Professional Documents
Culture Documents
Operator Stimulates Screened Offshore System 3 Years After Installation
Operator Stimulates Screened Offshore System 3 Years After Installation
Challenge
The operator wanted a system that was compartmentalized to provide flexibility for either
shutting-off or stimulating zones in the future. The system also required screens to
minimize the flowback of solids from the reservoir during production.
Solution
Packers Plus developed a bespoke 5-stage solution to deliver the desired screened
production. The customized system included ScreenPORT sleeves in con junction with field-
proven StackFRAC® HD tools, such as RockSEAL® II dual-element mechanical packers and
DC FracPORT™ sleeves.
One key adjustment was removing the ball seats from the DC FracPORT sleeves before
installation to allow the operator to open and close sleeves without having to mill out the
seats.
Results
The 5-stage system was installed into the offshore well, which had a measured depth of
2,639 m (8,660 ft) and a total vertical depth of 1,867 m (6,125 ft). All the ScreenPORT
sleeves were opened to filter production. As production gradually declined due to the low
permeability of the reservoir, the operator decided to stimulate the well. Packers Plus
collaborated with the operator to develop a plan to stimulate stage 4 only.
A Packers Plus Drillable Closeable Hydraulic (DCH) Shifting Tool was used to close all 5
ScreenPORT sleeves. After opening the stage 4 DC FracPORT sleeve, a proppant stimulation
was delivered. All remaining DC FracPORT sleeves were opened, and the well was put on
production. Packers Plus provided a high quality completion solution that gave the
operator the flexibility to successfully stimulate the wellbore, 3 years after being installed
in an offshore reservoir.