You are on page 1of 4

Integration Steps of A1/A2

This document is available for India CPAN scenes only

Tan Zaiwei
zwtan@fiberhome.com
Fiberhome India Private Limited

This document is written on condition A1/A2 is already connected with B1/B2 and
physical installation was finished.

1.NE Creation
1) Right click project →New Network Block

2) Click “…” button


3) Select NE type as “Citrans 610A” and give proper IP address and mask

4) Put the icon from logical tree into to main top

2.Write NE IP
1) Click “configuration” →”NE IP Remote Config”

2) Select UP-Link NE and query S/N via “Find Near NE by SN”

3) Copy relevant A1/A2 EMU SN


4) Paste the SN on relevant A1/A2 and then “Write Remote NE IP”

3.Download Management configuration


1) Right click the NE block -> select “config” -> Time Calibration -> Download Management Config

You might also like