1).

Practical check the earthing of every equipment & generate Earthing Testing Report on Monthly
basis.( Require Earthing TEST meter)
2). Lux level Testing Report on Monthly Basis.(Require LUX Meter)
3). RCCB Testing Report (Test result,Tripping time & working proper). (Require Multi Frequency Meter)
4). Electrical Rescue Plan
5). LOTO system tie with Permit System.
6). Single line diagram of DB Panels.
7). Uptodate Maintainance register of DG , Panels , electrical rooms.
8). Locking system of DB panels and electrical room.
9). Proper housekeeping at electrical rooms.
10). Display of Emergency contact numbers .
11). Total site Electrical layout diagram.