You are on page 1of 50

07.09.

2018

VALUE OF WORKDONE FOR THE PROPOSED CONSTRUCTION OF RESIDENTIAL BUILDING AT, S.NO.396/4A1A,
401/1A1A, ALVAKKARAIVADI VILLAGE, AMIRTHA GARDEN, KANCHIRANGUDI GROUP, THIRUPPULANI UNION,
RAMANATHAPURAM DISTRICT.

OWNER NAME: Mr.P.PALANI

Sl.
No DESCRIPTION OD WORK Nos L B D QTY RATE PER AMOUNT
.

I. GROUND FLOOR-1133.25 Sq.ft

1) Earth work excavation for foundation


with intial lead and lift in all soils and
subsoils with standard specifications
etc.,

column 20 1.50 1.50 1.50 67.50


Plinth Beam 1 81.30 0.30 0.23 5.61
Deduction columnd portion 20 1.50 0.30 0.23 -2.07

71.04 300.00 Cu.m 21311.91

2) Sand filling for foundation level well


rammed and consolidated with standard
specification etc., complete
column 20 1.50 1.50 0.10 4.50
Plinth Beam 1 81.30 0.30 0.10 2.44
Deduction columnd portion 20 1.50 0.30 0.10 -0.90

6.04 1800.00 Cu.m 10870.20

2a Sand filling for Basement with field sand


Portico 1 4.19 3.81 1.00 15.96
Bed 1 4.11 2.88 1.00 11.84
Toilet 1 2.74 1.21 1.00 3.32
Verandah 1 3.73 1.31 1.00 4.89
Hall 1 8.07 3.81 1.00 30.75
Kitchen/Dining 1 6.32 3.05 1.00 19.28
store 1 1.52 1.70 1.00 2.58
Pooja 1 1.52 1.21 1.00 1.84
90.45 1200 Cu.m 108537.96

3 Plain Cement concrete 1:5:10 mix using


40mm HBG jelly for al foundation and
basement with well rammed and
consolidated with standard specification
etc., complete.

column 20 1.50 1.50 0.10 4.50


Plinth Beam 1 81.30 0.30 0.10 2.44
Deduction columnd portion 20 1.50 0.30 0.10 0.90
07.09.2018

FOR BASEMENT 0.10


Portico 1 4.19 3.81 0.10 1.60
Bed 1 4.11 2.88 0.10 1.18
Toilet 1 2.74 1.21 0.10 0.33
Verandah 1 3.73 1.31 0.10 0.49
Hall 1 8.07 3.81 0.10 3.07
Kitchen/Dining 1 6.32 3.05 0.10 1.93
store 1 1.52 1.70 0.10 0.26
Pooja 1 1.52 1.21 0.10 0.18
16.88 4500.00 Cu.m 75977.24

4 Brick work in cement mortar 1:5 mix


using Ist class chamber burnt bricks for
all basement with standard specification
etc., complete

Basement 1 81.30 0.23 1.00 18.70


Superstructure 1 73.31 0.23 3.05 51.43
Partition 1 8.00 0.12 3.05 2.93
(0.3X0.15/2)
Staircase Steps 1 0.02 1.12 0.03
Deduction of opening
GD Glass Door 1 1.22 0.23 2.10 -0.59
MD Main door 1 1.22 0.23 2.10 -0.59
D Door 4 0.90 0.12 2.10 -0.91
D1 Door 1 0.76 0.12 2.10 -0.19
O Open 1 1.00 0.23 2.10 -0.48
W Window 7 0.90 0.23 1.37 -1.99
V Ventilator 2 0.60 0.23 0.45 -0.12
-4.28
68.21 6500.00 Cu.m 443362.37

5
Reinforced cement concrete 1:2:4 mix
using 20mm HBG jelly for plinth, Lintel,
Beam, loft, Sunshade & roof slab with
standard specification etc., complete

column mat 20 1.50 1.50 0.60 27.00


Pedestal 20 0.68 0.30 4.08
Column 1 20 0.23 0.23 5.05 5.34
Plinth Beam 1 81.30 0.23 0.45 8.41
Basement belt 1 81.30 0.23 0.13 2.43
Lintel 1 81.30 0.23 0.45 8.41
Stair waist Slab 1 5.02 1.00 0.13 0.65
Roof 1 8.53 11.88 0.13 13.17
Deduction staircase 1 1.78 3.81 0.13 -0.88
68.63 8500.00 Cu.m 583371.05
07.09.2018

6 Supplying of Steel for all R.C.C works


using plain twisted rods and binding
wire with standard specifications etc.,
complete
1 68.63 x85/1000 2.55 55000.00 M.T 140499.53

7 Ceiling plastering in cement mortar 1:3


mix using 12mm thick for all R.C.C
works with standard specifications etc.,
complete
Portico 1 4.19 3.81 15.96
Bed 1 4.11 2.88 11.84
Toilet 1 2.74 1.21 3.32
Verandah 1 3.73 1.31 4.89
Hall 1 8.07 3.81 30.75
Kitchen/Dining 1 6.32 3.05 19.28
store 1 1.52 1.70 2.58
Pooja 1 1.52 1.21 1.84
90.45 350.00 Sq.m 31656.91

8 Wall plastering in cement mortar 1:5


mix using 20mm thick for all exposed
brick works with standard specifications
etc., complete

