START
Work Will be
STAKING OUT Executed in Free
Time Periode
RAIL CUTTING
REPLACEMENT
PARTH OF EXISTING
BALLAST
Assembling New
Tun Out
4 day
Work Will be
REPLACEMENT OF EXISTING
Executed in
BALLAST + REMOVE
Window Time
EXISTING TRACK PANEL
Periode
50 Minutes
180 minutes
INSERT BALLAST
TAMPING AND
LINING
90 Minutes
FINISH
Time :
Becuase to remove rail existing, traffic of train in the work erea must be stop, so in this
work using window time.
I.7. Assembling
Before activities of install turn out, so assembling activities to be done 4 days in advance.
Assembling activities including distribution of materials and assembly.
Time :
Because sequence work does not disturb traffic of train so this work only use free time.
Work Plan of Track
II. Schedule And Check List Material for Installation New Turn Out In The Existing Track Panel.
Table II.1 Detailed Resource and Man Power Schedule of Install New Turn Out At Existing Track Panel
Duration (minutes)
No. Activity Remaks
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180
1 Cutting Rail 4 4 4 4 free time
2 Rail Drilling 4 4 4 4 4 4 4 4 4 4 4 4 free time
3 Insstallation Fish Plate 4 4 4 4 free time
4 Replacement of part ballast existing 10 10 6 6 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Free time (1 day)
Total Man Power 14 14 14 14 14 14 14 14 14 14 14 18 18 18 14 10 10 10
Notes:
1. Activity in the table II.1 will be done 4 days before the activities in the table II.2
Table II.2 Detailed Resource and Man Power Schedule of Install New Turn Out At Existing Track Panel
Duration (minutes)
No. Activity Remaks
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180
1 Remove fish Plate 8 8 window time
2 Remove rail Existing 16 16 window time
3 remove PC Sleeper Existing 20 20 window time
4 Remove Balast Existing 20 20 40 window time
5 Install New Turn Out 40 40 40 40 window time
6 Spreading Ballast 30 20 20 20 window time
7 Tamping by HTT 10 10 10 10 10 10 window time
8 MTT 6 6 window time
Total Man Power 8 24 56 40 40 40 40 40 40 30 30 30 30 10 10 10 6 6
Work Plan of Track
Table II.3 Detailed Resource and Man Power Schedule of Assembling Work
Duration (days)
No. Activity Remaks
1 2 3 4
1 Delevary PC Sleeper Turn Out 10 10
2 Delevary Rail turn Out 10 10
3 Install turn Out 20 20 20
Total Man Power 20 40 20 20
Notes:
1. Activity in the table II.3 will be done 4 days before the activities in the table II.2
1 Yamagochi 4 pcs
2 Lifter Turn Out 8 pcs
3 Pen Puler 4 pcs
4 Hammer 4 pcs
5 "Kunci Fish Plate" 4 pcs
6 Matisa 1 pcs
7 Steel Bar 10 pcs
8 Rail Jack 4 pcs
9 Ballast Carier 10 pcs
10 Pioce 10 pcs
11 Genset HTT 2 pcs
12 HTT 8 pcs
Work Plan of Track
Flow Chart
Permanent Partial Disability Accident (PPD)
PPD
Reporting to chief /
secretary P2K3
Handling of accident
administration by
administration
Victim brought
to hospital
Report to Monitoring of
insurance disease and treatment
Insurance
claim
Gift of Healing
insurance process
Accident data
record
Finish
Work Plan of Track
Flow Chart
Accident With Fatality
Accident with
Fatality
Inspection
by Police
Approval
Alt.1 Alt.2
request of victim
Bank statement family
of Police
Brought to
Brought to hospital for
family visum
Obsequies of
corpse and solution
of victim data
Management of
insurance by admi-
nistration of project
Solving of
insurance claim
Accident data
record
Finish
Work Plan of Track