Project Name (Font size 18, Bold)

Proposal, Technical Project (Font Size 16, Bold)

Group Name and ID (Font Size 14, Bold)

Client Name

Version (Font size 12)

date

This proposal is submitted to the Information Technology


department in partial fulfillment for the ITP module in the
Diploma in Information Technology program.
DECLARATION

<Statement of originality>

Sample

We hereby declare that the project work entitled “Project Title”, submitted to the
SLIIT Academy (Pvt.) Ltd. a subsidiary of Sri Lanka Institute of Information
Technology is a record of an original work done by us, under the guidance of our
Supervisor “Name of the supervisor”. This project work is submitted in the partial
fulfillment of the requirement for the award of the Diploma in Information
Technology. The Results embodied in this report have not been submitted to any other
University or Institution for the award of any degree or diploma. Information derived
from the published or unpublished work of others has been acknowledged in the text
and a list of references is given. (Normal Font Size 12, Headings must be bold)

Project ID:

Group Members:

Student ID Student Name Signature

Date of Submission: ……………………………………..

Name of Supervisor: Roshan Jayawardana

…………………………….…
Signature of the Supervisor

i
Table of Contents
DECLARATION ............................................................................................................ i

LIST OF TABLES ........................................................................................................ iv

LIST OF FIGURES ...................................................................................................... iv

1 INTRODUCTION ................................................................................................. 1

1.1 BACKGROUND OF THE CLIENT/ PROJECT ........................................... 1

1.2 PROBLEM STATEMENT ............................................................................. 1

1.3 NEEDS STATEMENT ................................................................................... 1

1.4 SOLUTION AND OBJECTIVES ................................................................... 1

2 PROPOSED TECHNICAL APPROACH ............................................................. 2

2.1 DEVELOPMENT METHODOLOGY ........................................................... 2

2.2 REQUIREMENT GATHERING .................................................................... 2

2.3 ARCHITECTURE DIAGRAM ...................................................................... 3

2.3.1 AS IS SYSTEM ....................................................................................... 3

2.3.2 TO BE SYSTEM ..................................................................................... 3

2.4 FUNCTIONAL REQUIREMENTS ............................................................... 4

2.5 NON-FUNCTIONAL REQUIREMENTS ..................................................... 4

2.6 IMPLEMENTATION AND DEVELOPMENT REQUIREMENTS. ............ 4

2.7 RUNNING ENVIRONMENT REQUIREMENTS ........................................ 4

2.8 QUALITY ASSURANCE PLAN ................................................................... 4

3 EXPECTED PROJECT RESULTS ....................................................................... 5

3.1 DELIVERABLES ........................................................................................... 5

3.2 MEASURES OF SUCCESS ........................................................................... 5

4 BUDGET ............................................................................................................... 6

5 ROLES AND RESPONSIBILITIES ..................................................................... 7

6 SCHEDULE ........................................................................................................... 8

7 REFERENCES ...................................................................................................... 9

ii
8 APPENDICES ..................................................................................................... 10

iii
LIST OF TABLES
Table 3.2.1: Roles and responsibilities of the project. ................................................... 7

LIST OF FIGURES
Figure 2.1.1: Waterfall development methodology [1] ................................................. 2
Figure 2.3.1: AS IS System............................................................................................ 3
Figure 2.3.2: TO - BE System ....................................................................................... 3

iv
1 INTRODUCTION
Explain what you are going to describe in this chapter

1.1 BACKGROUND OF THE CLIENT/ PROJECT


[Description about your client and their business operations. If the project is an own
idea description about the field of the study/project]

1.2 PROBLEM STATEMENT


Description about their as – is – system and drawbacks of it. Explain the elements,
Affects, Results of activities and so on. Describe the background information about
the project, including the description of the current solutions and the problems you
have discovered.

1.3 NEEDS STATEMENT


State short-comings apparent in current organization or system to be addressed by the
project.

1.4 SOLUTION AND OBJECTIVES


Identify changes desired to be seen upon completion of effort. List down main
objectives of the project where you address the problems of the current system or
current situation.

1
2 PROPOSED TECHNICAL APPROACH
Under this chapter, define clearly a well thought-out and solid technical plan for
applying information technology to the proposed project. This section should include
a description of the methodology to be used to complete the project, a specific plan
for gathering requirements, an architecture design, best practice for implementation,
and quality assurance.

2.1 DEVELOPMENT METHODOLOGY


Explain your selected development methodology with proper reasons. You can use
references and figures. Figures must be referred to a figure table. I have given a
sample Figure and Reference. All the referencing must follow IEEE conventions.