Inner (L+Bx2)x3.05
Portico 1 4.19 3.81 3.05 48.80
Bed 1 4.11 2.88 3.05 42.64
Toilet 1 2.74 1.21 3.05 24.10
Verandah 1 3.73 1.31 3.05 30.74
Hall 1 8.07 3.81 3.05 72.47
Kitchen/Dining 1 6.32 3.05 3.05 57.16
store 1 1.52 1.70 3.05 19.64
Pooja 1 1.52 1.21 3.05 16.65
312.20 300.00 Sq.m 93659.40

9 Provision for Electrification


arrangements with standard
specifications etc., complete l.s 20000.00
Contingencies and other unforceen
10 charges l.s 398.90

1529645.46

II. FIRST FLOOR-1038.50 Sq.ft


1 Brick work in cement mortar 1:5 mix
using Ist class chamber burnt bricks for
all supersture with standard
specification etc., complete
Parapet 1 37.53 0.23 1.00 8.63
Superstructure 1 47.92 0.12 3.05 17.54
07.09.2018

Partion 1 14.02 0.23 3.05 9.84


Deduction of opening
D Door 4 0.90 0.12 2.10 -0.91
D1 Door 3 1.00 0.12 2.10 -0.76
W Window 6 0.90 0.12 1.37 -0.89
V Ventilator 3 0.60 0.12 0.45 -0.10
-2.65
33.36 7000.00 CUM 233502.43
2 Reinforced cement concrete 1:2:4 mix
using 20mm HBG jelly for plinth, Lintel,
Beam, loft, Sunshade & roof slab with
standard specification etc., complete

Column 1 20 0.23 0.30 4.05 5.59


Lintel 1 61.94 0.12 0.23 1.71
Roof Beam 1 61.94 0.23 0.45 6.41
Roof 1 1 4.57 12.80 0.13 7.60
Roof 2 1 3.96 5.48 0.13 2.82
24.13 9000.00 Cum 217214.26

3 Supplying of Steel for all R.C.C works


using plain twisted rods and binding
wire with standard specifications etc.,
complete
1 24.13 x80/1000 0.26 60000.00 MT 15519.90

4 Provision for Electrification


arrangements with standard
specifications etc., complete l.s 10000.00

5 Contingencies and other unforceen


charges 435.7
476672.29

I) GROUND FLOOR 1529645.46

II) FIRST FLOOR 476672.29

2006317.7

Rupees Twenty Two Lacs Eighty Seven Thousand Only


18.12.2018.

THE ESTIMATE FOR THE PROPOSED CONSTRUCTION OF A RESIDENTIAL BUILDING IN PLOT NO.69, WARD ; G,
BLOCK NO.25, T.S.NO.16/2C1A1, G.V.R. NAGAR, BALAN NAGAR, PARAMAKUDI MUNICIPALITY,
RAMANATHAPURAM DISTRICT.

EST. AMOUNT Rs.36.00Lacs


Sl.
No DESCRIPTION OD WORK Nos L B D QTY RATE PER AMOUNT
.

I. GROUND FLOOR-727.00 Sq.ft

1) Earth work excavation for foundation


with intial lead and lift in all soils and
subsoils with standard specifications
etc.,

column 16 1.50 1.50 1.50 54.00


Plinth Beam 1 62.91 0.30 0.23 4.34

58.34 300.00 Cu.m 17502.24

2) Sand filling for foundation level well


rammed and consolidated with standard
specification etc., complete
column 16 1.50 1.50 0.15 5.40
Plinth Beam 1 62.91 0.30 0.15 2.83

8.23 1200.00 Cu.m 9877.14

2a Sand filling for Basement with field sand


Hall 1 3.18 5.03 1.00 16.00
Stair 1 2.55 1.80 1.00 4.59
W.c 1 2.55 1.37 1.00 3.49
Kitchen 1 2.94 2.45 1.00 7.20
Store 1 3.19 2.89 1.00 9.22
Bed 1 2.55 3.45 1.00 8.80
49.30 1200 Cu.m 59158.20

3 Plain Cement concrete 1:5:10 mix using


40mm HBG jelly for al foundation and
basement with well rammed and
consolidated with standard specification
etc., complete.

column 16 1.50 1.50 0.15 5.40


Plinth Beam 1 62.91 0.30 0.15 2.83

Page 5
FOR BASEMENT
Hall 1 3.18 5.03 0.15 2.40
Stair 1 2.55 1.80 0.15 0.69
W.c 1 2.55 1.37 0.15 0.52
Kitchen 1 2.94 2.45 0.15 1.08
Store 1 3.19 2.89 0.15 1.38
Bed 1 2.55 3.45 0.15 1.32
15.63 4500.00 Cu.m 18.12.2018.
70315.76

4 Brick work in cement mortar 1:5 mix


using Ist class chamber burnt bricks for
all basement with standard specification
etc., complete

Basement 1 62.91 0.23 1.00 14.47


Superstructure 1 56.91 0.23 3.05 39.92
Partition 1 6.56 0.12 3.05 2.40
(0.3X0.15/2)
Staircase Steps 1 0.02 1.12 0.03
Deduction of opening
MD Main door 1 1.20 0.23 2.10 -0.58
D Door 3 0.90 0.23 2.10 -1.30
D1 Door 1 0.76 0.12 2.10 -0.19
W Window 11 1.50 0.23 1.37 -5.20
V Ventilator 1 0.60 0.23 0.45 -0.06
-7.34
49.48 6500.00 Cu.m 321628.81

