You are on page 1of 1
teefren votes oe Plot No. 350, Shrijee Puram Colony, Sironj Road, Lateri (M.P.). CONTACT: +918839518806, E-MAIL: reofficelateri@gmail.com, WEB: www.globalinfrasolutions.org DHRUV/AE/MAK-SIR/RE/LATERI/2018-19/001 Date: 18/04/2019 To, Project Manager, Bansal Construction Works Pvt, Ltd Site Office: Muraria Plant, bansalmaksudangarh@qmail.com Subject: - Rehabilitation & up-gradation of two lane flexible pavement to Rehabilitation & up gradation of intermediate lane flexible pavement to 2 lane with paved shoulders rigid pavement of Maksudangarh - Sironj road from km 42+510 to 92+640 & white topping (inside Sironj city around which bypass has been proposed in length of 6.16km) section of newly declared NH-752B in the state of Madhya Pradesh on EPC MODE. Regarding: Observation during site inspection. Dear Sir, Following observation were taken in my inspections please submit compliance report. 1. DLC/PQC/Structure curing arrangements found insufficient please increase more water tanker and apply curing compound at PQC Layer. 2. Safety arrangements are insufficient as per MORTH/IRC specification, please install more caution board, reflective sign board, safety ribbon, traffic cone at all diversion and barricading with sand bags at the outer edge of the completed GSB/DLC etc. (including the use of radium) for ensuring safety, 3. Traific movement should be smooth on all parts of construction highway site as per clause 112 of MORTH Please provide black top diversions mentioned in MORTH. 4, GSB top layer modified TCS is awaited from your side otherwise laying of GSB top layer should be done in full width of 225mm thickness. '5f Submit steel manufacturers certificate and third party test to be conduct in presence of AE representative as per required frequency. You have not conducted any test of steel with SQC. 5/ DLC Cube casting hammer still not available in laboratory, please arrange immediately so that cube testing for DLC might be done accurately. \}/ Milestone ~ 1 not achieved by you in prescribed time limit, progress to be speedup with modified work program please submit revised work program. So that milestone —| &ill can be achieved in time. 8 Please submit source of fly-ash with documentary proof of invoices. Sy Prepare fresh drawing for Bharat/Oman refinery pipe line protection work as per guideline given in their letter to EE PWO NH Bhopal on deted 09/04/2019 CORPORATE OFFIC [BRANCH OFFICE hwy Consultancy Services Put, Ltd Global Ina Solutions Dhruv Consultants JV Krishna Techno with Global nf #50", 5 th Flor, Pot No. 67, Pyjt Plaza, Sectr-11, Palm Beach 2, -8/11A, SukhsegarApartmen| Global Tower Trlanga, Bhopel ~ 482039 Road, CBD Belapur, Navi Mumbai - 400614

You might also like