Figure 2.1.1: Waterfall development methodology [1]

2.2 REQUIREMENT GATHERING


Explain how you have gathered details for the proposal. (Interviews, Questionnaire or
any other methods. Provide images and other things as appendices)

2
2.3 ARCHITECTURE DIAGRAM
Explain the Architecture diagram and under this topic present the as is system and To
be system.

2.3.1 AS IS SYSTEM
Give a Figure of As-Is system.

Figure 2.3.1: AS IS System

2.3.2 TO BE SYSTEM
Described figure of the to be system

Figure 2.3.2: TO - BE System

3
2.4 FUNCTIONAL REQUIREMENTS
Present the requirements as understood at this time through contacts with the
stakeholder. Include a high-level diagram such as a use case system diagram (Basic
Diagram only) or block diagram to capture the situation being addressed.

2.5 NON-FUNCTIONAL REQUIREMENTS


Present the non-functional requirements of the system.

2.6 IMPLEMENTATION AND DEVELOPMENT


REQUIREMENTS.
Describe your methodology for implementation which includes details about platform
and technologies to be used in the project.

2.7 RUNNING ENVIRONMENT REQUIREMENTS


Describe the requirements of the environment to run your application.

2.8 QUALITY ASSURANCE PLAN


Describe the potential risks related to the software quality. Provide the project
management plan to enable quality. Describe the salient, planned testing
considerations.

4
3 EXPECTED PROJECT RESULTS
List deliverables expected to be produced for the project, and for the stakeholder.

3.1 DELIVERABLES
List of the main deliverables.

3.2 MEASURES OF SUCCESS


Describe an assessment plan to identify the degree of achievement obtained by the
operation of the project. List a measure, its relevancy to the organization, its current
value, and its projected improved value. A measure should also correspond to the
stated objectives of the project.

5
4 BUDGET
Estimate budget for the project under this section. Clearly mention your assumptions
and calculations.

6
5 ROLES AND RESPONSIBILITIES
Roles and responsibilities of project members should be clearly stated in the
beginning of the project.

**The following table can be used as a template:

Table 3.2.1: Roles and responsibilities of the project.

Role Responsibility Participant(s)


Project Sponsor
Project Leader
Analysis
Design
Implementation
Testing

7
6 SCHEDULE
Include principal tasks, their duration, and their sequence. Wherever possible, the
methods and task to be performed should be outlined in logical sequence and
explained in detail. Include a proper GANTT Chart here.

8
7 REFERENCES

[1] M. Lotz, "Waterfall vs. Agile," Segue Technologies Inc, 05 July 2018. [Online].
Available: https://www.seguetech.com/waterfall-vs-agile-methodology/.
[Accessed 17 July 2019].

9
8 APPENDICES

10
STYLE CONVENTIONS (Only for reference remove from your final report)

FORMAT

The proposal should be typed. All text, Figures and Tables should appear on only one
side of each sheet of paper. All pages other than the cover sheet should have page
numbers that begin with “1” on the first page after the content page and should
continue through the last page of the reference page, but not the appendices.

The right-hand, Upper and Lower margin should be 1”. The left-hand margin must be
1.5” on each page of the document because of the binding. The margin instructions
should be followed in the appendices as well.

The font size in the text should be in 12, in subsections 12 and in the main headings
16. The main headings are to be written in capitals and placed at the beginning of a
new page. Level 2 Heading should be 14 and all capitals. All level 1 and 2 headings
are to be in bold letters. Level 3 headings must be 12 all capitals. Leave two empty
lines under the main heading, two empty lines above the subsection and one empty
line under it. The headings should not have more than three numbers. A line spacing
of 1.5 should be used in the text, 1 on the title page and in the abstract. The font to be
used is Times New Roman. The page number is placed in the lower right corner.

The text should not be indented and both margins on the page should be justified.
When a paragraph continues the next page, at least two lines of the paragraph should
be left on the upper or lower end of the page. The paragraphs are separated from each
other and from the headings with one empty line. A new chapter is started on a new
page. One empty line is needed to separate two paragraphs.

PARAGRAPH TEXT

The text of the report should be written in complete sentences. The style should be
formal. Formal style means to avoid abbreviations that are common in spoken
English.

11
FIGURES AND TABLES

All Figures and Tables should have a number and a caption. Tables should have the
caption before the table and for figures the caption should be placed at the bottom of
the image. If a figure or table is extracted from a source; the source should be cited in
the references.