5 Reinforced cement concrete 1:2:4 mix


using 20mm HBG jelly for plinth, Lintel,
Beam, loft, Sunshade & roof slab with
standard specification etc., complete

column mat 16 1.50 1.50 0.10 3.60


Pedestal 16 1.02 0.23 3.76
Column 1 16 0.23 0.23 5.05 4.27
Plinth beam 1 62.91 0.23 0.30 4.34
lintel 1 56.91 0.23 0.23 3.01
Partition 1 6.56 0.12 0.30 0.24
Stair waist Slab 1 5.24 1.22 0.13 0.83
Roof 1 6.43 11.25 0.13 9.40
1 5.33 1.52 0.13 1.05
Deduction staircase 1 2.55 1.83 0.13 -0.61
1 0.46 2.55 0.13 0.15
30.05 8000.00 Cu.m 240427.00

6 Supplying of Steel for all R.C.C works


using plain twisted rods and binding
wire with standard specifications etc.,
complete
1 30.05 x75/1000 2.25 50000.00 M.T 112700.16

7 Supplying and fixing of doors and


windows arrangements including all
other essential furniture fittings with
standard specifications etc., complete

MD Main door 1 1.20 2.10 2.52


D Door 3 0.90 2.10 5.67
D1 Door 1 0.76 2.10 1.60
W Window 11 1.50 1.37 22.61
V Ventilator 1 0.60 0.45 0.27
32.66 4000.00 Sq.m 130644.00

8 Ceiling plastering in cement mortar 1:3


mix using 12mm thick for all R.C.C
works with standard specifications etc.,
complete
Hall 1 3.18 5.03 16.00

Page 6
18.12.2018.

Stair 1 2.55 1.80 4.59


W.c 1 2.55 1.37 3.49
Kitchen 1 2.94 2.45 7.20
Store 1 3.19 2.89 9.22
Bed 1 2.55 3.45 8.80
49.30 350.00 Sq.m 17254.48

9 Wall plastering in cement mortar 1:5


mix using 20mm thick for all exposed
brick works with standard specifications
etc., complete

OUTER
Basement 1 35.44 1.00 35.44
super structure 1 35.44 3.05 108.09

Page 7
18.12.2018.

Parapet 1 35.44 2.23 79.03


Inner (L+Bx2)x3.05
Hall 1 3.18 5.03 3.05 50.08
Stair 1 2.55 1.80 3.05 26.54
W.c 1 2.55 1.37 3.05 23.91
Kitchen 1 2.94 2.45 3.05 32.88
Store 1 3.19 2.89 3.05 37.09
Bed 1 2.55 3.45 3.05 36.60
429.66 300.00 Sq.m 128897.46

10a Floor Finish with Vertified tiles over the


p.c.c.1:4:8 with standard specification
etc., complete

Hall 1 3.18 5.03 16.00


Stair 1 2.55 1.80 4.59
W.c 1 2.55 1.37 3.49
Kitchen 1 2.94 2.45 7.20
Store 1 3.19 2.89 9.22
Bed 1 2.55 3.45 8.80
49.30 1200.00 Sq.m 59158.20

11 Ceiling white washing two coats over all


ceiling plastering area with lime powder
with standard specifications etc.,
complete 49.30 150.00 Sqm 7394.78

12 Outer wall white washing two coats with


super cem with standard specifications
etc., complete 143.53 200.00 Sqm 28706.40

13 Inner wall white washing two coats with


emulsion using over a priming coats
with standard specifications etc.,
complete 207.10 300.00 Sqm 62128.50

14 Provision for wood work painting with


standard specification etc., complete 32.66 400.00 Sqm 13064.40

Page 8
15 Provision for Electrification
arrangements with standard
specifications etc., complete 50.00 1000.00 Points 50000.00

16 Provision Weathering course


arrangements with standard
specification etc., complete 60.00 1000.00 Sqm 60000.00
Contingencies and other unforceen 18.12.2018.
17 charges l.s 1142.48

1390000.00

III EXTRA AMENITIES

1 Provision for water supply arrangements l.s 15000.00

3 Provision for Sanitary arrangement l.s 20000.00

I) GROUND FLOOR TOTAL 1425000.00

Ground Floor Plinth Area 727.50 Sqft.


G.F Cost of Construction per Sqft Rs.1958.76/-

II. FIRST FLOOR-121.25 Sq.ft


1 Brick work in cement mortar 1:5 mix
using Ist class chamber burnt bricks for
all supersture with standard
specification etc., complete
Superstructure 1 13.50 0.23 3.05 9.47
Deduction of opening
D Door 2 0.90 0.23 2.10 -0.87
W Window 2 0.90 0.12 1.37 -0.30
-1.17
8.30 6500.00 CUM 53982.05
2
Reinforced cement concrete 1:2:4 mix
using 20mm HBG jelly for plinth, Lintel,
Beam, loft, Sunshade & roof slab with
standard specification etc., complete
Column 1 4 0.23 0.35 4.05 1.30
Lintel 1 13.50 0.23 0.15 0.47
Roof 1 1 3.01 3.74 0.13 1.46
3.23 8500.00 Cum 27483.15

3 Supplying of Steel for all R.C.C works


using plain twisted rods and binding
wire with standard specifications etc.,
complete
1 3.23 x75/1000 0.24 50500.00 MT 12246.17

4 Supplying and fixing of doors and


windows arrangements including all
other essential furniture fittings with
standard specifications etc., complete

