You are on page 1of 2

Installation for 2 hp air conditioner.

Installation fee for 2 hp


10,000 (Free ten ft, cooper tubing
Labor and Material)

Excess ft charge 250 pesos per ft.


All in ft is 30 ft
Less 10 ft = 20 ft to be paid

20 x 250 = 5000

TOTAL: 5,000 + 10,000 = 15,000


Installation for 1.5 hp air conditioner.

Installation fee for 1.5 hp


10,000 (Free ten ft, cooper tubing
Labor and Material)

Excess ft charge 250 pesos per ft.


All in ft is 40 ft
Less 10 ft = 30 ft to be paid

30 x 250 = 7,500

TOTAL: 7,000 + 10,000 = 17,000

You might also like