAGA KERJA 23,947.500
B BAHAN
Engsel angin bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 23,947.500


E Overhead & Profit 10% x D 2,394.750
F Harga Satuan Pekerjaan (D+E) 26,342.250
10.7 Pemasangan 1 psg kait angin
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.000
Tukang kayu L.02 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.03 OH 0.015 95,000.00 1,425.000
Mandor L.04 OH 0.0008 95,000.00 76.000
JUMLAH TENAGA KERJA 13,801.000
B BAHAN
Kait angin psg 1.0000 12,000.00 12,000.000
JUMLAH HARGA BAHAN 12,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 25,801.000


E Overhead & Profit 10% x D 2,580.100
F Harga Satuan Pekerjaan (D+E) 28,381.100

10.8 Pemasangan 1 buah Handel jendela


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.000
Tukang kayu L.02 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.03 OH 0.015 95,000.00 1,425.000
Mandor L.04 OH 0.0008 95,000.00 76.000
JUMLAH TENAGA KERJA 13,801.000
B BAHAN
Handel jendela bh 1.0000 12,000.00 12,000.000
JUMLAH HARGA BAHAN 12,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 25,801.000


E Overhead & Profit 10% x D 2,580.100
F Harga Satuan Pekerjaan (D+E) 28,381.100

10.9 Pemasangan 1 buah Grendel jendela


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.000
Tukang kayu L.02 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.03 OH 0.015 95,000.00 1,425.000
Mandor L.04 OH 0.0008 95,000.00 76.000
JUMLAH TENAGA KERJA 13,801.000
B BAHAN
Grandel jendela bh 1.0000 10,000.00 10,000.000
JUMLAH HARGA BAHAN 10,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 23,801.000


E Overhead & Profit 10% x D 2,380.100
F Harga Satuan Pekerjaan (D+E) 26,181.100
10.10 Pemasangan 1 psg Espagnolet Tanam
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 70,000.00 700.000
Tukang kayu L.02 OH 0.500 75,000.00 37,500.000
Kepala Tukang L.03 OH 0.010 95,000.00 950.000
Mandor L.04 OH 0.005 95,000.00 475.000
JUMLAH TENAGA KERJA 39,625.000
B BAHAN
Espagnolet Tanam psg 1.0000 125,000.00 125,000.000
JUMLAH HARGA BAHAN 125,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 164,625.000


E Overhead & Profit 10% x D 16,462.500
F Harga Satuan Pekerjaan (D+E) 181,087.500

10.11 Pemasangan 1 buah door closer


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500.000
Tukang kayu L.02 OH 0.500 75,000.00 37,500.000
Kepala Tukang L.03 OH 0.050 95,000.00 4,750.000
Mandor L.04 OH 0.0030 95,000.00 285.000
JUMLAH TENAGA KERJA 46,035.000
B BAHAN
Door closer bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,035.000


E Overhead & Profit 10% x D 4,603.500
F Harga Satuan Pekerjaan (D+E) 50,638.500

10.12 Pemasangan 1 buah kunci slot


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 70,000.00 1,400.000
Tukang kayu L.02 OH 0.200 75,000.00 15,000.000
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.000
Mandor L.04 OH 0.0010 95,000.00 95.000
JUMLAH TENAGA KERJA 18,395.000
B BAHAN
Kunci slot bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 18,395.000


E Overhead & Profit 10% x D 1,839.500
F Harga Satuan Pekerjaan (D+E) 20,234.500
10.13 Pemasangan 1 buah rel pintu sorong
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 70,000.00 4,200.000
Tukang kayu L.02 OH 0.600 75,000.00 45,000.000
Kepala Tukang L.03 OH 0.060 95,000.00 5,700.000
Mandor L.04 OH 0.0030 95,000.00 285.000
JUMLAH TENAGA KERJA 55,185.000
B BAHAN
Rel pintu sorong bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 55,185.000


E Overhead & Profit 10% x D 5,518.500
F Harga Satuan Pekerjaan (D+E) 60,703.500

10.14 Pemasangan 1 buah kunci lemari


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 70,000.00 1,750.000
Tukang kayu L.02 OH 0.250 75,000.00 18,750.000
Kepala Tukang L.03 OH 0.025 95,000.00 2,375.000
Mandor L.04 OH 0.0013 95,000.00 123.500
JUMLAH TENAGA KERJA 22,998.500
B BAHAN
Kunci lemari bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 22,998.500


E Overhead & Profit 10% x D 2,299.850
F Harga Satuan Pekerjaan (D+E) 25,298.350

10.15 Pemasangan 1 m 2 kaca tebal 3 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.000
Tukang kayu L.02 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.03 OH 0.015 95,000.00 1,425.000
Mandor L.04 OH 0.0008 95,000.00 76.000
JUMLAH TENAGA KERJA 13,801.000
B BAHAN
Kaca tebal 3 mm m2 1.1000 90,000.00 99,000.000
Sealent kg 0.0500 50,000.00 2,500.000
JUMLAH HARGA BAHAN 101,500.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 115,301.000


E Overhead & Profit 10% x D 11,530.100
F Harga Satuan Pekerjaan (D+E) 126,831.100
10.16 Pemasangan 1 m 2 kaca tebal 5 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.000
Tukang kayu L.02 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.03 OH 0.015 95,000.00 1,425.000
Mandor L.04 OH 0.0008 95,000.00 76.000
JUMLAH TENAGA KERJA 13,801.000
B BAHAN
Kaca tebal 5 mm m2 1.1000 150,000.00 165,000.000
Sealent kg 0.0500 50,000.00 2,500.000
JUMLAH HARGA BAHAN 167,500.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 181,301.000


E Overhead & Profit 10% x D 18,130.100
F Harga Satuan Pekerjaan (D+E) 199,431.100

10.17 Pemasangan 1 m 2 kaca tebal 8 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.017 70,000.00 1,190.000
Tukang kayu L.02 OH 0.170 75,000.00 12,750.000
Kepala Tukang L.03 OH 0.017 95,000.00 1,615.000
Mandor L.04 OH 0.0009 95,000.00 85.500
JUMLAH TENAGA KERJA 15,640.500
B BAHAN
Kaca tebal 8 mm m2 1.1000 -
Sealent kg 0.0700 50,000.00 3,500.000
JUMLAH HARGA BAHAN 3,500.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 19,140.500


