Design of Retaining Wall as per ACI 318- 95M 10.0 kn Pw wind load @ 1 m above
P= 10.0 kn
Input Data in cells mkd only Top wall thickness 20 Kn/m2 surcharge
DESIGN DATA Visit 200 mm
Concrete Strength , fc' www.abqconsultants.com
30 MPa Fill : ω 16
Steel Strength , fy 410 MPa θ 30
Soil Bearing Capacity(gross)-SBC 200 Kn/m2
This program Designs and
Unit Weight of Soil / water ω 16 Kn/m3
Angle of repose θ 30 Frontside Backside
Optimises RCC Retaining
Unit Weight of Soil at base ω Kn/m3 Wall - 18
Angle of repose θ type 1. 30 H1

5300
Conc load P 10.0 kn
Wind load Pw @ 1 m above top. 10.0 kn
Unit Weight of Concrete
Total depth of Soil
Written and programmed by 25 Kn/m3 B1
H1 5300 m 1000 Wall thickness at Base.
Depth of Soil H2 :- 1600 m 400 mm
Width of Footing B
A B Quadri 4000 mm

1600
Depth of Footing T 700 mm H2

700
Wall Thickness at Top www.abqconsultants.com
200 mm T
Wall Thickness at Base
Surcharge
abquadri@yahoo.com
400 mm toe Base Soil : ω 18 heel
q 20 Kn/m2 θ 30
Bar Dia. for Footing abquadri@gmail.com
20 mm B= 4000
Bar Diameter for Wall
Width from Front B1
9959010210
12 mm
1000 mm
9959010211
Active Soil Pressure Design
Ka 0.33 Summary W2 W1
Pa1 74.9 Pa2 35.3 Kn Qmax 142
Passive Soil Pressure Qmin 37.19
Kp 1.00 3.0 O.T. o.k.
Pp 23.04 69.12 Kn Slid. o.k.

Checking Overturning W3
Resisting Moment at Toe 2600
Part Weight Arm Moment
( Kn ) (m) ( Kn.m ) W4
W1 191.36 2.70 516.67
W2 23.00 1.30 29.90 2000
W3 11.50 1.13 13.03
W4 70.00 2.00 140.00
Pconc 10.00 1.30 13.00
Sur 52.00 2.70 140.40
Total 357.86 853.01
Overturning Moment at Toe
Pa1 74.91 1.77 132.34 Pa2
Pa2 35.33 2.65 93.63
Pwind 10.00 6.30 63.00
Pp -23.04 0.53 -12.29
Total 97.20 276.68 6 5 Pa1
H1 / 2

Overturning Factor = 3.08 > 1.75 O.K.


Checking Sliding
H1 / 3

Resisting force = 275.73 Kn Pp


Sliding force = 110.24 Kn
Sliding Factor = 2.50 > 1.5 O.K.

Prep By : A B Quadri- Abq Consultants - 9959010210 - em-abquadri@yahoo.com-12-2-826/2 Royal Residency, Besides Amba talkies, Mehdipatnam , Hyderabad-India. 500028-www.abconsultants.com.
Prepared by : Date : Job No. : Sheet :
Cont'd :
Verified by : Date : Revision Notes :

Project :
Subject : Description :

CALCULATION

Soil Pressure At Service Loads


[ Qa = R / B ( 1 + 6 e / B ) ]
Net Mom. around Toe. = 576.32 Kn.m
Resultant Force = 357.86 Kn
Distance from Toe (x) = 1.610 m
Eccentricity (e) = 0.39 m
Qa max (Kn/m2) = 141.74 Kn/m2 142 no
Qa min (Kn/m2) = 37.19 Kn/m2 37 uplift

