HPS - Bor Air Tampusu
Harga Satuan
No. Uraian SATUAN KET.
(Rp.)
A TENAGA
1 Pekerja OH 100,000.00
2 Mekanik OH 120,000.00
3 Mandor OH 120,000.00
4 Juru bor OH 125,000.00
5 Operator OH 150,000.00
6 Tukang Batu OH 125,000.00
7 Kepala Tukang OH 150,000.00
8 Tukang Kayu OH 125,000.00
9 Tukang Besi OH 125,000.00
10 Tukang OH 125,000.00
11 Tukang Cat OH 125,000.00
12 Geolistrik OH 140,000.00
13 Ass. Geolistrik OH 120,000.00
14 Driller OH 150,000.00
B BAHAN
1 Minyak Pelumas Oli LTR 30,000.00
2 Bahan Bakar Bensin (Eceran) LTR 8,000.00
3 Solar Ltr 6,500.00
4 Kabel NYY 3 x 2,5 mm M 11,000.00
Kabel NYM 2 x 2,5 mm M 9,500.00
5 Filter Gravel M3 200,000.00
6 Pasir Urug M3 120,000.00
7 Tanah M3 75,000.00
8 Batu Belah 15/20 cm M3 175,000.00
9 Semen Portland KG 1,200.00
10 Pasir Pasang M3 125,000.00
11 Pasir Beton M3 125,000.00
12 Koral/Kerikil Beton M3 250,000.00
13 Kayu Terentang M3 1,900,000.00
14 Paku Biasa 2" - 5" KG 20,000.00
15 Minyak Bekisting LTR 10,000.00
16 Besi beton polos KG 10,000.00
17 Kawat Beton KG 25,000.00
18 Kayu Kelas II, Balok M3 4,000,000.00
19 Tripleks 9 mm LBR 135,000.00
20 Dolken BTG 15,000.00
21 Batu Pecah M3 275,000.00
22 Kayu Bekisting M3 1,500,000.00
23 Paku KG 20,000.00
24 Bata Merah 5x11x12 BH 900.00
25 Ubin Keramik 30x30cm BH 10,000.00
26 Semen Warna KG 1,500.00
27 Plamir KG 10,000.00
28 Cat Meni Ltr 25,000.00
29 Kuas Bh 10,000.00
30 Cat Dasar KG 25,000.00
31 Cat Penutup KG 25,000.00
32 Gate Valve 2" BH 400,000.00
33 Seal Tape BH 25,000.00
34 Kayu Kaso 5/7 M3 4,000,000.00
Harga Satuan
No. Uraian SATUAN KET.
(Rp.)
35 Kayu Papan M3 4,000,000.00
36 Kayu Kelas III Balok M3 1,900,000.00
37 Kayu Kelas III Papan M3 1,900,000.00
38 Seng Gelombang BJLS 0,20 LBR 120,000.00
39 Paku Seng KG 35,000.00
40 Pipa PVC dia. 1 1/4" M1 30,000.00
41 Perlengkapan Pipa LS 10,000.00
42 Pipa PVC dia. 2" M1 20,000.00
43 Perlengkapan Pipa PVC dia. 2" LS 12,000.00
44 Pipa PVC dia. 4" M1 73,750.00
45 Pipa PVC dia. 3" M1 48,750.00
46 Pipa PVC dia. 1" M1 12,500.00
Pipa PVC dia. 6" M1 103,600.00
47 Besi baja INP 150.70 Kg 9,000.00
48 Besi Profil L 70.70 Kg 5,000.00
49 Besi Profil L 50.50 Kg 5,000.00
50 Plat Besi 5 mm Kg 10,000.00
51 Kawat las listrik Kg 32,000.00
52 Pipa PE dia. 1/2" M1 8,500.00
53 Pipa PE dia. 1" M1 15,000.00
54 Accesoris pipa LS 350,000.00
C PERALATAN
1 Concrete Vibrator Jam 20,000.00
2 Concrete Mixer Jam 20,000.00
3 Dump Truck Jam 150,000.00
4 Drilling Rigs / Peralatan Bor Jam 750,000.00
5 Alkon Hari 500,000.00
6 Pompa Lumpur Jam 20,000.00
7 Sewa alat perakitan baja Jam 500,000.00
8 Alat Bantu Set 50,000.00
ANALISA HARGA SATUAN
1 m' pengeboran pilot hole dia. 6" kedalaman 0-52m tanah Berbatu
Bahan bakar Bensin 1.56 ltr 8,000.00 12,480.00
minyak pelumas oli 0.00070513 ltr 30,000.00 21.15
mesin / peralatan bor 0.55 Jam 750,000.00 412,500.00
geolistrik 0.2 Oh 140,000.00 28,000.00
ass. Geolistrik 0.2 Oh 120,000.00 24,000.00
driller 0.062 Oh 150,000.00 9,300.00
mekanik 0.062 Oh 120,000.00 7,440.00
mandor 0.1 Oh 120,000.00 12,000.00
juru bor 0.1 Oh 125,000.00 12,500.00
operator 0.1 Oh 150,000.00 15,000.00
pekerja 0.1 Oh 100,000.00 10,000.00
Jumlah 543,241.15
Overhead 10 % 54,324.12
Harga Satuan Pekerjaan 597,565.27
TENAGA
Pekerja Oh -
Tukang besi Oh -
Kepala tukang Oh -
Mandor Oh -
Sewa alat perakitan baja Jam -
Jumlah 23,729,852.00
Overhead 10 % 2,372,985.20
Harga Satuan 26,102,837.20
ENGINERING ESTIMATE
(HPS)
Pekerjaan : Pengeboran Air Bersih
Lokasi : Tampusu
Tahun Anggaran : 2019
REKAPITULASI
I. PEKERJAAN PERSIAPAN 5,500,000.00
II. PEKERJAAN SUMUR BOR KEDALAMAN 60 M 59,184,312.03
III. PEKERJAAN AKHIR 700,000.00
Terbilang : Tujuh Puluh Satu Juta Sembilan Ratus Dua Puluh Ribu Rupiah
Dibuat,
PT. ASRI ABADI KONSULTAN
REKAPITULASI
I. PEKERJAAN PERSIAPAN 4,500,000.00
II. PEKERJAAN SUMUR BOR KEDALAMAN 52 M 50,750,935.38
III. PEKERJAAN SUMUR BOR KEDALAMAN 60 M 36,507,655.88
PEKERJAAN MENARA AIR TINGGI 6 M 48,314,323.48
A Pekerjaan Tanah dan Pondasi 7,746,596.28
B Pekerjaan Menara 26,102,837.20
C Pekerjaan Instalasi Air 14,464,890.00
IV PEKERJAAN AKHIR 500,000.00
Terbilang : Seratus Empat Puluh Delapan Juta Tujuh Ratus Sembilan Belas Ribu Rupiah
………………………………. …………………………..
NIP. …………………………. NIP. ………………………….