E Overhead & Profit 10% x D 1,914.050
F Harga Satuan Pekerjaan (D+E) 21,054.550

10.18 Pemasangan 1 m 2 kaca tebal 12 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 70,000.00 1,750.000
Tukang kayu L.02 OH 0.250 75,000.00 18,750.000
Kepala Tukang L.03 OH 0.025 95,000.00 2,375.000
Mandor L.04 OH 0.0013 95,000.00 123.500
JUMLAH TENAGA KERJA 22,998.500
B BAHAN
Kaca tebal 8 mm m2 1.1000 -
Sealent kg 0.0700 50,000.00
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 22,998.500


E Overhead & Profit 10% x D 2,299.850
F Harga Satuan Pekerjaan (D+E) 25,298.350
10.19 Pemasangan 1 m 2 kaca cermin tebal 5 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.000
Tukang kayu L.02 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.03 OH 0.015 95,000.00 1,425.000
Mandor L.04 OH 0.0080 95,000.00 760.000
JUMLAH TENAGA KERJA 14,485.000
B BAHAN
Kaca tebal 8 mm m2 1.1000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 14,485.000


E Overhead & Profit 10% x D 1,448.500
F Harga Satuan Pekerjaan (D+E) 15,933.500
HARGA SATUAN PEKERJAAN PENGECATAN

11.1 1 m 2 Pengikisan/pengerokan permukaan cat lama


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.00
Mandor L.04 OH 0.0030 95,000.00 285.00
JUMLAH TENAGA KERJA 1,335.00
B BAHAN
Soda api kg 0.0500 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 1,335.00


E Overhead & Profit 10% x D 133.50
F Harga Satuan Pekerjaan (D+E) 1,468.50

11.2 1 m 2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 70,000.00 4,900.00
Tukang cat L.02 OH 0.009 75,000.00 675.00
Kepala Tukang L.03 OH 0.008 95,000.00 760.00
Mandor L.04 OH 0.0030 95,000.00 285.00
JUMLAH TENAGA KERJA 6,620.00
B BAHAN
Cat manie kg 0.200 25,000.00 5,000.00
Plamuur kg 0.150 22,000.00 3,300.00
Cat dasar kg 0.170 20,300.00 3,451.00
Cat penutup kg 0.260 57,000.00 14,820.00
Kuas bh 0.010 15,000.00 150.00
Pengencer kg 0.030 7,500.00 225.00
Ampelas lbr 0.200 7,500.00 1,500.00
JUMLAH HARGA BAHAN 28,446.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 35,066.00


E Overhead & Profit 10% x D 3,506.60
F Harga Satuan Pekerjaan (D+E) 38,572.60
11.3 1 m 2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 70,000.00 4,900.00
Tukang cat L.02 OH 0.105 75,000.00 7,875.00
Kepala Tukang L.03 OH 0.004 95,000.00 380.00
Mandor L.04 OH 0.0030 95,000.00 285.00
JUMLAH TENAGA KERJA 13,440.00
B BAHAN
Cat manie kg 0.200 25,000.00 5,000.00
Plamuur kg 0.150 22,000.00 3,300.00
Cat dasar kg 0.170 20,300.00 3,451.00
Cat penutup kg 0.350 57,000.00 19,950.00
Kuas bh 0.010 15,000.00 150.00
Pengencer kg 0.030 7,500.00 225.00
Ampelas lbr 0.200 7,500.00 1,500.00
JUMLAH HARGA BAHAN 33,576.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 47,016.00


E Overhead & Profit 10% x D 4,701.60
F Harga Satuan Pekerjaan (D+E) 51,717.60

11.4 Pengecatan 1 m 2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 70,000.00 1,400.00
Tukang cat L.02 OH 0.063 75,000.00 4,725.00
Kepala Tukang L.03 OH 0.006 95,000.00 598.50
Mandor L.04 OH 0.0030 95,000.00 285.00
JUMLAH TENAGA KERJA 7,008.50
B BAHAN
Plamuur kg 0.100 22,000.00 2,200.00
Cat dasar kg 0.100 20,300.00 2,030.00
Cat penutup kg 0.260 23,320.00 6,063.20
JUMLAH HARGA BAHAN 10,293.20
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 17,301.70


E Overhead & Profit 10% x D 1,730.17
F Harga Satuan Pekerjaan (D+E) 19,031.87
11.5 Pengecatan 1 m 2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 70,000.00 1,960.00
Tukang cat L.02 OH 0.042 75,000.00 3,150.00
Kepala Tukang L.03 OH 0.004 95,000.00 399.00
Mandor L.04 OH 0.0030 95,000.00 285.00
JUMLAH TENAGA KERJA 5,794.00
B BAHAN
Cat dasar kg 0.120 20,300.00 2,436.00
Cat penutup kg 0.180 23,320.00 4,197.60
JUMLAH HARGA BAHAN 6,633.60
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 12,427.60


E Overhead & Profit 10% x D 1,242.76
F Harga Satuan Pekerjaan (D+E) 13,670.36

11.6 Pemasangan 1 m 2 wallpaper


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 70,000.00 1,400.00
Tukang cat L.02 OH 0.200 75,000.00 15,000.00
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.00
Mandor L.04 OH 0.0025 95,000.00 237.50
JUMLAH TENAGA KERJA 18,537.50
B BAHAN
Wallpaper m2 1.200 66,000.00 79,200.00
Lem kg 0.200 100,000.00 20,000.00
JUMLAH HARGA BAHAN 99,200.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 117,737.50


E Overhead & Profit 10% x D 11,773.75
F Harga Satuan Pekerjaan (D+E) 129,511.25
11.7 Pengecatan 1 m 2 permukaan baja dengan manie besi
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 70,000.00 1,400.00
Tukang cat L.02 OH 0.200 75,000.00 15,000.00
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.00
Mandor L.04 OH 0.0025 95,000.00 237.50
JUMLAH TENAGA KERJA 18,537.50
B BAHAN
manie besi m2 0.100 21,400.00 2,140.00
kwas kg 0.010 17,000.00 170.00
JUMLAH HARGA BAHAN 2,310.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 20,847.50


