teefren votes
oe
Plot No. 350, Shrijee Puram Colony, Sironj Road, Lateri (M.P.).
CONTACT: +918839518806, E-MAIL: reofficelateri@gmail.com,
WEB: www.globalinfrasolutions.org
DHRUV/AE/MAK-SIR/RE/LATERI/2018-19/001 Date: 18/04/2019
To,
Project Manager,
Bansal Construction Works Pvt, Ltd
Site Office: Muraria Plant,
bansalmaksudangarh@qmail.com
Subject: - Rehabilitation & up-gradation of two lane flexible pavement to Rehabilitation
& up gradation of intermediate lane flexible pavement to 2 lane with paved shoulders
rigid pavement of Maksudangarh - Sironj road from km 42+510 to 92+640 & white
topping (inside Sironj city around which bypass has been proposed in length of 6.16km)
section of newly declared NH-752B in the state of Madhya Pradesh on EPC MODE.
Regarding: Observation during site inspection.
Dear Sir,
Following observation were taken in my inspections please submit compliance report.
1. DLC/PQC/Structure curing arrangements found insufficient please increase more water tanker
and apply curing compound at PQC Layer.
2. Safety arrangements are insufficient as per MORTH/IRC specification, please install more
caution board, reflective sign board, safety ribbon, traffic cone at all diversion and barricading
with sand bags at the outer edge of the completed GSB/DLC etc. (including the use of radium)
for ensuring safety,
3. Traific movement should be smooth on all parts of construction highway site as per clause
112 of MORTH Please provide black top diversions mentioned in MORTH.
4, GSB top layer modified TCS is awaited from your side otherwise laying of GSB top layer should
be done in full width of 225mm thickness.
'5f Submit steel manufacturers certificate and third party test to be conduct in presence of AE
representative as per required frequency. You have not conducted any test of steel with SQC.
5/ DLC Cube casting hammer still not available in laboratory, please arrange immediately so that
cube testing for DLC might be done accurately.
\}/ Milestone ~ 1 not achieved by you in prescribed time limit, progress to be speedup with
modified work program please submit revised work program. So that milestone —| &ill can be
achieved in time.
8 Please submit source of fly-ash with documentary proof of invoices.
Sy Prepare fresh drawing for Bharat/Oman refinery pipe line protection work as per guideline
given in their letter to EE PWO NH Bhopal on deted 09/04/2019
CORPORATE OFFIC [BRANCH OFFICE
hwy Consultancy Services Put, Ltd Global Ina Solutions Dhruv Consultants JV Krishna Techno with Global nf
#50", 5 th Flor, Pot No. 67, Pyjt Plaza, Sectr-11, Palm Beach 2, -8/11A, SukhsegarApartmen| Global Tower Trlanga, Bhopel ~ 482039
Road, CBD Belapur, Navi Mumbai - 400614