MECHANICAL COUPLER VS.

CONVENTIONAL LAP SPLICE


34 TOP OF SIGNAGE 34 TOP OF SIGNAGE
EL. +136.10 M EL. +136.10 M

3500

3500
33 ROOF APEX 33 ROOF APEX
EL. +132.60 M EL. +132.60 M
8500

8500
MECHANICAL COUPLER LAP SPLICE LAP SPLICE MECHANICAL COUPLER

32 ROOF DECK 32 ROOF DECK


EL. +124.10 M EL. +124.10 M
C-2
5500

5500
o. tie = 2.42m + .26 = 2.68

(36)8-Ø25 x 8050mm

(56)8-Ø25 x 8050mm
700X700
i. tie = 1.909v + 1.909h = 3.82
32-Ø25

(18)8-Ø25 x 9550mm

(54)8-Ø25 x 9550mm
total = 6.5m
fc = 7000psi

(34)16-Ø25 x 11876mm
(17)16-Ø25 x 12480mm
31 31ST FLOOR 31 31ST FLOOR
EL. +118.60 M EL. +118.60 M
4000

4000
total length of additional 12mm ties due to lap splice = 6.5m x 2layers = 13m
total weight = 13m x 0.89kg/m = 11.57kg

30 30TH FLOOR 30 30TH FLOOR


EL. +114.60 M EL. +114.60 M

(35)8-Ø25 x 8900mm
4000

4000
(53)8-Ø25 x 11000mm
(17)8-Ø25 x 8900mm

(55)8-Ø25 x 12500mm
29 29TH FLOOR 29 29TH FLOOR
EL. +110.60 M EL. +110.60 M
(16)16-Ø25 x 7500mm

(33)16-Ø25 x 9000mm

C-2
4000

4000
o. tie = 2.42m + .26 = 2.68 total length of additional 12mm ties due to lap splice = 6.5m x 2layers = 13m
700X700
i. tie = 1.909v + 1.909h = 3.82 total weight = 13m x 0.89kg/m = 11.57kg
32-Ø25
total = 6.5m
fc = 7000psi
28 28TH FLOOR 28 28TH FLOOR
EL. +106.60 M EL. +106.60 M

(34)8-Ø25 x 8900mm
4000

4000
(16)8-Ø25 x 8900mm
27 27TH FLOOR 27 27TH FLOOR
EL. +102.60 M EL. +102.60 M
(15)8-Ø25 x 9000mm

(32)8-Ø25 x 7500mm
4000

4000
total length of additional 12mm ties due to lap splice = 6.97m x 3layers = 20.91m
total weight = 20.91m x 0.89kg/m = 18.61kg

26 26TH FLOOR 26 26TH FLOOR


EL. +98.60 M EL. +98.60 M

(33)8-Ø25 x 8900mm
C-2
4000

4000
o. tie = 2.62m + .26 = 2.88

(15)8-Ø25 x 8900mm
700X800
i. tie = 2.109v + 1.976h = 4.09
16-Ø25
total=6.97m
fc = 7000psi
25 25TH FLOOR 25 25TH FLOOR
EL. +94.60 M EL. +94.60 M
(31)8-Ø25 x 7500mm
(14)8-Ø25 x 7500mm
4000

4000
total length of additional 12mm ties due to lap splice = 6.97m x 3layers = 20.91m
total weight = 20.91m x 0.89kg/m = 18.61kg

24 24TH FLOOR 24 24TH FLOOR


EL. +90.60 M EL. +90.60 M

(32)8-Ø25 x 8900mm
4000

4000
(14)8-Ø25 x 8900mm

23 23RD FLOOR 23 23RD FLOOR


EL. +86.60 M EL. +86.60 M
(30)8-Ø25 x 8700mm

C-2
4000

4000
(13)8-Ø25 x 9000mm

o. tie = 2.62m + .26 = 2.88 total length of additional 12mm ties due to lap splice = 6.97m x 3layers = 20.91m
700X800
i. tie = 2.109v + 1.976h = 4.09 total weight = 20.91m x 0.89kg/m = 18.61kg
16-Ø25
total=6.97m
fc = 7000psi
22 22ND FLOOR 22 22ND FLOOR
EL. +82.60 M EL. +82.60 M
(31)8-Ø25 x 10400mm
5500

5500
(13)8-Ø25 x 10400mm
(29)8-Ø25 x 4800mm
(12)8-Ø25 x 4500mm

21 21ST FLOOR 21 21ST FLOOR


EL. +77.10 M EL. +77.10 M
C-2
4000

4000
o. tie = 2.82m + .26 = 3.08 total length of additional 12mm ties due to lap splice = 8.16m x 3layers = 24.48m
700X900
i. tie = 2.31v + 1.915h + .85hL= 5.08 total weight = 24.48m x 0.89kg/m = 21.79kg
16-Ø25
total = 8.16m
fc = 7000psi
20 20TH FLOOR 20 20TH FLOOR
EL. +73.10 M EL. +73.10 M
(30)10-Ø25 x 8900mm
(11)10-Ø25 x 7500mm