E Overhead & Profit 10% x D 2,084.75
F Harga Satuan Pekerjaan (D+E) 22,932.25
HARGA SATUAN PEKERJAAN PLAFOND DAN ATAP

8.1 Pemasangan 1 m 2 langit-langit asbes semen tebal 3 mm, 5 mm, 6 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.030 70,000.00 2,100.000
Tukang kayu L.02 OH 0.070 75,000.00 5,250.000
Kepala Tukang L.03 OH 0.007 95,000.00 665.000
Mandor L.04 OH 0.004 95,000.00 380.000
JUMLAH TENAGA KERJA 8,395.000
B BAHAN
Asbes semen lbr 1.100 -
paku tripleks kg 0.010 20,000.00 200.000
JUMLAH HARGA BAHAN 200.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 8,595.000


E Overhead & Profit 10% x D 859.500
F Harga Satuan Pekerjaan (D+E) 9,454.500

8.2 Pemasangan 1 m 2 langit-langit tripleks ukuran (120x240)cm, tebal 3 mm, 4 mm, 6 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.000
Tukang kayu L.02 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.03 OH 0.010 95,000.00 950.000
Mandor L.04 OH 0.005 95,000.00 475.000
JUMLAH TENAGA KERJA 15,925.000
B BAHAN
tripleks 3 mm lbr 0.375 54,000.00 20,250.000
Paku tripleks kg 0.030 20,000.00 600.000
JUMLAH HARGA BAHAN 20,850.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 36,775.000


E Overhead & Profit 10% x D 3,677.500
F Harga Satuan Pekerjaan (D+E) 40,452.500
8.3 Pemasangan 1 m 2 langit-langit gypsum board ukuran (120x240)cm, tebal 4 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.000
Tukang kayu L.02 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.03 OH 0.010 95,000.00 950.000
Mandor L.04 OH 0.005 95,000.00 475.000
JUMLAH TENAGA KERJA 15,925.000
B BAHAN
Gypsum board lbr 0.375 70,000.00 26,250.000
paku skrup kg 0.030 38,700.00 1,161.000
JUMLAH HARGA BAHAN 27,411.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 43,336.000


E Overhead & Profit 10% x D 4,333.600
F Harga Satuan Pekerjaan (D+E) 47,669.600

8.4 Pemasangan 1 m 2 langit-langit gypsum board ukuran (120x240)cm, tebal 6 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.000
Tukang kayu L.02 OH 0.050 75,000.00 3,750.000
Kepala Tukang L.03 OH 0.005 95,000.00 475.000
Mandor L.04 OH 0.005 95,000.00 475.000
JUMLAH TENAGA KERJA 11,700.000
B BAHAN
Gypsum board lbr 0.364 110,000.00 40,040.000
paku skrup kg 0.110 38,700.00 4,257.000
JUMLAH HARGA BAHAN 44,297.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 55,997.000


E Overhead & Profit 10% x D 5,599.700
F Harga Satuan Pekerjaan (D+E) 61,596.700

8.5 Pemasangan 1 m 2 langit-langit akustik ukuran (60x120)cm, berikut rangka aluminium


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 70,000.00 35,000.000
Tukang kayu L.02 OH 0.500 75,000.00 37,500.000
Kepala Tukang L.03 OH 0.050 95,000.00 4,750.000
Mandor L.04 OH 0.025 95,000.00 2,375.000
JUMLAH TENAGA KERJA 79,625.000
B BAHAN
Profil allum "T" m 3.600 14,000.00 50,400.000
Kawat dia 4 mm kg 0.150 12,000.00 1,800.000
ramset bh 1.050 6,500,000.00 6,825,000.000
akustik 60x120 lbr 1.500 50,000.00 75,000.000
JUMLAH HARGA BAHAN 6,952,200.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 7,031,825.000


E Overhead & Profit 10% x D 703,182.500
F Harga Satuan Pekerjaan (D+E) 7,735,007.500
8.6 Pemasangan 1 m1 list langit-langit kayu profil
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500.000
Tukang kayu L.02 OH 0.050 75,000.00 3,750.000
Kepala Tukang L.03 OH 0.005 95,000.00 475.000
Mandor L.04 OH 0.003 95,000.00 285.000
JUMLAH TENAGA KERJA 8,010.000
B BAHAN
List kayu profil m 1.050 7,500.00 7,875.000
Paku kg 0.010 20,000.00 200.000
JUMLAH HARGA BAHAN 8,075.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,085.000


E Overhead & Profit 10% x D 1,608.500
F Harga Satuan Pekerjaan (D+E) 17,693.500

8.7 Pemasangan 1 m List langit-langit Gypsum


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500.000
Tukang kayu L.02 OH 0.050 75,000.00 3,750.000
Kepala Tukang L.03 OH 0.005 95,000.00 475.000
Mandor L.04 OH 0.003 95,000.00 285.000
JUMLAH TENAGA KERJA 8,010.000
B BAHAN
List kayu profil m 1.050 28,000.00 29,400.000
Paku kg 0.010 38,700.00 387.000
JUMLAH HARGA BAHAN 29,787.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 37,797.000


E Overhead & Profit 10% x D 3,779.700
F Harga Satuan Pekerjaan (D+E) 41,576.700

8.7 Pemasangan 1 m 2 atap asbes gelombang 0,92mx2,5mx5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.000
Tukang kayu L.02 OH 0.075 75,000.00 5,625.000
Kepala Tukang L.03 OH 0.008 95,000.00 760.000
Mandor L.04 OH 0.008 95,000.00 760.000
JUMLAH TENAGA KERJA 16,945.000
B BAHAN
Asbes gel 92x250 lbr 0.500 -
paku pancing 6x23 kg 0.120 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,945.000


