Agreement And Conditions
Of
PAM Contract 2006
(With Quantities)‘Table of Contents
Articles Of Agreement
Preliminary Recitals
+ Date of agreement
+ Parties to sgreement and ther adresses
+ ‘Thenatute ofthe works and the location
+ ‘The erawings and bis of quantities
Articles
Asticle | Contactors Obligations
Aicle2 Contact Sum
Asticle 3 Architect
Astiole 4 Engineer
Aaticle Quantity Surveyor
Anticle 6 Specialist Consutant
Article 7 Definitions
Anicle 8 Meanings
Attestation/Signatories Of The Parties
yas Of Contract
0 Contractor's Obligations
Ml Completion of Works in accordance with Contract Documents
2 ‘Temporary wor and construction method
Contractor's design and responsibilities
La Discrepancy or divergence between documents
20 Architeet’s Instructions (‘AV’)
21 Contractor to comply with AT
22 al
23 Provisions empowering instructions
24 Failure of Contractor to comply with AI
30 Contract Documents, Programme And As-built Drawings
BL Contract Documents
32 Custody of tender documents
33 Copies of documents
34 Further drawings or details,
35 ‘Works Programme
36 Programme not part of Contract
37 Architect's aceeplance of programme
38 Availability of documents
39 Limitation of use of documents
3.10 ‘As-built Drawings and operation and maintenance manuals
40 Statutory Obligations, Notices, Fees And Charges
4d Statutory requirements
42 Inconsistencies with statutory requirements
PAM Contract 2006 (With Quanties)
Page
10
10
10
10
10
10
10
10
u
n
i
0‘Table of Contents (Contd)
‘The Conditions OF Contract (Contd)
Clause
43
4a
50
5
6
61
62
63
64
65
66
62
68
10
7
72
73
8.0
81
82
83
90
94
10.0
101
102
110
md
2
13
ia
ins
116
17
18
19
20
121
122
13.0
Ba
40
141
42
43
wa
15.0
15
152
153
154
‘Conforming to statutory obligations
Fees, levies and charges
Levels And Setting Out Of The Works
Setting out
‘Materials, Goods And Workmanship To Conform To Description, Testing And Inspection
‘Standards of works, materials, goods and workmanship
Provision af vouchers
Inspection and testing
Contractor's obligation not relieved
‘Work not in accordance with the Contract,
'No compensation for time and cost
Failure of Contractor to comply
‘Warranties in respect of materials and goods
Royalties And Intellectual Property Rights
Indemnity to Employer
Contractor's ibility to pay
Government royalties
Site Agent
Site Agent
Instructions to Site Agent
Exclusion of Person employed on the Works
Access To The Works
‘Access to the Works
Site Staff
Duty of Site Staff
Directions given by Site Staff
‘Variations, Provisional And Prime Cost Sums
Definition of Variation
[No Variations required by Architect shall vitiate Contract
seue of Variations after Practical Completion
Al on P.C. Sums and Provisional Sums
‘Valuation of Variations and Provisional Sums
‘Valuation rules
‘Additional expense caused by Variation
‘Access to Contractor's books and documents
Variations and additional expenses added to Contract Sum
Contract Bills
Measurement of building works
‘Correction of errors of omissions
‘Contract Sum
‘Contract Sum not to be adjusted or altered
‘Materials And Goods
Materials and goods not to be removed
‘Materials and goods included in certificates
Responsibility for materials and goods
‘Warranty of title of goods and materials
Practical Completion And Defects Liability
Practical Completion
Cerificate of Practical Completion
Contractors failure to comply with undertaking
Schedule of Defects
PAM Contact 2006 (With Quantities)
Page
“