Month 9/4/2016 10/4/2016 11/4/2016 12/4/2016 1/4/2017 2/4/2017 3/4/2017 4/4/2017 5/4/2017 6/4/2017 6/25/2017

% Schedule 0.00% 8.00% 18.00% 30.00% 51.00% 68.00% 75.00% 85.00% 90.00% 95.00% 100.00%
% on site 0.00% 7.00%