E Overhead & Profit 10% x D 1,694.500
F Harga Satuan Pekerjaan (D+E) 18,639.500
8.8 Pemasangan 1 m 2 atap asbes gelombang 0,92mx2,25mx5mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.000
Tukang kayu L.02 OH 0.075 75,000.00 5,625.000
Kepala Tukang L.03 OH 0.008 95,000.00 760.000
Mandor L.04 OH 0.008 95,000.00 760.000
JUMLAH TENAGA KERJA 16,945.000
B BAHAN
Asbes gel 92x250 lbr 0.600 -
paku pancing 6x23 kg 0.120 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,945.000


E Overhead & Profit 10% x D 1,694.500
F Harga Satuan Pekerjaan (D+E) 18,639.500

8.9 Pemasangan 1 m 2 atap asbes gelombang 0,92mx1,5mx5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.000
Tukang kayu L.02 OH 0.075 75,000.00 5,625.000
Kepala Tukang L.03 OH 0.008 95,000.00 760.000
Mandor L.04 OH 0.008 95,000.00 760.000
JUMLAH TENAGA KERJA 16,945.000
B BAHAN
Asbes gel 92x250 lbr 0.750 -
paku pancing 6x23 kg 0.120 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,945.000


E Overhead & Profit 10% x D 1,694.500
F Harga Satuan Pekerjaan (D+E) 18,639.500
8.10 Pemasangan 1 m 2 genteng beton
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.000
Tukang kayu L.03 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.11 OH 0.010 95,000.00 950.000
Mandor L.15 OH 0.010 95,000.00 950.000
JUMLAH TENAGA KERJA 23,400.000
B BAHAN
Genteng beton bh 11.000 -
Paku biasa 2"-5" kg 0.030 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 23,400.000


E Overhead & Profit 10% x D 2,340.000
F Harga Satuan Pekerjaan (D+E) 25,740.000

8.11 Pemasangan 1 m 2 genteng aspal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.000
Tukang kayu L.03 OH 0.300 75,000.00 22,500.000
Kepala Tukang L.11 OH 0.003 95,000.00 285.000
Mandor L.15 OH 0.010 95,000.00 950.000
JUMLAH TENAGA KERJA 37,735.000
B BAHAN
Genteng aspal bh 6.900 -
Plywood 6mm lbr 0.350 -
Paku biasa 1/2"-1" kg 0.030 -
Plastic aerator bh 0.500 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 37,735.000


E Overhead & Profit 10% x D 3,773.500
F Harga Satuan Pekerjaan (D+E) 41,508.500
8.12 Pemasangan 1 m 2 genteng metal
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.000
Tukang kayu L.03 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.11 OH 0.010 95,000.00 950.000
Mandor L.15 OH 0.001 95,000.00 95.000
JUMLAH TENAGA KERJA 22,545.000
B BAHAN
Genteng metal bh 1.020 29,000.00 29,580.000
Paku biasa 1/2"-1" kg 0.200 25,000.00 5,000.000
JUMLAH HARGA BAHAN 34,580.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 57,125.000


E Overhead & Profit 10% x D 5,712.500
F Harga Satuan Pekerjaan (D+E) 62,837.500

8.13 Pemasangan 1 m 2 atap sirap kayu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.000
Tukang kayu L.03 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.11 OH 0.010 95,000.00 950.000
Mandor L.15 OH 0.001 95,000.00 95.000
JUMLAH TENAGA KERJA 22,545.000
B BAHAN
Sirap kayu bh 30.000 -
Paku biasa 1/2"-1" kg 0.200 25,000.00 5,000.000
JUMLAH HARGA BAHAN 5,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 27,545.000


E Overhead & Profit 10% x D 2,754.500
F Harga Satuan Pekerjaan (D+E) 30,299.500
8.14 Pemasangan 1 m 1 nok genteng beton
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.000
Tukang kayu L.03 OH 0.200 75,000.00 15,000.000
Kepala Tukang L.11 OH 0.020 95,000.00 1,900.000
Mandor L.15 OH 0.020 95,000.00 1,900.000
JUMLAH TENAGA KERJA 46,800.000
B BAHAN
Nok genteng beton bh 3.500 -
Paku biasa 1/2"-1" kg 0.050 25,000.00 1,250.000
Semen PC kg 10.800 -
Pasir pasang m3 0.032 -
Semen warna kg 1.000 -
JUMLAH HARGA BAHAN 1,250.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 48,050.000


E Overhead & Profit 10% x D 4,805.000
F Harga Satuan Pekerjaan (D+E) 52,855.000

8.15 Pemasangan 1 m 1 nok genteng aspal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.125 70,000.00 8,750.000
Tukang kayu L.03 OH 0.250 75,000.00 18,750.000
Kepala Tukang L.11 OH 0.025 95,000.00 2,375.000
Mandor L.15 OH 0.006 95,000.00 570.000
JUMLAH TENAGA KERJA 30,445.000
B BAHAN
Nok genteng beton bh 2.000 25,000.00 50,000.000
Paku biasa 1/2"-1" kg 0.050 25,000.00 1,250.000
Semen PC kg 0.0035 -
JUMLAH HARGA BAHAN 51,250.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 81,695.000


E Overhead & Profit 10% x D 8,169.500
F Harga Satuan Pekerjaan (D+E) 89,864.500
8.16 Pemasangan 1 m 1 nok genteng metal
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.000
Tukang kayu L.03 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.11 OH 0.015 95,000.00 1,425.000
Mandor L.15 OH 0.013 95,000.00 1,235.000
JUMLAH TENAGA KERJA 31,410.000
B BAHAN
Nok genteng beton bh 1.100 25,000.00 27,500.000
Paku Payung 1/2"-1" kg 0.050 20,000.00 1,000.000
JUMLAH HARGA BAHAN 28,500.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,910.000


E Overhead & Profit 10% x D 5,991.000
F Harga Satuan Pekerjaan (D+E) 65,901.000

8.17 Pemasangan 1 m 1 nok sirap


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.125 70,000.00 8,750.000
Tukang kayu L.03 OH 0.250 75,000.00 18,750.000
Kepala Tukang L.11 OH 0.025 95,000.00 2,375.000
Mandor L.15 OH 0.006 95,000.00 570.000
JUMLAH TENAGA KERJA 30,445.000
B BAHAN
Seng plat 3x6" bh 0.400 -
Paku biasa 1/2"-1" kg 0.050 20,000.00 1,000.000
Paku biasa 2"-5" kg 0.050 -
JUMLAH HARGA BAHAN 1,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,445.000