D Door 2 0.90 0.23 2.10 3.78


W Window 2 0.90 0.12 1.37 2.47
6.25 4000.00 Sqm 24984.00
5 Ceiling plastering in cement mortar 1:3
mix using 12mm thick for all R.C.C
works with standard specifications etc.,
complete
Stair 1 3.01 3.74 11.26
Toilet 1 2.55 1.37 3.49
14.75 300.00 Sqm 4425.27
6 Wall plastering in cement mortar 1:5
mix using 20mm thick for all exposed
brick works with standard specifications
etc., complete
OUTER

Page 9
18.12.2018.

super structure 1 13.50 3.05 41.18


Inner (L+Bx2)x3.05
Stair 1 3.01 3.74 3.05 41.18
Toilet 1 2.55 1.37 3.05 23.91
Deduction of wood work -6.25
100.02 300.00 Sqm 30004.80
7 Floor Finish with Vertified tiles over the
p.c.c.1:4:8 with standard specification
etc., complete

Toilet 1 2.55 1.37 3.49


3.49 1200.00 Sqm 4192.20
8 Ceiling white washing two coats over all
ceiling plastering area with lime powder
with standard specifications etc.,
complete 14.75 150.00 Sqm 2212.64

Page 10
18.12.2018.

9 Outer wall white washing two coats with


super cem with standard specifications
etc., complete 41.18 200.00 Sqm 8235.00

10 Inner wall white washing two coats with


emulsion using over a priming coats
with standard specifications etc.,
complete 58.84 300.00 Sqm 17652.30

11 Provision for wood work painting with


standard specification etc., complete 6.25 400.00 Sqm 2498.40

12 Provision for Electrification


arrangements with standard
specifications etc., complete 5.00 1000.00 Points 5000.00

13 Provision Weathering course


arrangements with standard
specification etc., complete 6.00 1000.00 Sqm 6000.00

14 Contingencies and other unforceen


charges 1084.03
200000.00

II)FIRST FLOOR TOTAL 200000.00


ABSTRACT:

I) GROUND FLOOR 1425000.00

II) FIRST FLOOR 200000.00

1625000.0

First Floor Plinth Area 710.00 Sqft.


F.F Cost of Construction per Sqft Rs.1649.48/-

(RUPEES SIXTEEN LAKHS AND TWENTY FIVE THOUSANDS ONLY)

Page 11
18.12.2018.

THE VALUE OF WORK DONE FOR THE PROPOSED CONSTRUCTION OF A RESIDENTIAL BUILDING IN
R.S.NO:91/21, PATTA NO.1796, DHARGA STREET, PERIYAPATTINAM VILLAGE & PANCHAYAT, THIRUPPULANI
UNION, RAMANATHAPURAM DISTRICT.

OWNER NAME:Mrs. SHAHITHA MAHINOON BEGAM


EST. AMOUNT Rs.36.20Lacs
Sl.
DESCRIPTION OD WORK Nos L B D QTY RATE PER AMOUNT
No

1) Earth work excavation for foundation


with intial lead and lift in all soils and
subsoils with standard specifications
etc.,

column 18 1.50 1.50 1.50 60.75


Plinth Beam 1 69.83 0.30 0.23 4.82

65.57 300.00 Cu.m 19670.48

2) Sand filling for foundation level well


rammed and consolidated with standard
specification etc., complete
column 18 1.50 1.50 0.15 6.08
Plinth Beam 1 69.83 0.30 0.15 3.14

9.22 1200.00 Cu.m 11060.82

2a Sand filling for Basement with field sand


Verandah 1 4.88 1.50 1.00 7.32
Hall 1 4.88 4.88 1.00 23.81
Stair 1 3.14 3.34 1.00 10.49
Bed Room 1 4.88 4.26 1.00 20.79
Bed Room 1 3.27 4.88 1.00 15.96
Toilet 1 1.50 2.10 1.00 3.15
Store 1 1.50 2.10 1.00 3.15
Kitchen 1 3.05 4.88 1.00 14.88
Dining 1 3.05 3.35 1.00 10.22
109.77 1200 Cu.m 131723.88

3 Plain Cement concrete 1:5:10 mix using


40mm HBG jelly for al foundation and
basement with well rammed and
consolidated with standard specification
etc., complete.

column 18 1.50 1.50 0.15 6.08


Plinth Beam 1 69.83 0.30 0.15 3.14

Page 12
18.12.2018.

FOR BASEMENT
Verandah 1 4.88 1.50 0.15 1.10
Hall 1 4.88 4.88 0.15 3.57
Stair 1 3.14 3.34 0.15 1.57
Bed Room 1 4.88 4.26 0.15 3.12
Bed Room 1 3.27 4.88 0.15 2.39
Toilet 1 1.50 2.10 0.15 0.47
Store 1 1.50 2.10 0.15 0.47
Kitchen 1 3.05 4.88 0.15 2.23
Dining 1 3.05 3.35 0.15 1.53
25.68 4500.00 Cu.m 115572.76

4 Brick work in cement mortar 1:5 mix


using Ist class chamber burnt bricks for
all basement with standard specification
etc., complete