(28)10-Ø25 x 9000mm
4000

4000
(12)10-Ø25 x 8900mm

19 19TH FLOOR 19 19TH FLOOR


(52)8-Ø25 x 10930mm

EL. +69.10 M EL. +69.10 M


4000

4000
(50)8-Ø25

total length of additional 12mm ties due to lap splice = 8.16m x 3layers = 24.48m
total weight = 24.48m x 0.89kg/m = 21.79kg

18 18TH FLOOR 18 18TH FLOOR


EL. +65.10 M EL. +65.10 M
(29)10-Ø28 x 8860mm

C-2
(11)10-Ø28 x 8880mm
4000

4000
700X900 o. tie = 2.82m + .26 = 3.08 total length of additional 12mm ties due to lap splice = 8.16m x 3layers = 24.48m
28-Ø25 i. tie = 2.31v + 1.915h + .85hL= 5.08 total weight = 24.48m x 0.89kg/m = 21.79kg
(10)10-Ø28 x 12000mm

fc = 7000psi total = 8.16m


17 17TH FLOOR 17 17TH FLOOR
(27)10-Ø28 x 11700mm

EL. +61.10 M EL. +61.10 M


(51)12-Ø28 x 9000mm
4000

4000
total length of additional 12mm ties due to lap splice = 8.693m x 2layers = 17.386m
total weight = 17.386m x 0.89kg/m = 15.474kg

16 16TH FLOOR 16 16TH FLOOR


(49)12-Ø28

EL. +57.10 M EL. +57.10 M


(28)10-Ø28 x 8920mm

C-2
4000

4000
o. tie = 3.10m + .26= 3.36
(10)10-Ø28 x 8920mm

700X1000 total length of additional 12mm ties due to lap splice = 8.693m x 3layers = 26.079m
32-Ø28 i. tie = 2.515v + 1.97h + .848hL =5.34 total weight = 26.079m x 0.89kg/m = 23.21kg
fc = 7000psi total = 8.693m
15 15TH FLOOR 15 15TH FLOOR
EL. +53.10 M EL. +53.10 M
(50)12-Ø28 x 9000mm
(26)10-Ø28 x 7500mm
(9)10-Ø28 x 9000mm
4000

4000
total length of additional 12mm ties due to lap splice = 9.66m x 2layers = 19.32m
total weight = 19.32m x 0.89kg/m = 17.20kg

14 14TH FLOOR 14 14TH FLOOR


EL. +49.10 M EL. +49.10 M
(27)10-Ø28 x 8960mm
4000

4000
total length of additional 12mm ties due to lap splice = 9.66m x 3layers = 28.98m
(9)10-Ø28 x 8960mm
(48)12-Ø28

total weight = 28.98m x 0.89kg/m = 25.7922kg

12 12TH FLOOR 12 12TH FLOOR


EL. +45.10 M EL. +45.10 M
(25)10-Ø28 x 9000mm
(8)10-Ø28 x 7500mm
4000

4000
total length of additional 12mm ties due to lap splice = 9.66m x 2layers = 19.32m
(49)12-Ø28 x 12000mm

total weight = 19.32m x 0.89kg/m = 17.20kg

11 11TH FLOOR 11 11TH FLOOR


EL. +41.10 M EL. +41.10 M
(26)10-Ø28 x 8960mm

C-2
(47)12-Ø28
4000

4000
700X1000 o. tie = 3.10m + .26 = 3.36
(8)10-Ø28 x 8960mm

32-Ø28 i. tie = 2.515v + 1.884h +1.884h = 6.3


fc = 8500psi total = 9.66m
10 10TH FLOOR 10 10TH FLOOR
EL. +37.10 M EL. +37.10 M
4000

4000
(7)10-Ø28 x 9000mm

total length of additional 12mm ties due to lap splice = 11.227m x 1layer = 11.227m
(24)10-Ø28 x 9000mm

total weight = 11.227m x 0.89kg/m = 10kg

09 9TH FLOOR 09 9TH FLOOR


(25)10-Ø28 x 7200mm

EL. +33.10 M EL. +33.10 M


(7)10-Ø28 x 7620mm

C-2
7600

7600
700X1200 o. tie = 3.42m + .26 = 3.68 total length of additional 12mm ties due to lap splice = 11.227m x 7layers = 78.589m
20-Ø28 i. tie = 2.913v + 1.893h + 1.893h + .848hL = 7.547m total weight = 78.589m x 0.89kg/m = 69.944kg
fc = 8500psi total = 11.227m
(6)10-Ø28 x 9000mm