E Overhead & Profit 10% x D 3,144.500
F Harga Satuan Pekerjaan (D+E) 34,589.500
8.18 Pemasangan 1 m 2 atap seng gelombang
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 70,000.00 8,400.000
Tukang kayu L.03 OH 0.060 75,000.00 4,500.000
Kepala Tukang L.11 OH 0.006 95,000.00 570.000
Mandor L.15 OH 0.006 95,000.00 570.000
JUMLAH TENAGA KERJA 14,040.000
B BAHAN
Seng plat 3x6" bh 0.700 36,000.00 25,200.000
Paku biasa 1/2"-1" kg 0.020 20,000.00 400.000
JUMLAH HARGA BAHAN 25,600.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 39,640.000


E Overhead & Profit 10% x D 3,964.000
F Harga Satuan Pekerjaan (D+E) 43,604.000

8.19 Pemasangan 1 m 1 nok atap seng


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.000
Tukang kayu L.03 OH 0.070 75,000.00 5,250.000
Kepala Tukang L.11 OH 0.007 95,000.00 665.000
Mandor L.15 OH 0.006 95,000.00 570.000
JUMLAH TENAGA KERJA 16,985.000
B BAHAN
Seng plat 3x6" bjls28 bh 0.300 -
Paku biasa 1/2"-1" kg 0.040 20,000.00
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,985.000


E Overhead & Profit 10% x D 1,698.500
F Harga Satuan Pekerjaan (D+E) 18,683.500
HARGA SATUAN PEKERJAAN ATAP

8.7 Pemasangan 1 m 2 atap asbes gelombang 0,92mx2,5mx5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.000
Tukang kayu L.02 OH 0.075 75,000.00 5,625.000
Kepala Tukang L.03 OH 0.008 95,000.00 760.000
Mandor L.04 OH 0.008 95,000.00 760.000
JUMLAH TENAGA KERJA 16,945.000
B BAHAN
Asbes gel 92x250 lbr 0.500 -
paku pancing 6x23 kg 0.120 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,945.000


E Overhead & Profit 10% x D 1,694.500
F Harga Satuan Pekerjaan (D+E) 18,639.500
8.8 Pemasangan 1 m 2 atap asbes gelombang 0,92mx2,25mx5mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.000
Tukang kayu L.02 OH 0.075 75,000.00 5,625.000
Kepala Tukang L.03 OH 0.008 95,000.00 760.000
Mandor L.04 OH 0.008 95,000.00 760.000
JUMLAH TENAGA KERJA 16,945.000
B BAHAN
Asbes gel 92x250 lbr 0.600 -
paku pancing 6x23 kg 0.120 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,945.000


E Overhead & Profit 10% x D 1,694.500
F Harga Satuan Pekerjaan (D+E) 18,639.500

8.9 Pemasangan 1 m 2 atap asbes gelombang 0,92mx1,5mx5mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.000
Tukang kayu L.02 OH 0.075 75,000.00 5,625.000
Kepala Tukang L.03 OH 0.008 95,000.00 760.000
Mandor L.04 OH 0.008 95,000.00 760.000
JUMLAH TENAGA KERJA 16,945.000
B BAHAN
Asbes gel 92x250 lbr 0.750 -
paku pancing 6x23 kg 0.120 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,945.000


E Overhead & Profit 10% x D 1,694.500
F Harga Satuan Pekerjaan (D+E) 18,639.500
8.10 Pemasangan 1 m 2 genteng beton
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.000
Tukang kayu L.03 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.11 OH 0.010 95,000.00 950.000
Mandor L.15 OH 0.010 95,000.00 950.000
JUMLAH TENAGA KERJA 23,400.000
B BAHAN
Genteng beton bh 11.000 -
Paku biasa 2"-5" kg 0.030 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 23,400.000


E Overhead & Profit 10% x D 2,340.000
F Harga Satuan Pekerjaan (D+E) 25,740.000

8.11 Pemasangan 1 m 2 genteng aspal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.000
Tukang kayu L.03 OH 0.300 75,000.00 22,500.000
Kepala Tukang L.11 OH 0.003 95,000.00 285.000
Mandor L.15 OH 0.010 95,000.00 950.000
JUMLAH TENAGA KERJA 37,735.000
B BAHAN
Genteng aspal bh 6.900 -
Plywood 6mm lbr 0.350 -
Paku biasa 1/2"-1" kg 0.030 -
Plastic aerator bh 0.500 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 37,735.000


E Overhead & Profit 10% x D 3,773.500
F Harga Satuan Pekerjaan (D+E) 41,508.500
8.12 Pemasangan 1 m 2 genteng metal
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.000
Tukang kayu L.03 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.11 OH 0.010 95,000.00 950.000
Mandor L.15 OH 0.001 95,000.00 95.000
JUMLAH TENAGA KERJA 22,545.000
B BAHAN
Genteng metal bh 1.020 29,000.00 29,580.000
Paku biasa 1/2"-1" kg 0.200 25,000.00 5,000.000
JUMLAH HARGA BAHAN 34,580.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 57,125.000


E Overhead & Profit 10% x D 5,712.500
F Harga Satuan Pekerjaan (D+E) 62,837.500

8.13 Pemasangan 1 m 2 atap sirap kayu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.000
Tukang kayu L.03 OH 0.100 75,000.00 7,500.000
Kepala Tukang L.11 OH 0.010 95,000.00 950.000
Mandor L.15 OH 0.001 95,000.00 95.000
JUMLAH TENAGA KERJA 22,545.000
B BAHAN
Sirap kayu bh 30.000 -
Paku biasa 1/2"-1" kg 0.200 25,000.00 5,000.000
JUMLAH HARGA BAHAN 5,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 27,545.000