Basement 1 69.83 0.23 1.00 16.06


Superstructure 1 69.83 0.23 3.05 48.99
Partition 1 7.88 0.12 3.05 2.88
(0.3X0.15/2)
Staircase Steps 1 0.02 1.12 0.03
Deduction of opening
MD Main door 1 1.20 0.23 2.10 -0.58
D Door 4 0.90 0.23 2.10 -1.74
D1 Door 3 0.76 0.12 2.10 -0.57
W Window 9 1.50 0.23 1.37 -4.25
V Ventilator 2 0.60 0.23 0.45 -0.12
-7.27
60.68 6500.00 Cu.m 394451.95

5 Reinforced cement concrete 1:2:4 mix


using 20mm HBG jelly for plinth, Lintel,
Beam, loft, Sunshade & roof slab with
standard specification etc., complete

column mat 18 1.50 1.50 0.15 6.08


Pedestal 18 1.02 0.30 5.51
Column 1 18 0.23 0.35 5.05 7.32
Plinth beam 1 69.83 0.23 0.30 4.82
lintel 1 69.83 0.23 0.23 3.69
Partition 1 7.88 0.12 0.30 0.28
Stair waist Slab 1 5.24 1.22 0.13 0.83
Roof Beam 1 69.83 0.23 0.23 3.69
Roof 1 8.61 8.92 0.13 9.98
1 5.33 1.52 0.13 1.05
1 5.11 3.81 0.13 2.53
1 1.81 5.22 0.13 1.22
Deduction staircase 1 3.14 3.34 0.13 -1.36
45.66 8000.00 Cu.m 365257.14

6 Supplying of Steel for all R.C.C works


using plain twisted rods and binding
wire with standard specifications etc.,
complete
1 45.66 x75/1000 6.85 60000.00 M.T 410914.28

FIRST FLOOR

Page 13
18.12.2018.

7 Brick work in cement mortar 1:5 mix


using Ist class chamber burnt bricks for
all supersture with standard
specification etc., complete
Parapet 1 31.54 0.23 1.00 7.25 7.25
Superstructure 1 36.42 0.23 3.05 25.55
Deduction of opening
D Door 2 0.90 0.23 2.10 -0.87
D1 Door 2 1.00 0.12 2.10 -0.50
W Window 5 0.90 0.12 1.37 -0.74
V Ventilator 1 0.60 0.12 0.45 -0.03
-2.15
30.66 6500.00 CUM 199272.00
8

Reinforced cement concrete 1:2:4 mix


using 20mm HBG jelly for plinth, Lintel,
Beam, loft, Sunshade & roof slab with
standard specification etc., complete
Column 1 9 0.23 0.35 4.05 2.93 4.05
Lintel 1 36.42 0.23 0.23 1.93
Roof Beam 1 36.42 0.23 0.30 2.51
Roof 1 1 5.33 12.80 0.13 8.87
1 5.34 1.76 0.13 1.22
1 3.12 3.38 0.13 1.37
18.84 8500.00 Cum 160103.14

9 Supplying of Steel for all R.C.C works


using plain twisted rods and binding
wire with standard specifications etc.,
complete
1 18.84 x75/1000 1.41 60500.00 MT 85466.82

10
Contingencies and other unforceen
charges 6495.45

1900000.00
(RUPEES NINETEEN LAKHS ONLY)

In accordance with instructions received from the applicant, I have personally inspected
Proposed Construction of a Residential Building in R.S.No.91/21, Patta No.1796, Dharga Street,
Periyapattinam Village & Panchayat, Thiruppullani Union, Ramanathapuram District.

The construction has reached upto First Floor Roof Level and the further works are in progress.

The value of workdone in the above mentioned site owned Mrs. SHAHITHA MAHINOON
BEGAM,is not less than Rs.19,00,000/-- (Rupees Nineteen Lacs only)

Page 14
07.01.2019.

VALUE OF WORKDONE FOR THE PROPOSED CONSTRUCTION OF A RESIDENTIAL BUILDING IN PLOT NO.69,
WARD ; G, BLOCK NO.25, T.S.NO.16/2C1A1, G.V.R. NAGAR, BALAN NAGAR, PARAMAKUDI MUNICIPALITY,
RAMANATHAPURAM DISTRICT.

OWNER NAME: Mr. R. MURUGANANATHAM

Sl.
No DESCRIPTION OD WORK Nos L B D QTY RATE PER
.

I. GROUND FLOOR-727.00 Sq.ft

1) Earth work excavation for foundation


with intial lead and lift in all soils and
subsoils with standard specifications
etc.,

column 16 1.50 1.50 1.50 54.00


Plinth Beam 1 62.91 0.30 0.23 4.34

58.34 300.00 Cu.m

2) Sand filling for foundation level well


rammed and consolidated with standard
specification etc., complete
column 16 1.50 1.50 0.15 5.40
Plinth Beam 1 62.91 0.30 0.15 2.83

8.23 1200.00 Cu.m

3 Brick work in cement mortar 1:5 mix


using Ist class chamber burnt bricks for
all basement with standard specification
etc., complete

Basement 1 62.91 0.23 1.00 14.47


14.47 6500.00 Cu.m

4 Reinforced cement concrete 1:2:4 mix


using 20mm HBG jelly for plinth, Lintel,
Beam, loft, Sunshade & roof slab with
standard specification etc., complete

column mat 16 1.50 1.50 0.10 3.60


Pedestal 16 1.02 0.23 3.76
Column 1 16 0.23 0.23 5.05 4.27
Plinth beam 1 62.91 0.23 0.30 4.34
15.97 8000.00 Cu.m

5 Supplying of Steel for all R.C.C works


using plain twisted rods and binding
wire with standard specifications etc.,
complete
1 15.97 x75/1000 2.25 50000.00 M.T
07.01.2019.

