Monsoon Plan ELECTRICAL • All Electrical Panels and DBs, Rectifiers should be under shed. • All cables must run above ground if possible avoid joints. • Always use Industrial Plug tops and good insulated cables. • Always ensure double earthing for all electrical equipment. Armored cables with proper glanding at both ends. • Always take all power supply through ELCB / RCCB 30 mA only. • Electrical jobs must be done by Licensed Electricians only. Connection from bottoms of DBs. • Never work on Electrical jobs with wet Clothes and PPEs. Use only insulated and dry tools. • Electricians must use 11KV tested Electrical Safety Shoes. .WORKING PROCEDURES • No work must be carried out during rain and heavy wind at open height. • Use of full body harness with rigid anchoring arrangement is must. • Always ensure that the plank is secured and dry. • No heavy lifting and shifting activity should be done during rain & heavy wind. • All welding and electrical work must be carried out only on dry surface under the shed. • All excavated areas must be properly barricaded with hard railings. • All excavation must be done either slope cutting or benching. • Execute only after complete de-watering is done. • No materials should be stacked close to the excavated pits. • Safe access & egress must be provided to all excavation and height works. • Never leave loose lubricants (Oils, Grease, Chemicals) on the ground. 30 mA