E Overhead & Profit 10% x D 2,754.500
F Harga Satuan Pekerjaan (D+E) 30,299.500
8.14 Pemasangan 1 m 1 nok genteng beton
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.000
Tukang kayu L.03 OH 0.200 75,000.00 15,000.000
Kepala Tukang L.11 OH 0.020 95,000.00 1,900.000
Mandor L.15 OH 0.020 95,000.00 1,900.000
JUMLAH TENAGA KERJA 46,800.000
B BAHAN
Nok genteng beton bh 3.500 -
Paku biasa 1/2"-1" kg 0.050 25,000.00 1,250.000
Semen PC kg 10.800 -
Pasir pasang m3 0.032 -
Semen warna kg 1.000 -
JUMLAH HARGA BAHAN 1,250.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 48,050.000


E Overhead & Profit 10% x D 4,805.000
F Harga Satuan Pekerjaan (D+E) 52,855.000

8.15 Pemasangan 1 m 1 nok genteng aspal


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.125 70,000.00 8,750.000
Tukang kayu L.03 OH 0.250 75,000.00 18,750.000
Kepala Tukang L.11 OH 0.025 95,000.00 2,375.000
Mandor L.15 OH 0.006 95,000.00 570.000
JUMLAH TENAGA KERJA 30,445.000
B BAHAN
Nok genteng beton bh 2.000 25,000.00 50,000.000
Paku biasa 1/2"-1" kg 0.050 25,000.00 1,250.000
Semen PC kg 0.0035 -
JUMLAH HARGA BAHAN 51,250.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 81,695.000


E Overhead & Profit 10% x D 8,169.500
F Harga Satuan Pekerjaan (D+E) 89,864.500
8.16 Pemasangan 1 m 1 nok genteng metal
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.000
Tukang kayu L.03 OH 0.150 75,000.00 11,250.000
Kepala Tukang L.11 OH 0.015 95,000.00 1,425.000
Mandor L.15 OH 0.013 95,000.00 1,235.000
JUMLAH TENAGA KERJA 31,410.000
B BAHAN
Nok genteng beton bh 1.100 25,000.00 27,500.000
Paku Payung 1/2"-1" kg 0.050 20,000.00 1,000.000
JUMLAH HARGA BAHAN 28,500.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,910.000


E Overhead & Profit 10% x D 5,991.000
F Harga Satuan Pekerjaan (D+E) 65,901.000

8.17 Pemasangan 1 m 1 nok sirap


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.125 70,000.00 8,750.000
Tukang kayu L.03 OH 0.250 75,000.00 18,750.000
Kepala Tukang L.11 OH 0.025 95,000.00 2,375.000
Mandor L.15 OH 0.006 95,000.00 570.000
JUMLAH TENAGA KERJA 30,445.000
B BAHAN
Seng plat 3x6" bh 0.400 -
Paku biasa 1/2"-1" kg 0.050 20,000.00 1,000.000
Paku biasa 2"-5" kg 0.050 -
JUMLAH HARGA BAHAN 1,000.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,445.000


E Overhead & Profit 10% x D 3,144.500
F Harga Satuan Pekerjaan (D+E) 34,589.500
8.18 Pemasangan 1 m 2 atap seng gelombang
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 70,000.00 8,400.000
Tukang kayu L.03 OH 0.060 75,000.00 4,500.000
Kepala Tukang L.11 OH 0.006 95,000.00 570.000
Mandor L.15 OH 0.006 95,000.00 570.000
JUMLAH TENAGA KERJA 14,040.000
B BAHAN
Seng plat 3x6" bh 0.700 36,000.00 25,200.000
Paku biasa 1/2"-1" kg 0.020 20,000.00 400.000
JUMLAH HARGA BAHAN 25,600.000
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 39,640.000


E Overhead & Profit 10% x D 3,964.000
F Harga Satuan Pekerjaan (D+E) 43,604.000

8.19 Pemasangan 1 m 1 nok atap seng


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.000
Tukang kayu L.03 OH 0.070 75,000.00 5,250.000
Kepala Tukang L.11 OH 0.007 95,000.00 665.000
Mandor L.15 OH 0.006 95,000.00 570.000
JUMLAH TENAGA KERJA 16,985.000
B BAHAN
Seng plat 3x6" bjls28 bh 0.300 -
Paku biasa 1/2"-1" kg 0.040 20,000.00
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,985.000


E Overhead & Profit 10% x D 1,698.500
F Harga Satuan Pekerjaan (D+E) 18,683.500
HARGA SATUAN PEKERJAAN KAYU

9.1 Pembuatan dan pemasangan 1 m 3 kusen pintu dan kusen jendela, kayu kelas I
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.000 70,000.00 490,000.00
Tukang kayu L.03 OH 21.000 75,000.00 1,575,000.00
Kepala Tukang L.03 OH 2.100 95,000.00 199,500.00
Mandor L.04 OH 0.350 95,000.00 33,250.00
JUMLAH TENAGA KERJA 2,297,750.00
B BAHAN
Balok kayu m3 1.100 6,500,000.00 7,150,000.00
Paku 10 cm kg 1.250 30,000.00 37,500.00
Lem kayu kg 1.000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 7,212,500.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 9,510,250.00


E Overhead & Profit 10% x D 951,025.00
F Harga Satuan Pekerjaan (D+E) 10,461,275.00

9.2 Pembuatan dan pemasangan 1 m 3 kusen pintu dan kusen jendela, kayu kelas II atau kelas III
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.000 70,000.00 420,000.00
Tukang kayu L.03 OH 18.000 75,000.00 1,350,000.00
Kepala Tukang L.03 OH 1.800 95,000.00 171,000.00
Mandor L.04 OH 0.300 95,000.00 28,500.00
JUMLAH TENAGA KERJA 1,969,500.00
B BAHAN
Balok kayu m3 1.200 3,000,000.00 3,600,000.00
Paku 10 cm kg 1.250 20,000.00 25,000.00
Lem kayu kg 1.000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 3,650,000.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 5,619,500.00