6 Wall plastering in cement mortar 1:5


mix using 20mm thick for all exposed
brick works with standard specifications
etc., complete

OUTER
Basement 1 35.44 1.00 35.44
35.44 300.00 Sq.m

Provision for 4" Bore Well 300' Depth


7 including Plumping arrangments etc
complete, l.s

8 Contingencies and other unforceen


charges

TOTAL

In accordance with instructions received from the applicant, I have personally inspected
Proposed Construction of a Residential Building in Plot No.69, Ward ; G, Block No.25,
T.S.No.16/2c1a1, G.V.R. Nagar, Balan Nagar, Paramakudi Municipality, Ramanathapuram District..

The construction has reached upto First Floor Roof Level and the further works are in
progress.

The value of workdone in the above mentioned site owned


Mr.R.MURUGANANATHAMBEGAM,is not less than Rs.4,75,000/-- (Rupees Four Lacs Seventy
Five Thousand only)
07.01.2019.
07.01.2019.

UILDING IN PLOT NO.69,


AKUDI MUNICIPALITY,

AMOUNT

17502.24

9877.14

94050.45

127781.48

112700.16
07.01.2019.

10632.00

100000.00

2456.54

475,000.00

onally inspected
k No.25,
nathapuram District..

er works are in

Four Lacs Seventy


07.01.2019.
07.01.2019.

DE.COLUMN
PLINTH BEAM 16.46
16.46

3.66
3.05

7.92
7.92
7.92
17502.237
63.39

Pedestal size ( area -A2)


Footing 0.56 0.56
Size( are
aCoping
- A1) 1.50 1.50
height h 0.90
For single column Coping ={A1 +A2 +Sqrt(A12 *A22)}*h/3
2 2
1.02

75.00 1000
07.01.2019.
07.01.2019.
12.03.2019.

THE ESTIMATE FOR THE PROPOSED CONSTRUCTION OF TOILET BLOCK FOR MOHAMED SATHAK
POLYTECHINIC COLLEGE AT KEELAKARAI

EST. AMOUNT Rs.56.80Lacs


Sl.
No DESCRIPTION OD WORK Nos L B D QTY RATE PER
.

I. GROUND FLOOR-1650.00 Sq.ft

1) Earth work excavation for foundation


with intial lead and lift in all soils and
subsoils with standard specifications
etc.,

column 16 1.50 1.50 1.50 54.00


Plinth Beam 1 84.40 0.30 0.23 5.82

59.82 300.00 Cu.m

2) Sand filling for foundation level well


rammed and consolidated with standard
specification etc., complete
column 16 1.50 1.50 0.15 5.40
Plinth Beam 1 84.40 0.30 0.15 3.80

9.20 1800.00 Cu.m

2a Sand filling for Basement with field sand


Portico 1 5.03 4.88 1.00 24.55
Living 1 5.10 5.63 1.00 28.71
Bed 1 4.27 4.11 1.00 17.55
Toilet 1 3.28 1.07 1.00 3.51
Dining 1 3.66 2.89 1.00 10.58
Kitchen 1 4.41 3.66 1.00 16.14
Pooja 1 5.10 3.05 1.00 15.56
Utility 1 1.98 1.07 1.00 2.12
Bath 1 1.22 1.50 1.00 1.83
120.54 1200 Cu.m

3 Plain Cement concrete 1:5:10 mix using


40mm HBG jelly for al foundation and
basement with well rammed and
consolidated with standard specification
etc., complete.

column 16 1.50 1.50 0.15 5.40


Plinth Beam 1 84.40 0.30 0.15 3.80
FOR BASEMENT
Portico 1 5.03 4.88 0.15 3.68
Living 1 5.10 5.63 0.15 4.31
Bed 1 4.27 4.11 0.15 2.63
Toilet 1 3.28 1.07 0.15 0.53
12.03.2019.

Dining 1 3.66 2.89 0.15 1.59


Kitchen 1 4.41 3.66 0.15 2.42
Pooja 1 5.10 3.05 0.15 2.33
Utility 1 1.98 1.07 0.15 0.32
Bath 1 1.22 1.50 0.15 0.27
27.28 4500.00 Cu.m

4 Brick work in cement mortar 1:5 mix


using Ist class chamber burnt bricks for
all basement with standard specification
etc., complete

Basement 1 84.40 0.23 1.00 19.41


Superstructure 1 84.40 0.23 3.05 59.21
Partition 1 20.88 0.12 3.05 7.64
(0.3X0.15/2)
Staircase Steps 1 0.02 1.12 0.03
Deduction of opening
MD Main door 1 1.20 0.23 2.10 -0.58
D Door 3 0.90 0.23 2.10 -1.30
D1 Door 1 0.76 0.12 2.10 -0.19
W Window 11 1.50 0.23 1.37 -5.20
V Ventilator 1 0.60 0.23 0.45 -0.06
-7.34
78.95 6500.00 Cu.m

5
Reinforced cement concrete 1:2:4 mix
using 20mm HBG jelly for plinth, Lintel,
Beam, loft, Sunshade & roof slab with
standard specification etc., complete

column mat 16 1.50 1.50 0.30 10.80


Pedestal 16 1.18 0.60 11.34
Column 1 16 0.23 0.23 5.05 4.27
Plinth beam 1 84.40 0.23 0.45 8.74
Basement belt 1 84.40 0.23 0.15
lintel 1 84.40 0.23 0.23 4.46
Partition 1 20.88 0.12 0.30 0.75
Stair waist Slab 1 5.24 1.22 0.13 0.83
Roof Beam 1 84.40 0.23 0.30 5.82
Roof 1 10.05 13.72 0.13 17.93
1 5.03 3.05 0.13 1.99
Deduction staircase 1 2.55 1.83 0.13 -0.61
66.33 8500.00 Cu.m

6 Supplying of Steel for all R.C.C works


using plain twisted rods and binding
wire with standard specifications etc.,
complete
1 66.33 x130/1000 8.62 65000.00 M.T
12.03.2019.

