1 2 3 4 5 6 7 8 9 10 11 12 13

55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1575 3425
3425 1575

EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1


W-1 W-1 W-1 R
W-1 W-1 W-1 W-1 W-1 W-1 W-1
W-3 W-4 W-4 W-3

C
IWF-1 IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
4 STO. HE IWF-1
IWF-2
3150

3150
A-6 IWF-1 IWF-1
FL-3
BD-1 BD-1 D-3a BD-1 BD-1
IWF-2 SHE IWF-1 IWF-1 IWF-1 IWF-1 IWF-2
FL-3 D-2 D-2
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING EWF-1 EWF-1 FL-1 FL-1 FL-1 FL-1 FL-1 EWF-1 EWF-1
LANDING
EWF-1 R R EWF-1 EWF-1
EWF-1
EWF-1 EWF-1
9500

9500
3850

3850
IWF-1 IWF-1 IWF-1 IWF-1 IWF-1

D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
EWF-1a D-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 EWF-1a
D-2
2500

2500
W-2 C O R R I D O R C O R R I D O R C O R R I D O R
EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1
R FL-2 FL-2 FL-2
FD FD FD FD FD ELEV. 3450.00 mm FD FD FD FD FD FD FD FD
A
R

EWF-1a EWF-1a
EWF-1a R
EWF-1a
EWF-1a

3
A-6
2 SECOND FLOOR PLAN
SCALE 1: 100 M.
A-2
LEGEND: SCHEDULE OF FLOOR FINISHES : SCHEDULE OF WALL FINISHES :
NOTE: R
REVISION OF DRAWING DETAILS (1/23/2018)
MARK WALL DESCRIPTION MARK WALL DESCRIPTION
- REVISION OF CORRIDOR RAILING AT GROUND FLOOR
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL (FROM 150 mm THK. CHB RAILING TO REINFORCED 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT CONCRETE BENCH) ADAPTING THE PROPOSED DEPED PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
FL - 1 EWF - 1 PAINTED FINISH
DESIGN. (PROVIDE 6mm GROOVES @ 1000 mm O.C. BOTH WAYS)
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE - REVISION OF CORRIDOR RAILING AT SECOND AND
(SUBMIT COLOR SCHEMES FOR APPROVAL)
USED AS ALTERNATE ROOFING MATERIALS). THIRD FLOOR ADAPTING THE PROPOSED DEPED DESIGN. PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3) FL - 2 FOR FL- 2a - PLAIN CEMENT FLOOR FINISH WITH INTEGRAL
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. EWF - 1a PLASTER PAINTED FINISH
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.
MEMBRANE WATER PROOFING (SUBMIT COLOR SCHEMES FOR APPROVAL)
- ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN
ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED
DESIGN 100 mm THK. RC PARAPET WITH PLAIN CEMENT PLASTER PAINTED
FL - 3 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR FINISH R EWF - 2 FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF HE AND SHE TOILET LAYOUT AT GROUND AND
SECOND FLOOR ADAPTING THE LAYOUT OF MODIFIED
STANDARD THREE (3) AND FOUR (4) STOREY SCHOOL BUILDING
100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
- REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK. FL - 4 NON - SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINES IWF - 1 PLASTER PAINTED FINISH
CHB TO 100 mm THK. REINFORCED CONCRETE
(SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF TOILET'S WALL & FLOOR FINISHES
- (IWF-2) FROM 200 X 200mm VIT. GLAZED WALL TILES FINISH 200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
TO 300 X 300mm VIT. GLAZED WALL TILES FINISH IWF - 2 (SIZE & OR COLOR FOR APPROVAL BY THE END-USER) R
- (FL-3) FROM 200 X 200 mm VIT. UNGLAZED TILES FLOOR FINISH
TO 300 X 300mm VIT. UNGLAZED TILES FLOOR FINISH - TYPICAL ON ALL TOILET WALLS

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3125 1875 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1875 3125

1050 400 400 1050


EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1

IWF-2 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-4 W-3 IWF-2
W-3 W-4
C
IWF-2 IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
1 PWD PWD
IWF-2
3150

3150
A-6 IWF-1
BD-1 BD-1 D-3 D-3
HE BD-1
SHE IWF-1 IWF-1 IWF-1 IWF-1 FL-3
HANDWASHING

HANDWASHING
FL-3 D-2
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

EWF-1
LANDING FL-1 FL-1 FL-1 FL-1 FL-1 EWF-1 LANDING EWF-1
EWF-1
EWF-1 R R

EWF-1
9500

9500
3850

3850
IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
HANDWASHING

HANDWASHING
EWF-1

R
STO. STO.
D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
D-3a W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 D-3a
EWF-1 EWF-1
2500

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP
EWF-1 EWF-1 EWF-1
R FL-2 ELEV. 300.00 mm FL-2 FL-2

A 300
1200

1200
SLOPE 1:12 UP UP SLOPE 1:12
RAMP UP REINFORCED CONCRETE BENCH WITH PLAIN RAMP UP EWF-1
150 mm THK. CHB EXTERIOR WALL RAILING (BELOW R.C. BENCH) ELEV. 0.00 mm
LINE OF CANOPY ABOVE CEMENT PLASTER PAINTED FINISH
AT 600 mm HIGH WITH PLAIN CEMENT PLASTER PAINTED
FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL) 9000
(1 @ 900 mm, 1@ 700 mm
9550 HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C
1500 3600 3600 1500
- TYPICAL TO OTHER SIDE 1 GROUND FLOOR PLAN (OPTION - 1) SIDE ( SEE DETAIL)
SCALE 1: 100 M.
4 A-2
A-6

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR PLAN
MODIFIED STANDARD DPWH - DEPED SECOND FLOOR PLAN CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM FLOOR FINISH SCHEDULE LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A-2
BUILDINGS DIVISION WALL FINISH SCHEDULE JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH

You might also like