coreg sarc
aa}
PT PGAS SOLUTION Manufaktur Repair
FORMULIR HASIL PENGULIA MAAN 01
~—pgn FACTORY ACCEPTANCE TEST (FAT] RESULT LST
‘na Ke elt a6
Werk ree repeciot re Bel
Votecal ara insole Seid .
ara De TURE Ma owner
1 Zarar TR Mer
‘nspeitor eee ita vana Dinspats aces
Inspedors gp tnspedied Patios E
‘A Informasl umum pellsanson penguien (General
Information text execution)
‘Nama Watera/Perltan Wane
of Material Equipment)
lus #20 6.65 calon Planggan Mutt Saka
act
TN. Sei/ Type (No. series / Type)
lus: a0ce5 PGAsora
Nama Pabrikan (Manufoctrer Name)
JPTPGAS SOLUTION WANUFAKTOR & REPAIR
Referens Spestitas (References Specfeatons)
:|pes.cre-mo.cs-002 den os-cTEPS-80-007
No. ProsedurPengulan (Testing Procedure No.)
Jpoas-ca-asce-acr.PR-cod
ens Penguin Testa Type)
[Faction andesite
1. Pavamater Penerinaan (Aecepiance Gitera)
Ursin (Desorption)
Nii (Value satuan fit)
fs _ | Reaulator a
[2 _ | StumShat valve aa/aa
[a _ [Meter Ey
la | vane 5
[>_[Prv a2/aa
(CHa Pengulian (Test Result)
Satuan (nt)
‘Dierina Tak era
(Accept/Rejec)
Keterangan Remark)
Is [Pew a2yaa er
D.Keimpulen (Conduron)
misas/orraer””
Trapelor Pak Rate
(hi arty Ineoectr”
Inspektor PN JPN inspector),
Note
kad (fan)0-003/0.52/F03
Revisi: 0
ge
PT PERUSAHAAN GAS NEGARA Tbk
PT PGAS SOLUTION
Manufaktur & Repair
BERITA ACARA PENGUJIAN
DAN PENERIMAAN DI PABRIK
(FACTORY ACCEPTANCE
TES
TAHUN 2019
psn
PT PGAS SOLUTION
No.
Pada hari ini Senin tanggal Empat bulan Februari tahun Dua Ribu Sembilan Belas, telah
selesai dilaksanakan Pengujian dan Penerimaan di Pabrik / FAT oleh Fungsi
Pemeriksa/Penguji untuk material peralatan:
(On this day, Monday date Four month February year Two Thousand Nineteen have been
conducted Factory Acceptance Test / FAT by Examiner Function for materiaV/equioment:)
RONG
‘Slum shut valve
Regulator,
Meter.
Valve
PRV
Pengujian dan Penerimaan di Pabrik / FAT tersebut dilaksanakan pada tanggal Senin 4
Februari 2019 yang berlokasi di Manufaktur & Repair, Jin.Swadaya PLN no.5 Klender
dengan hasil sebagai berikut:
(Factory Acceptance Test/ FAT has been conducted Monday 4 February , 2019 which is
located in Manufacturing & Repair, Jin.Swadaya PLN no.6 Klender with the following
results:
Nilai
Nama Material’ | 6 sens 7 : pias DiterimarTidak} Keterangan /
Wo. |, Pemaaian | No_Seti pe | wenis | Pena | coun | Diora | \Roterona
(Name of Material/ Type) (Test Type) | (Test (Unity (Accept | (Description /
Equipment) Result Reject) Reference)
Value)
hi} Slum shut valve | 14/25.596-8 Fuction [4.1/1.1 Bar Acc
2. Regulator 415/34.153-4 Fuction 4/1 Bar Acc
3._| Meter 150570 Fuction 20 Bar Acc
4._| Valve VT 14048-15 cd = - =
5. | PRV 15/28251-10 Fuction | 4.2/4.2 Bar Acc.
jo.
Catatan Punch List ( Punch |
og)
Punch list
els|alz
Demikian Berita Acara ini dibuat untuk dapat digunakan sebagaimana mestinya.
(This minute of inspection are made to be used accordingly)
Performed By
PT PGAS Solution Manufacturer & Repair
Witness By
PT. PGAS Solution Project Internal Regional
PT.PGN (PMO)
¢o-ccanszro:
ant
é 7 PGAS SOLUTION Nanay Ropar
"i DAFTAR ane psn
gn era
aan = ==
ona ee =
= re
auheca i moe Fag
= Sen | Saesoeee [ae
ina 2 Moers |:2
ia eile Teo
: pester eat
FeTac narta ear
Searecpaaans
ceanegerie
.| Rena |
amare eae
=
qn
cea
Inspaksl dlatukan berdasa instrukstertulls
3a v
Inspections hosed on test struction
Tnstruks tertuleteredia di lokael kerja
ispetor
°? | rorcinsroatonareoriabieaewok = | V
location
Has inspata ai deta dan
aa | ehumentastam 7
Fina resis of specion oe recorded and
documented
7 | etesedurinspet onto Tevel2
Inspestion Procedures forlevel2
42 | setstelltutenbersarinstrtl trae | 7
Inspections based on tat traction
Memerksa barang dotang eau dengan
purchase order, spesias dan/atau
1a | entertains Vv
°" | Inspect incoming materials comply with
purchase oder, specication end or
technic drain.
Mil reports, Inspecion Repos NOE
Reporte dan sertit creview
Kesesuannya
4° amemrhoceramecmamear| Vv
dnd certifies tobe reviewed for
componce.
\aporan-aporan dan sett ateral
mampu tlusur v
"Waterial traceability reports and |
cercieates
Perbedsan dapat iinet pada ctatan
penetimaan v
record
‘Mater dtandai dengan REIECT ou
46 | once v
“Meter marke wit RETF or CE
4“
4s