You are on page 1of 123
XCUREMENT REFORM ACT INT PRC wen PRACTICES we THE PeAND I = PRINCIPL of the documents submitted in satisfaction bidding requirements isan authentic copy of the poe the complete, and all statements and information pro); al, therein are true and correct; Vided the HoPE or his duly authorizeg ify all the documents submitted; (Bach repre. (a) It is authorizing sentative/s to veril sclosure provision under Sect; i {e) It complies with the di in relation to other provis; of the Act and this IRR, R.A. 3019; It complies with existing labor laws and standards; (g) It complies with the responsibilities of a prospect; eligible bidder provided in the PBDs; Bere ae (h) It did not give or pay, directly or i v indirect] commlesions SMa on era! Pooley otherwise, | we St eembeteon oe oficial pe oe procurement project or activity. Beireistion to at 25.2(0Niv)al 52aNiv), 25.20, ‘on 47 ‘ONS of 25.4. The second envelope formatio! shall contain the financial i: al omni = shall be received uae by the BAC on the date, time, and place aoe Invitation , | alae of In- terest. Sorceress last day of posting of the Invitation aeunireneen ; of Seiad up to the a) For Goods, a maximum days, Period of forty-five (45) calendat 50 calendar days 65 calendar days RULE Vill — RECEy EPT AND OPENING OF BIDS id 3) Li List of contractor's major equipment units, ae owned, leased, and/or under pur- ership a cments, supported by proof of own- om certification of availability of equip- mak rom the equipment lessor/vendor for the luration of the project, as the case may be; and Omnibus Sworn Statement i : ¢ tion 25.3 of this IRR; woteneet “ ©) Forthe procurement of Consulting Services: i) The bid security in the i validity ae prescribed form, amount and ii) Organizational chart for the contract to be bid; iii) List of completed and ongoing projects; iv) Approach, work plan, and schedule: Provided, how- ever, That for architectural design, submission of ar- chitectural plans and designs shall not be required during the consultant's selection process; é v) _ List of key personnel to be assigned to the contract to 2 be bid, with their complete qualification and experi- ence data; and Omnibus Sworn Statement in accordance with Sec- tion 25.3 of this IRR. (a) s Sworn Statement executed by the bidder, or its representative, shall contain the following: in) signatory is the duly authorized representative of the nective bidder, and granted full power and authority do, execute and perform any and all acts necessary to pate, submit the bid, and to sign and execute the en- ng contract accompanied by the duly notarized Special ywer of Attorney, Board/Partnership Resolution, or Sec- ‘s Certificate, whichever is applicable; not “blacklisted” or barred from bidding by the GoP of its agencies, offices, corporations, or LGUs, in- foreign government/foreign or international fi- institution whose blacklisting rules have been d by the GPPB; b> i) PhiIGEPS Certificate of Regi viii) Project Ri 0 or TH GOVERNMENT PROCUIEMEN T MEROMM A PRINCIPLES AND PRACTICES: vill) Omnibus Sworn Statement in accordance With fee tion 25.3 of thin IRR) and ix) For foreign bidders claiming eligibility by reason of their country’s extension of reciprocal rights nos, a certification from the relevant go fice of their country stating that Fillping to participate in their government procurement a¢ tivities for the same item or product, For the procurement of Infrastructure Projects: ion and member. ship in accordance with Section 8.5.2 of this IRR, except for foreign bidders participating in the pro. curement by a Philippine Foreign Service Office or Post, which shall submit their el ibility documents under Section 23.1 of this IRR: Provided, That the winning bidder shall register with the PhIIGEPS in accordance with Section 37.1.4 of this IRR. ii) PCAB License and Registration; incase of JV; (GPPR Resolution No. 21-2017 dated May 30, 2017 Approving Amendments to the 2016 Revised Implementing Rules and regulations [IRR] of R.A, No. 9184) iii) Statement of all Ongoing Government and Private Contracts; iv) Statement of SLCC; v) _NEFCC Computation; vi) _JVA, if applicable; vii) Bid securi Bid ity in the prescribed form, amount and va- lidity period; I ‘quirements, which shall include the fol- lowing: () Organizational chart for the contract to be bid; (2) List of contractor’s personnel (e.g., Project Man- a Project Engineers, Materials Engineers, and Foremen), to be assigned to the contract to be bid, with their comple nasoens : Perience data; plete qualification and &

You might also like