You are on page 1of 2
THERMAL POWER STATION - | EXPANSION PERFORMANCE HIGHLIGHTS FOR THE YEAR 2018-19 + Achieved Gross Generation of 3079.429MU (GG: 2949.645 MU+ PS: 129.784 MU) including Power Surrender (PLF -83.70%) in 2018-19 “+ Achieved ABT Availability of 81.586% against CERC norms of 80%. + Achieved machine availability of 81.70% in 2018-19 *» Achieved Specific oil consumption of 0.725 ml/ kwhr in 2018-19 Achieved Auxiliary consumption of 8.21% in 2018-19 Achieved ever highest Disposal of Scrap of 703.890 T achieved in 2018-19 surpassing the earlier record of 486.83 T achieved in 2013-14, * Achieved the ever highest any October month Generation of 304.794 MU in 2018 surpassing the earlier record of 289.843 MU achieved in OCT-2017 in any year since inception. +o Achieved the ever highest any December month Generation of 309.880 MU in 2018 surpassing the earlier record of 299.687 MU achieved in DEC-2007 in any year since inception. Achieved the ever highest Ill Qtr Generation of 903.861 MU in 2018-19 surpassing the earlier record of 852.621 MU achieved in 2017-18 * Best Performing Thermal Power station award for Q3 in 2018-19 received from OSMG Achieved URS Power traded in 2018-19 is 189.409 MU (traded 95.20%) against the URS surrender (Bid Qty) of 198.950 MU and total traded amount is Rs. 54.58Cr with Realization is Rs.2.88/kWhr against previous year 2017-18 traded Qty. is 349.564 MU (traded 68.72%) against the URS surrender (Bid Qty) of 508.684 MU and traded amount is Rs. 102.872 Cr with Realization is Rs. 2.94/kWhr. *» Achieved DSM received for the year 2018-19 is Rs.15.71 Cr (DSM Energy 76.470MU) and Realization is Rs. 2.05/kWhr. *» All such achievements are with ‘Nil’ reportable accident. wees Demihe, (WG. * &

You might also like