You are on page 1of 52
Agreement And Conditions Of PAM Contract 2006 (With Quantities) ‘Table of Contents Articles Of Agreement Preliminary Recitals + Date of agreement + Parties to sgreement and ther adresses + ‘Thenatute ofthe works and the location + ‘The erawings and bis of quantities Articles Asticle | Contactors Obligations Aicle2 Contact Sum Asticle 3 Architect Astiole 4 Engineer Aaticle Quantity Surveyor Anticle 6 Specialist Consutant Article 7 Definitions Anicle 8 Meanings Attestation/Signatories Of The Parties yas Of Contract 0 Contractor's Obligations Ml Completion of Works in accordance with Contract Documents 2 ‘Temporary wor and construction method Contractor's design and responsibilities La Discrepancy or divergence between documents 20 Architeet’s Instructions (‘AV’) 21 Contractor to comply with AT 22 al 23 Provisions empowering instructions 24 Failure of Contractor to comply with AI 30 Contract Documents, Programme And As-built Drawings BL Contract Documents 32 Custody of tender documents 33 Copies of documents 34 Further drawings or details, 35 ‘Works Programme 36 Programme not part of Contract 37 Architect's aceeplance of programme 38 Availability of documents 39 Limitation of use of documents 3.10 ‘As-built Drawings and operation and maintenance manuals 40 Statutory Obligations, Notices, Fees And Charges 4d Statutory requirements 42 Inconsistencies with statutory requirements PAM Contract 2006 (With Quanties) Page 10 10 10 10 10 10 10 10 u n i 0 ‘Table of Contents (Contd) ‘The Conditions OF Contract (Contd) Clause 43 4a 50 5 6 61 62 63 64 65 66 62 68 10 7 72 73 8.0 81 82 83 90 94 10.0 101 102 110 md 2 13 ia ins 116 17 18 19 20 121 122 13.0 Ba 40 141 42 43 wa 15.0 15 152 153 154 ‘Conforming to statutory obligations Fees, levies and charges Levels And Setting Out Of The Works Setting out ‘Materials, Goods And Workmanship To Conform To Description, Testing And Inspection ‘Standards of works, materials, goods and workmanship Provision af vouchers Inspection and testing Contractor's obligation not relieved ‘Work not in accordance with the Contract, 'No compensation for time and cost Failure of Contractor to comply ‘Warranties in respect of materials and goods Royalties And Intellectual Property Rights Indemnity to Employer Contractor's ibility to pay Government royalties Site Agent Site Agent Instructions to Site Agent Exclusion of Person employed on the Works Access To The Works ‘Access to the Works Site Staff Duty of Site Staff Directions given by Site Staff ‘Variations, Provisional And Prime Cost Sums Definition of Variation [No Variations required by Architect shall vitiate Contract seue of Variations after Practical Completion Al on P.C. Sums and Provisional Sums ‘Valuation of Variations and Provisional Sums ‘Valuation rules ‘Additional expense caused by Variation ‘Access to Contractor's books and documents Variations and additional expenses added to Contract Sum Contract Bills Measurement of building works ‘Correction of errors of omissions ‘Contract Sum ‘Contract Sum not to be adjusted or altered ‘Materials And Goods Materials and goods not to be removed ‘Materials and goods included in certificates Responsibility for materials and goods ‘Warranty of title of goods and materials Practical Completion And Defects Liability Practical Completion Cerificate of Practical Completion Contractors failure to comply with undertaking Schedule of Defects PAM Contact 2006 (With Quantities) Page “

You might also like