DISTRIBUTION OF LOAD FOR PILE GROUP S.S.P Sdn Bhd, Oct.

1998
Job No. : Number Job Title : Title
Date : 11/7/2019 Pile Group Ref : Ref

N N.{exx.sum(xn2 ) - eyy.sum(xn.yn)} N.{eyy.sum(yn2 ) - exx.sum(xn.yn)}


Pn = { ---- ± A.yn ± B.xn }.Cn where, A = ------------------------------------------------------ B = ------------------------------------------------------------
np sum(xn2 ).sum(yn2 ) - {sum(xn).sum(yn)}2 sum(xn2 ).sum(yn2 ) - {sum(xn).sum(yn)}2

Coulmn N x-coord y-coord N.x N.y exx = 0.0000


No. (kN) (m) (m) eyy = 0.0000
A = 0.0000
C1 0.0 0.0000 0.0000 0.0 0.0 B = 0.0000

0 0.0 0.0000 0.0000 0.0 0.0

Pile Capacity x-coord y-coord C . x- C . y- xn yn xn² yn² xn.yn Pn


No. Ratio, Cn (m) (m) (m) (m) (kN)

P1 1.00 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.000 0.000 0.000 0.00

0 1.00 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.000 0.000 0.000 0.00
np sum(C) x- y- sum(C . x-) sum(C . y-) sum(xn) sum(yn) sum(xn² ) sum(yn² ) sum(xn.yn) N