E Overhead & Profit 10% x D 561,950.00
F Harga Satuan Pekerjaan (D+E) 6,181,450.00
9.3 Pembuatan dan pemasangan 1 m 2 pintu klamp standart, kelas II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 70,000.00 24,500.00
Tukang kayu L.03 OH 1.050 75,000.00 78,750.00
Kepala Tukang L.03 OH 0.105 95,000.00 9,975.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
JUMLAH TENAGA KERJA 114,935.00
B BAHAN
Papan kayu m3 0.040 3,500,000.00 140,000.00
Paku 5-7 cm kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 141,000.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 255,935.00


E Overhead & Profit 10% x D 25,593.50
F Harga Satuan Pekerjaan (D+E) 281,528.50

9.4 Pembuatan dan pemasangan 1 m 2 pintu klamp sederhana, kelas III


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 70,000.00 24,500.00
Tukang kayu L.03 OH 1.050 75,000.00 78,750.00
Kepala Tukang L.03 OH 0.105 95,000.00 9,975.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
JUMLAH TENAGA KERJA 114,935.00
B BAHAN
Papan kayu m3 0.040 3,500,000.00 140,000.00
Paku 5-7 cm kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 141,000.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 255,935.00


E Overhead & Profit 10% x D 25,593.50
F Harga Satuan Pekerjaan (D+E) 281,528.50
9.5 Pembuatan dan pemasangan 1 m 2 daun pintu panel, kayu kelas I atau kelas II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang kayu L.03 OH 3.000 75,000.00 225,000.00
Kepala Tukang L.03 OH 0.300 95,000.00 28,500.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
JUMLAH TENAGA KERJA 328,250.00
B BAHAN
Papan kayu m3 0.040 3,500,000.00 140,000.00
Lem kayu kg 0.500 25,000.00 12,500.00
JUMLAH HARGA BAHAN 152,500.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 480,750.00


E Overhead & Profit 10% x D 48,075.00
F Harga Satuan Pekerjaan (D+E) 528,825.00

9.6 Pembuatan dan pemasangan 1 m 2 pintu dan jendela kaca, kayu kelas I atau kelas II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 70,000.00 56,000.00
Tukang kayu L.03 OH 2.400 75,000.00 180,000.00
Kepala Tukang L.03 OH 0.240 95,000.00 22,800.00
Mandor L.04 OH 0.040 95,000.00 3,800.00
JUMLAH TENAGA KERJA 262,600.00
B BAHAN
Papan kayu m3 0.024 3,500,000.00 84,000.00
Lem kayu kg 0.300 20,000.00 6,000.00
JUMLAH HARGA BAHAN 90,000.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 352,600.00


E Overhead & Profit 10% x D 35,260.00
F Harga Satuan Pekerjaan (D+E) 387,860.00

9.7 Pembuatan dan pemasangan 1 m 2 pintu dan jendela jalusi kayu kelas I atau kelas II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang kayu L.03 OH 3.000 75,000.00 225,000.00
Kepala Tukang L.03 OH 0.300 95,000.00 28,500.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
JUMLAH TENAGA KERJA 328,250.00
B BAHAN
Papan kayu m3 0.064 3,500,000.00 224,000.00
Lem kayu kg 0.500 20,000.00 10,000.00
JUMLAH HARGA BAHAN 234,000.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 562,250.00


E Overhead & Profit 10% x D 56,225.00
F Harga Satuan Pekerjaan (D+E) 618,475.00
9.8 Pembuatan 1 m 2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90cm)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang kayu L.03 OH 2.100 75,000.00 157,500.00
Kepala Tukang L.03 OH 0.210 95,000.00 19,950.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
JUMLAH TENAGA KERJA 229,775.00
B BAHAN
Papan kayu m3 0.025 3,500,000.00 87,500.00
Paku 1 cm - 2,5cm kg 0.030 20,000.00 600.00
Lem kayu kg 0.500 25,000.00 12,500.00
Plywood tebal 4mm Uk.90x220 cm lbr 1.000 54,000.00 54,000.00
JUMLAH HARGA BAHAN 154,600.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 384,375.00


E Overhead & Profit 10% x D 38,437.50
F Harga Satuan Pekerjaan (D+E) 422,812.50

9.9 Pembuatan 1 m 2 pintu plywood rangkap, rangka expose kayu kelas I atau kelas II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 70,000.00 56,000.00
Tukang kayu L.03 OH 2.400 75,000.00 180,000.00
Kepala Tukang L.03 OH 0.240 95,000.00 22,800.00
Mandor L.04 OH 0.040 95,000.00 3,800.00
JUMLAH TENAGA KERJA 262,600.00
B BAHAN
Papan kayu m3 0.0256 25,000.00 640.00
Paku 1 cm - 2,5cm kg 0.030 20,000.00 600.00
Lem kayu kg 0.500 25,000.00 12,500.00
Plywood tebal 4mm Uk.90x220 cm lbr 1.000 54,000.00 54,000.00
JUMLAH HARGA BAHAN 67,740.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 330,340.00


E Overhead & Profit 10% x D 33,034.00
F Harga Satuan Pekerjaan (D+E) 363,374.00

9.10 Pembuatan 1 m 2 jalusi kusen, kayu kelas II atau II


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.670 70,000.00 46,900.00
Tukang kayu L.03 OH 2.000 75,000.00 150,000.00
Kepala Tukang L.03 OH 0.200 95,000.00 19,000.00
Mandor L.04 OH 0.335 95,000.00 31,825.00
JUMLAH TENAGA KERJA 247,725.00
B BAHAN
Papan kayu m3 0.0600 25,000.00 1,500.00
Paku 1 cm - 2,5cm kg 0.150 20,000.00 3,000.00
JUMLAH HARGA BAHAN 4,500.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 252,225.00


E Overhead & Profit 10% x D 25,222.50
F Harga Satuan Pekerjaan (D+E) 277,447.50
9.11 Pembuatan 1 m 3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan II bentang 6 meter
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.000 70,000.00 280,000.00
Tukang kayu L.03 OH 12.000 75,000.00 900,000.00
Kepala Tukang L.03 OH 1.200 95,000.00 114,000.00
Mandor L.04 OH 0.200 95,000.00 19,000.00
JUMLAH TENAGA KERJA 1,313,000.00
B BAHAN
Balok kayu m3 1.1000 3,000,000.00 3,300,000.00
Besi strip tebal 5 mm kg 15.0000 10,000.00 150,000.00
Paku 12 mm kg 5.600 20,000.00 112,000.00
JUMLAH HARGA BAHAN 3,562,000.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 4,875,000.00