7 Supplying and fixing of doors and


windows arrangements including all
other essential furniture fittings with
standard specifications etc., complete

MD Main door 1 1.20 2.10 2.52


D Door 3 0.90 2.10 5.67
D1 Door 1 0.76 2.10 1.60
W Window 11 1.50 1.37 22.61
V Ventilator 1 0.60 0.45 0.27
32.66 10000.00 Sq.m

8 Ceiling plastering in cement mortar 1:3


mix using 12mm thick for all R.C.C
works with standard specifications etc.,
complete
Portico 1 5.03 4.88 24.55
Living 1 5.10 5.63 28.71
Bed 1 4.27 4.11 17.55
Toilet 1 3.28 1.07 3.51
Dining 1 3.66 2.89 10.58
Kitchen 1 4.41 3.66 16.14
Pooja 1 5.10 3.05 15.56
Utility 1 1.98 1.07 2.12
Bath 1 1.22 1.50 1.83
120.54 350.00 Sq.m

9 Wall plastering in cement mortar 1:5


mix using 20mm thick for all exposed
brick works with standard specifications
etc., complete

OUTER
Basement 1 47.54 1.00 47.54
super structure 1 47.54 3.05 145.00
Parapet 1 47.54 2.23 106.01
Inner (L+Bx2)x3.05
Portico 1 5.03 4.88 3.05 60.45
Living 1 5.10 5.63 3.05 65.45
Bed 1 4.27 4.11 3.05 51.12
Toilet 1 3.28 1.07 3.05 26.54
Dining 1 3.66 2.89 3.05 39.96
Kitchen 1 4.41 3.66 3.05 49.23
Pooja 1 5.10 3.05 3.05 49.72
Utility 1 1.98 1.07 3.05 18.61
Bath 1 1.22 1.50 3.05 16.59
676.20 300.00 Sq.m

10a Floor Finish with Vertified tiles over the


p.c.c.1:4:8 with standard specification
etc., complete

Portico 1 5.03 4.88 24.55


Living 1 5.10 5.63 28.71
Bed 1 4.27 4.11 17.55
12.03.2019.

Toilet 1 3.28 1.07 3.51


Dining 1 3.66 2.89 10.58
Kitchen 1 4.41 3.66 16.14
Pooja 1 5.10 3.05 15.56
Utility 1 1.98 1.07 2.12
Bath 1 1.22 1.50 1.83
120.54 1600.00 Sq.m

11 Ceiling white washing two coats over all


ceiling plastering area with lime powder
with standard specifications etc.,
complete 49.30 150.00 Sqm

12 Outer wall white washing two coats with


super cem with standard specifications
etc., complete 192.54 200.00 Sqm

13 Inner wall white washing two coats with


emulsion using over a priming coats
with standard specifications etc.,
complete 377.65 300.00 Sqm

14 Provision for wood work painting with


standard specification etc., complete 32.66 400.00 Sqm

15 Provision for Electrification


arrangements with standard
specifications etc., complete 150.00 1000.00 Points
Contingencies and other unforceen
16 charges l.s

III EXTRA AMENITIES

1 Provision for water supply arrangements l.s

3 Provision for Sanitary arrangement l.s

I) GROUND FLOOR TOTAL

Ground Floor Plinth Area 1650.00 Sqft.


G.F Cost of Construction per Sqft Rs.1890.90/-

II. FIRST FLOOR-121.25 Sq.ft


1 Brick work in cement mortar 1:5 mix
using Ist class chamber burnt bricks for
all supersture with standard
specification etc., complete
Superstructure 1 84.40 0.23 3.05 90.10
Partition 1 20.88 0.12 3.05 7.64
Parapet 1 84.40 0.23 1.00 19.41
Deduction of opening
12.03.2019.

D Door 3 0.90 0.23 2.10 -1.30


D2 door 4 0.76 0.12 2.10 -0.77
W Window 8 0.90 0.12 1.37 -1.18
V Ventilator 3 0.76 0.23 0.60 -0.31
-3.25
113.90 7000.00 CUM
2

Reinforced cement concrete 1:2:4 mix


using 20mm HBG jelly for plinth, Lintel,
Beam, loft, Sunshade & roof slab with
standard specification etc., complete
Column 1 16 0.23 0.35 4.05 5.22
Lintel 1 84.40 0.23 0.23 4.46
1 20.88 0.12 0.30 0.75
Roof beam 1 84.40 0.23 0.30 5.82
20.88 0.23 0.30 0.00
Roof 1 1 10.05 13.72 0.15 20.68
1 5.03 3.05 0.15 2.30
39.24 9000.00 Cum

3 Supplying of Steel for all R.C.C works


using plain twisted rods and binding
wire with standard specifications etc.,
complete
1 39.24 x120/1000 5.10 65500.00 MT

