You are on page 1of 2
aa 4B 28 2B 3B 4a 3 fem ILI III (9p) MANIPAL INSTITUTE OF TECHNOLOGY “yee MANIPAL ‘Vil SEMESTER B.TECH. (CHEMICAL ENGINEERING) MAKE UP EXAMINATIONS, DECEMBER 2017 SUBJECT: PROJECT ENGINEERING [CHE 4023} REVISED CREDIT SYSTEM Time: 3 Hours Tnsnuetions 19 Candidates: & Answer ALD the questions. & Missing data may be suitable assumed MAX. MARKS: 50 \What isthe importance of scheduling in Project Engineering? Explain Project Networks Discuss the importance of pump curves and define Best Eificiency point |What ae the factors to be considered for selection of engineering material? List the preliminary Procurement data required fora Project Outline the structure oF a Material Safety Data Sheet Sustify the statement feat must not be transfered across the pinch” ‘Describe the Line designation standards followed in a Piping and Instrumentation Diagram Foracase ofa nominal annual interest rate of 18% per year, determine the total amount to which Rs. 100 of initial principal would accumulate after one year andthe effective interes rate with, 8) Annual compounding bb) Monthly compounding ©) Daily compounding 4) Comtinaous compounding ‘refinery ba two crates availabe tha have yields shown inthe following isle, Because of cauinmem ane limitation, production of gasoline kerosene and fue il must be ied 3s shown inthe table 0 plant imiutionson he other products. The profit on processing crue | and 2 are Rs, SOI and. 100/91 spe maximize the profit, kerosene Crude 1 ¢hou Crude 2 (hours) Mas. timelweck 3300 500 isi Aiawable ively. Find the optimum deily pcocessng time oF the two erades oF this plan sing simplex method to [Mention any four differences between slow sand and rapid san filers Pawucis ‘What do you mean by sloughing and bulking i A mechanically cleaned bar seen has bars of § mm thick and 39m clear poo between the bars the Mew rate is 0.20 ns, velocity’ through the bars is 0.90 re (3 mari) rms determine the approach velociy. head loss through the sereen and elective = of 22 ms seeeives wastewater discharge of 0. The intial DO of the river water is 6.3 mL, and DO content in the wastewater is (06 ma. The five day BOD in the river water is 3 mg/L and the wastewater 4C,_whled 10 river has five day BOD of 130 mg/L. Consider saturation DO of $.22 (S mes) img. and deoxygenation and rearation constam values of 0.1 and 0.3 per da respectively. Find critical DO deficit and DO in the river afier one day. The average veloity of flow in the stream after mixing of wastewater is 0.18 mise: Explain about the following: () Stem layer and Zeta potential fr colloids in solution (Gi) Concept of zero liquid discharge SA Gil). Mechanism of photo catalysis with a nat sketch Gv)_ Rate limiting steps of adsorption process. r2- 10 marks) (©) Working principle of bundle of hollow fiber membrane witha net sketch cH 4006 Page 2 of

You might also like