SEMANA 01

ITEN
NOMBRE
1 2 3 4 5

- U-35 Rajo Rebaje 30%


- U-35 Desq. Sector Clavo
-
TOTAL CARROS U-35 MIN 0 0 0 0
TOTAL TONELAS EXTRAIDAS 0.0 0.0 0.0 0.0
SEMANA 01 SEMANA 02
6 7 8 9 10 11 12 13

15 14

0 0 0 0 0 15 14
0.0 0.0 0.0 0.0 0.0 25.5 23.8
SEMANA 02 SEMANA 03
14 15 16 17 18 19 20 21

22 12 9 12 15 11 12
7 8

22 12 16 20 15 11 12
37.4 20.4 27.2 34.0 25.5 18.7 20.4
A 03 SEMANA 04
22 23 24 25 26 27 28 29

16 18 16 18 24 22 18

16 18 16 18 24 22
27.2 30.6 27.2 30.6 40.8 37.4
TOTAL OBSERVACIONES
30 31

20 274 Rebaje carga de Rajo


15 Labor desquinche Mins piso
0 Labor recorte cuadro ppal.
289 Total Carros Mineros Extraido 289
426.7 Descaje 10% 42.67%
STOCK MINERAL MINA 45.70%