29
2.10
2.41
2.12
3.0
40
44
42
43
44
45
Repaint all directional signs on piping and identification numbers on all the
facilites.
On completion of works, all existing identifications and colour coding on
the facilities should be restored. The contractor shall remove all paper
tapes used on the facilities. Cups and empty containers of paint shall be
removed from site. Clear all waste materials from the site and ensure good
housekeeping
The contractor shall provide any other material or carry out any other
works that will ensure the full completion of this painting works even
though such materials or works were not expressly stated in this scope of
works.
The contractor shall submit a closeout report within two (2) weeks of a
safe and successful completion.
VISITS TO SITE
Before preparing the bid, you are advised to visit and get acquainted with
the environment and factors that may affect your performance. Also
ensure you have full understanding of the scope of works including making
an independent assessment of factor such as community relations that-
may impede early completion
COMMUNITY AFFAIRS, SAFETY, ENVIRONMENT AND SECURITY
Ifyour company’s bid is successful, your company shall be requested to
take necessary steps to:
Protect its personnel, personnel of NGPTC and the general public from
accidents, injuries and other negative health impact while carrying out
the work.
Comply with all statutory regulation on HSE issues by both the Department
of Petroleum Resources (DPR) and Federal Ministry of Environment
(FME) that will be applicable to this work.
Protect the environment (land, water and air) while carrying out this work
and shall remedy and restore any impact on environment to its original
status at the end of work at your cost.
Submit to NGPTC a CASHES plan for the work, including safety
procedure and appoint its own safety personnel to oversee the work. A
meeting shall be held between your company and NGPTC to discuss and
agree on the CASHES plan for the job before mobilization to site.
Engage the host community and manage other community affairs to
ensure timely completion of works at your own cost.