08 8TH FLOOR - PODIUM 8 08 8TH FLOOR - PODIUM 8


(24)10-Ø28 x 10500mm
(23)10-Ø28 x 9000mm

EL. +25.50 M EL. +25.50 M


3200

3200

07 7TH FLOOR - PODIUM 7 07 7TH FLOOR - PODIUM 7


(6)10-Ø28 x 11760mm

EL. +22.30 M EL. +22.30 M


3200

3200

06 6TH FLOOR - PODIUM 6 06 6TH FLOOR - PODIUM 6


EL. +19.10 M EL. +19.10 M
C-2
3200

3200

o. tie = 3.42m + .26 = 3.68


700X1200
i. tie = 2.913v + 1.893h + 1.893h + .848hL = 7.547
54-Ø28
(5)10-Ø28 x 10204mm

(22)10-Ø28 x 9000mm

total = 11.227m
05 5TH FLOOR - PODIUM 5 fc = 8500psi 05 5TH FLOOR - PODIUM 5
(23)10-Ø32 x 11070mm

EL. +15.90 M EL. +15.90 M


(40)15-Ø28 x 5296mm
(37)13-Ø28 x 5900mm

(42)13-Ø28 x 6890mm
3200

3200

04 4TH FLOOR - PODIUM 4 04 4TH FLOOR - PODIUM 4


(39)13-Ø32 x 10085mm
(5)10-Ø32 x 11065mm
(44)8-Ø32 x 9380mm

EL. +12.70 M EL. +12.70 M


(46)8-Ø32 x 13048mm
3200

3200

03 3RD FLOOR - PODIUM 3 03 3RD FLOOR - PODIUM 3


EL. +9.50 M EL. +9.50 M
(36)13-Ø32 x 7500mm

(21)10-Ø32 x 7500mm

(39)15-Ø32 x 7500mm

C-2
3200

3200

o. tie = 3.62m + .26 = 3.88


(4)10-Ø32 x 7500mm

700X1300
i. tie = 3.12v + 1.877h + 1.877h + 1.877h = 8.751
(41)15-Ø32 x 8833mm
(22)10-Ø32 x 8833mm

56-Ø32
total = 12.631m
02 2ND FLOOR - PODIUM 2 fc = 8500psi 02 2ND FLOOR - PODIUM 2 Type L
EL. +6.30 M EL. +6.30 M
(48)16-Ø32 x 9978mm
(38)13-Ø32 x 8813mm
5050

5050
(4)10-Ø32 x 8813mm
(43)8-Ø32 x 9000mm

total length of additional 12mm ties due to lap splice = 15.196m x 3layers = 45.588m
(46)16-Ø32 x 8780mm

total weight = 45.588m x 0.89kg/m = 40.57332kg


(45)8-Ø32 x 7500mm

01 GROUND FLOOR 01 GROUND FLOOR


EL. +1.25 M EL. +1.25 M
(20)10-Ø32 x 9000mm
(3)10-Ø32 x 9000mm

(38)15-Ø32 x 12514mm

(40)15-Ø32 x 11688mm
4750

4750

00 STREET LEVEL 00 STREET LEVEL


(21)10-Ø32 x 9938mm

total length of additional 12mm ties due to lap splice = 15.196m x 1layer = 15.196m
(35)13-Ø32 x 11910mm

total weight = 15.196m x 0.89kg/m = 13.5244kg


EL. +0.00 M EL. +0.00 M
00 BASEMENT 1 00 BASEMENT 1
EL. -3.50 M EL. -3.50 M
(45)16-Ø32 x 7010mm

(47)16-Ø32 x 6863mm
(37)13-Ø32 x 8513mm
(3)10-Ø32 x 9563mm

C-2
3500

3500

o. tie = 4.016m + .26 = 4.276


700X1500
i. tie = 3.52v + 1.85h + 1.85h + 1.85h + 1.85h = 10.92
72-Ø32
(42)8-Ø32 x 10500mm

total = 15.196m
(44)8-Ø32 x 11403mm

00 BASEMENT 2 fc = 8500psi
00 BASEMENT 2 Type F

EL. -7.00 M EL. -7.00 M


3500

3500
(19)10-Ø32 x 10500mm

(20)10-Ø32 x 10500mm

00 BASEMENT 3 00 BASEMENT 3
(2)10-Ø32 x 10500mm

EL. -10.50 M EL. -10.50 M


3500

3500
(2)10-Ø32 x 9350mm

00 BASEMENT 4 00 BASEMENT 4
EL. -14.00 M EL. -14.00 M
3500

3500

00 BASEMENT 5 00 BASEMENT 5
EL. -17.50 M EL. -17.50 M
(18)10-Ø32 x 8504mm

(41)8-Ø32 x 12000mm

(19)10-Ø32 x 10260mm

(43)8-Ø32 x 12000mm
(1) 10-Ø32 x 7900mm

(1)10-Ø32 x 7900mm

C-2
4200

4200

700X1500
28-Ø32
fc=8500psi type b
00 UNDERGROUND 00 UNDERGROUND
EL. -21.60 M EL. -21.60 M

PROJECT: NX TOWER 1 LEGEND:


298 Layers of Ties
Conventional Lap Splice
253 Layers of Ties
Mechanical Coupler

C2 GRID N/9 15 M 13.5 M 12 M 10.5 M 9M 7.5 M 6M

You might also like