Toe Analysis and Design c/l of base 390


Qa (ultimate) 241.0 Kn/m2
Vu (ultimate) 241.0 Kn
OK
Vc 485 Kn
Mu (ultimate) 120.5 Kn.m Toe Heel
r % 0.20 1610 e
As required 1250 mm2 x R
Reinforcement 4 Φ 20 2600
16 Φ @ 150 mm /m widtn 4000
Qa min
37 kn/m2
Heel Analysis and Design Q1
Distance(y ) 2.60 m Qa max kn/m2 105
Qa (ultimate) 179 Kn/m2 142 kn/m2
Vu (ultimate) 420 Kn Soil Pressure
OK
Vc 485 Kn
Mu (ultimate) 546 Kn.m
r % 0.41
As reduired 2593 mm2
Reinforcement 9 Φ 20 R/f @
23 Φ @ 150 top

% R.C. Wall Analysis and Design Bar Dia if Const


Spacing if Bardia spacing =
from Mu Thk. r As Reinforcement Vu Vc
Location from top provided by user
top
Kn.m mm % mm2 Kn Kn 150 mm
0.10 @ 0.46 m 18.84 220 0.20 390 4 Φ 12 6.173 151.3 14 @ 394.7 9 @ 150
0.20 @ 0.92 m 28.81 240 0.20 430 4 Φ 12 14.26 166.8 14 @ 358 10 @ 150
0.30 @ 1.38 m 42.62 260 0.23 530.043 5 Φ 12 24.27 182.3 14 @ 290.4 11 @ 150
0.40 @ 1.84 m 61.02 280 0.28 702.153 7 Φ 12 36.2 197.9 14 @ 219.2 12 @ 150
0.50 @ 2.30 m 84.72 300 0.33 908.08 9 Φ 12 50.05 213.4 14 @ 169.5 14 @ 150
0.60 @ 2.76 m 114.45 320 0.39 1149.24 11 Φ 12 65.81 228.9 14 @ 133.9 15 @ 150
0.70 @ 3.22 m 150.94 340 0.45 1426.94 13 Φ 12 83.5 244.4 14 @ 107.9 17 @ 150
0.80 @ 3.68 m 194.92 360 0.52 1742.43 16 Φ 12 103.1 259.9 16 @ 115.4 19 @ 150
0.90 @ 4.14 m 247.11 380 0.59 2096.93 19 Φ 12 124.6 275.5 20 @ 149.8 21 @ 150
1.00 @ 4.60 m 308.24 400 0.66 2491.67 23 Φ 12 148.1 291 24 @ 181.6 22 @ 150
Design at given depth.
0.50 @ 2.30 m 84.72 400 0.20 750 7 Φ 12 50.05 291 22 @ 506.8 12 @ 150

Prep By : A B Quadri- Abq Consultants - 9959010210 - em-abquadri@yahoo.com-12-2-826/2 Royal Residency, Besides Amba talkies, Mehdipatnam , Hyderabad-India. 500028-www.abconsultants.com.

Prepared by : Date : Job No. : Sheet :


Cont'd :
Verified by : Date : Revision Notes :

Project :
Subject : Description :

CALCULATION
200
0.00

9 Ø @ 150 mm c/c 9 Ø @ 150 mm c/c


0.46

10 Ø @ 150 mm c/c 10 Ø @ 150 mm c/c


0.92

10 Ø @ 150 mm c/c 11 Ø @ 150 mm c/c


1.38

10 Ø @ 150 mm c/c 12 Ø @ 150 mm c/c


1.84

11 Ø @ 150 14 Ø @ 150 mm c/c


mm c/c 2.30

11 Ø @ 150 15 Ø @ 150 mm c/c


mm c/c 2.76

11 Ø @ 150 17 Ø @ 150 mm c/c


mm c/c 3.22

12 Ø @ 150 19 Ø @ 150 mm c/c


mm c/c 3.68

12 Ø @ 150 21 Ø @ 150 mm c/c


mm c/c 4.14

12 Ø @ 150 22 Ø @ 150 mm c/c


mm c/c 4.60

23 Ø @ 150 mm c/c
700

16 Ø @ 150 mm c/c

1000 400 2600


4000

Reinforcement Details of Retaining Wall

Prep By : A B Quadri- Abq Consultants - 9959010210 - em-abquadri@yahoo.com-12-2-826/2 Royal Residency, Besides Amba talkies, Mehdipatnam , Hyderabad-India. 500028-www.abconsultants.com.