4 Supplying and fixing of doors and


windows arrangements including all
other essential furniture fittings with
standard specifications etc., complete

D Door 3 0.90 2.10 5.67


D2 door 4 0.76 2.10 6.38
W Window 8 0.90 1.37 9.86
V Ventilator 3 0.76 0.60 1.37
23.29 12000.00 Sqm
5 Ceiling plastering in cement mortar 1:3
mix using 12mm thick for all R.C.C
works with standard specifications etc.,
complete
Balcony 1 5.03 5.63 28.32
Bed 1 4.27 4.11 17.55
Toilet 1 3.28 1.07 3.51
Bed 1 3.47 4.11 14.26
Toilet 1 2.36 1.76 4.15
Toilet 1 1.83 1.76 3.22
Bed 1 3.81 3.35 12.76
83.78 300.00 Sqm
6 Wall plastering in cement mortar 1:5
mix using 20mm thick for all exposed
brick works with standard specifications
etc., complete
OUTER
super structure 1 53.00 5.21 276.13
Inner (L+Bx2)x3.05
Balcony 1 5.03 5.63 3.05 65.03
12.03.2019.

Bed 1 4.27 4.11 3.05 51.12


Toilet 1 3.28 1.07 3.05 26.54
Bed 1 3.47 4.11 3.05 46.24
Toilet 1 2.36 1.76 3.05 25.13
Toilet 1 1.83 1.76 3.05 21.90
Deduction of wood work -23.29
488.79 300.00 Sqm
7 Floor Finish with Vertified tiles over the
p.c.c.1:4:8 with standard specification
etc., complete

Balcony 1 5.03 5.63 28.32


Bed 1 4.27 4.11 17.55
Toilet 1 3.28 1.07 3.51
Bed 1 3.47 4.11 14.26
Toilet 1 2.36 1.76 4.15
Toilet 1 1.83 1.76 3.22
Skirtting 1 77.36 0.15 11.60
71.01 1200.00 Sqm
8 Ceiling white washing two coats over all
ceiling plastering area with lime powder
with standard specifications etc.,
complete 83.78 150.00 Sqm

9 Outer wall white washing two coats with


super cem with standard specifications
etc., complete 276.13 200.00 Sqm

10 Inner wall white washing two coats with


emulsion using over a priming coats
with standard specifications etc.,
complete 212.66 300.00 Sqm

11 Provision for wood work painting with


standard specification etc., complete 23.29 400.00 Sqm

12 Provision for Electrification


arrangements with standard
specifications etc., complete 120.00 1000.00 Points

13 Provision Weathering course


arrangements with standard
specification etc., complete 153.56 1200.00 Sqm

14 Contingencies and other unforceen


charges

III EXTRA AMENITIES

1 Provision for water supply arrangements l.s

2 Provision for Sanitary arrangement l.s


12.03.2019.

II)FIRST FLOOR TOTAL


12.03.2019.

First Floor Plinth Area 1650.00 Sqft.


F.F Cost of Construction per Sqft Rs.1551.15/-

ABSTRACT:

I) GROUND FLOOR 3120000.00

II) FIRST FLOOR 2560000.00

5680000.0

(RUPEES FIFTY SIX LAKHS AND EIGHTY THOUSANDS ONLY)


12.03.2019.
12.03.2019.

MOHAMED SATHAK

ST. AMOUNT Rs.56.80Lacs

AMOUNT

17947.08

16556.40

144648.36
12.03.2019.

122755.70

513171.17

563836.91

560520.22
12.03.2019.

326610.00

42189.11

202860.66
12.03.2019.

192864.48

7394.78

38507.40

113295.30

13064.40

150000.00

23778.04

3050000.00

35000.00

35000.00

3120000.00
12.03.2019.

797280.54

353181.56

334148.99

279432.00

25133.34
12.03.2019.

146637.60

85217.16

12566.67

55226.00

63798.60

9314.40

120000.00

184272.00

8791.14
2475000.00

45000.00

40000.00
12.03.2019.

2560000.00
12.03.2019.
12.03.2019.
12.03.2019.

DE.COLUMN
PLINTH BEAM 16.46
16.46

3.66
3.05

7.92
7.92
7.92
17947.08
63.39
12.03.2019.

0.3 0.15 0.0225

Pedestal size ( area -A2)


Footing 0.75 0.75
Size( are
aCoping
- A1) 1.50 1.50
height h 0.90
For single column Coping ={A12+A22+Sqrt(A12 *A22)}*h/3 1.18

130.00 1000
12.03.2019.

9.91 2.00 19.82


10.73 2.00 21.46
8.38 2.00 16.76
4.35 2.00 8.7
6.55 2.00 13.1
8.07 2.00 16.14
8.15 2.00 16.3
3.05 2.00 6.1
2.72 2.00 5.44

19.82
21.46
16.76
12.03.2019.

8.70
13.10
16.14
16.30
6.10
5.44
0.00

3050000.00
2800000.00
0.00
560000.00

0.35
12.03.2019.

130.00 1000 5.10151135

10.66 2.00 21.32


12.03.2019.

8.38 2.00 16.76


4.35 2.00 8.7
7.58 2.00 15.16
4.12 2.00 8.24
3.59 2.00 7.18

21.32
16.76
8.70
15.16
8.24
7.18
77.36
0.00

2475000
655000 0.00
12.03.2019.

#VALUE!
12.03.2019.
12.03.2019.

You might also like