E Overhead & Profit 10% x D 487,500.00
F Harga Satuan Pekerjaan (D+E) 5,362,500.00

9.12 Pembuatan 1 m 3 konstruksi gordeng, kayu kelas II


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 70,000.00 469,000.00
Tukang kayu L.03 OH 20.100 75,000.00 1,507,500.00
Kepala Tukang L.03 OH 2.010 95,000.00 190,950.00
Mandor L.04 OH 0.335 95,000.00 31,825.00
JUMLAH TENAGA KERJA 2,199,275.00
B BAHAN
Balok kayu m3 1.1000 3,000,000.00 3,300,000.00
Besi strip tebal 5 mm kg 15.0000 10,000.00 150,000.00
Paku 12 mm kg 3.000 20,000.00 60,000.00
JUMLAH HARGA BAHAN 3,510,000.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 5,709,275.00


E Overhead & Profit 10% x D 570,927.50
F Harga Satuan Pekerjaan (D+E) 6,280,202.50

9.13 Pembuatan 1 m 2 rangka langit-langit (60x60) cm, kayu kelas II atau III
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang kayu L.03 OH 0.300 75,000.00 22,500.00
Kepala Tukang L.03 OH 0.030 95,000.00 2,850.00
Mandor L.04 OH 0.010 95,000.00 950.00
JUMLAH TENAGA KERJA 40,300.00
B BAHAN
kaso-kaso 5x7 cm m3 0.0163 3,000,000.00 48,900.00
Paku 7-10 cm kg 0.2500 20,000.00
JUMLAH HARGA BAHAN 48,900.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 89,200.00


E Overhead & Profit 10% x D 8,920.00
F Harga Satuan Pekerjaan (D+E) 98,120.00
9.14 Pembuatan 1 m' lisplank ukuran (3x20) cm, kayu kelas I atau II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang kayu L.03 OH 0.200 75,000.00 15,000.00
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.00
Mandor L.04 OH 0.005 95,000.00 475.00
JUMLAH TENAGA KERJA 24,375.00
B BAHAN
Papan kayu m3 0.0108 7,000,000.00 75,600.00
Paku 5 dan 7 cm kg 0.1000 20,000.00
JUMLAH HARGA BAHAN 75,600.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 99,975.00


E Overhead & Profit 10% x D 9,997.50
F Harga Satuan Pekerjaan (D+E) 109,972.50

9.15 Pembuatan 1 m' lisplank ukuran (3x30) cm, kayu kelas I atau II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang kayu L.03 OH 0.200 75,000.00 15,000.00
Kepala Tukang L.03 OH 0.020 95,000.00 1,900.00
Mandor L.04 OH 0.005 95,000.00 475.00
JUMLAH TENAGA KERJA 24,375.00
B BAHAN
Papan kayu m3 0.0110 7,000,000.00 77,000.00
Paku 5 dan 7 cm kg 0.0500 20,000.00 1,000.00
JUMLAH HARGA BAHAN 78,000.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 102,375.00


E Overhead & Profit 10% x D 10,237.50
F Harga Satuan Pekerjaan (D+E) 112,612.50

9.16 Pembuatan 1 m' lisplank GRC 0.8 x 20 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500.00
Tukang kayu L.03 OH 0.050 75,000.00 3,750.00
Kepala Tukang L.03 OH 0.005 95,000.00 475.00
Mandor L.04 OH 0.003 95,000.00 285.00
JUMLAH TENAGA KERJA 8,010.00
B BAHAN
GRC Board tebal 0.8 cm M1 1.0500 25,000.00 26,250.00
Paku Sekrup kg 0.1000 38,700.00 3,870.00
JUMLAH HARGA BAHAN 30,120.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 38,130.00


E Overhead & Profit 10% x D 3,813.00
F Harga Satuan Pekerjaan (D+E) 41,943.00
9.17 Pembuatan 1 m 2 dinding pemisah plywood rangkap, rangka kayu kelas II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang kayu L.03 OH 0.600 75,000.00 45,000.00
Kepala Tukang L.03 OH 0.060 95,000.00 5,700.00
Mandor L.04 OH 0.010 95,000.00 950.00
JUMLAH TENAGA KERJA 65,650.00
B BAHAN
Balok kayu 6 x 12 m3 0.0280 3,000,000.00 84,000.00
Paku 5 dan 10 cm kg 0.1500 20,000.00 3,000.00
Plywood 4 mm, 12x240 lbr 0.8600 54,000.00 46,440.00
lem kayu kg 0.5600 25,000.00 14,000.00
JUMLAH HARGA BAHAN 147,440.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 213,090.00


E Overhead & Profit 10% x D 21,309.00
F Harga Satuan Pekerjaan (D+E) 234,399.00

9.18 Pembuatan 1 m 2 dinding pemisah Calsium silicate 3.5 mm rangkap, rangka kayu kelas II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang kayu L.03 OH 0.600 75,000.00 45,000.00
Kepala Tukang L.03 OH 0.060 95,000.00 5,700.00
Mandor L.04 OH 0.010 95,000.00 950.00
JUMLAH TENAGA KERJA 65,650.00
B BAHAN
Balok kayu 6 x 12 m3 0.0280 3,000,000.00 84,000.00
Paku 5 dan 10 cm kg 0.1500 20,000.00 3,000.00
Calsium silicate 3.5 mm, 120x240 lbr 0.8600 70,000.00 60,200.00
lem kayu kg 0.5600 25,000.00 14,000.00
JUMLAH HARGA BAHAN 161,200.00
C PERALATAN

JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 226,850.00


E Overhead & Profit 10% x D 22,685.00
F Harga Satuan Pekerjaan (D+E) 249,535.00