You are on page 1of 11

UNIVERSAL TESTING LABORATORY

AND INSPECTION, INC.


147 Pasig Boulevard
Pasig City, Metro Manila, Philippines

Client: SHIMIZU PHILIPPINES CONTRACTORS, INC.


Project: Funai Philippines Factory Project
Location: Malvar - Lipa City, Batangas
Date Tested: October 4, 2013
Tested By: K. L. F. Perez / P. Maglangit
Dead Weight of Equipment: 0.50624 kN Plate Diameter: 12 inches Ø
2
Calibration: 2.41 % Area: 0.0730 m

Test Location: No.1 (GL-9/E)


Elevation: -1.50m. from gorund level

PLATE LOAD BEARING TEST REPORT

Displacement (Per Division) Displacement(Millimeter) Average Pressure


Load(kN) Adjusted Load time
Strain A Strain B Strain C Strain A Strain B Strain C (mm) (kPa)

5 5.6267 9:45 AM 0 0 25 0 0 0.25 0.0833 77.11

10 10.7472 10:00 AM 14 45 58 0.14 0.45 0.58 0.3900 147.29

15 15.8677 10:15 AM 42 90 82 0.42 0.90 0.82 0.7133 217.47

20 20.9882 10:30 AM 62 120 102 0.62 1.20 1.02 0.9467 287.64

25 26.1087 10:45 AM 102 171 132 1.02 1.71 1.32 1.3500 357.82

30 31.2292 11:00 AM 134 210 154 1.3 2.10 1.54 1.6600 428.00

35 36.3497 11:15 AM 167 243 172 1.67 2.43 1.72 1.9400 498.17

40 41.4702 11:30 AM 195 269 187 1.95 2.69 1.87 2.1700 568.35

45 46.5907 11:45 AM 229 299 207 2.29 2.99 2.07 2.4500 638.53

50 51.7112 12:00 PM 264 328 224 2.64 3.28 2.24 2.7200 708.70

55 56.8317 12:15 PM 306 361 243 3.06 3.61 2.43 3.0333 778.88

60 61.9522 12:30 PM 345 394 264 3.45 3.94 2.64 3.3433 849.06

65 67.0727 12:45 PM 382 424 285 3.82 4.24 2.85 3.6367 919.23

70 72.1932 1:00 PM 432 466 316 4.32 4.66 3.16 4.0467 989.41

75 77.3137 1:15 PM 485 512 352 4.85 5.12 3.52 4.4967 1059.59

80 82.4342 1:30 PM 529 551 384 5.29 5.51 3.84 4.8800 1129.76

0 0.5062 2:15 PM 444 452 305 4.44 4.52 3.05 4.0033 6.94

Plot of Pressure vs Settlement


Load
0 100 200 300 400 500 600 700 800 900
0.00

0.50

1.00

1.50
Settlement

2.00

2.50

3.00

3.50

4.00

Tested By: Checked By: Certified by:

K. L. Perez R. B. Dela Cruz D. B. Santos


Sr. Lab. Technician Geotechnical Engineer Manager
UNIVERSAL TESTING LABORATORY
AND INSPECTION, INC.
147 Pasig Boulevard
Pasig City, Metro Manila, Philippines

Client: SHIMIZU PHILIPPINES CONTRACTORS, INC.


Project: Funai Philippines Factory Project
Location: Malvar - Lipa City, Batangas
Date Tested: October 5, 2013
Tested By: K. L. F. Perez / P. Maglangit
Dead Weight of Equipment: 0.69425 kN Plate Diameter: 12 inches Ø
2
Calibration: 2.41 % Area: 0.0730 m

Test Location: No.2 (GL-6/A)


Elevation: -1.50m. from gorund level

PLATE LOAD BEARING TEST REPORT

Displacement (Per Division) Displacement(Millimeter) Average Pressure


Load(kN) Adjusted Load time
Strain A Strain B Strain C Strain A Strain B Strain C (mm) (kPa)

5 5.8148 12:15 PM 10 9 11 0.10 0.09 0.11 0.1000 79.69

10 10.9353 12:30 PM 28 21 28 0.28 0.21 0.28 0.2567 149.87

15 16.0558 12:45 PM 44 32 39 0.44 0.32 0.39 0.3833 220.04

20 21.1763 1:00 PM 59 42 48 0.59 0.42 0.48 0.4967 290.22

25 26.2968 1:15 PM 79 56 59 0.79 0.56 0.59 0.6467 360.40

30 31.4173 1:30 PM 107 77 74 1.1 0.77 0.74 0.8600 430.57

35 36.5378 1:45 PM 132 95 87 1.32 0.95 0.87 1.0467 500.75

40 41.6583 2:00 PM 165 121 108 1.65 1.21 1.08 1.3133 570.93

45 46.7788 2:15 PM 208 161 141 2.08 1.61 1.41 1.7000 641.10

50 51.8993 2:30 PM 255 210 181 2.55 2.10 1.81 2.1533 711.28

55 57.0198 2:45 PM 303 264 223 3.03 2.64 2.23 2.6333 781.46

60 62.1403 3:00 PM 359 324 273 3.59 3.24 2.73 3.1867 851.63

65 67.2608 3:15 PM 423 393 331 4.23 3.93 3.31 3.8233 921.81

70 72.3813 3:30 PM 509 482 414 5.09 4.82 4.14 4.6833 991.99

75 77.5018 3:45 PM 609 582 515 6.09 5.82 5.15 5.6867 1062.16

80 82.6223 4:00 PM 687 657 591 6.87 6.57 5.91 6.4500 1132.34

0 0.6943 4:45 PM 501 478 503 5.01 4.78 5.03 4.9400 9.51

Plot of Pressure vs Settlement


Load
0 100 200 300 400 500 600 700 800 900
0.00

0.50

1.00
Settlement

1.50

2.00

2.50

3.00

3.50

Tested By: Checked By: Certified by:

K. L. Perez R. B. Dela Cruz D. B. Santos


Sr. Lab. Technician Geotechnical Engineer Manager
UNIVERSAL TESTING LABORATORY
AND INSPECTION, INC.
147 Pasig Boulevard
Pasig City, Metro Manila, Philippines

Client: SHIMIZU PHILIPPINES CONTRACTORS, INC.


Project: Funai Philippines Factory Project
Location: Malvar - Lipa City, Batangas
Date Tested: October 5, 2013
Tested By: K. L. F. Perez / P. Maglangit
Dead Weight of Equipment: 0.43133 kN Plate Diameter: 12 inches Ø
2
Calibration: 2.41 % Area: 0.0730 m

Test Location: No.3 (GL-2/D)


Elevation: -1.50m. from gorund level

PLATE LOAD BEARING TEST REPORT

Displacement (Per Division) Displacement(Millimeter) Average Pressure


Load(kN) Adjusted Load time
Strain A Strain B Strain C Strain A Strain B Strain C (mm) (kPa)

5 5.5518 9:15 PM 46 70 42 0.46 0.70 0.42 0.5267 76.09

10 10.6723 9:30 PM 87 141 88 0.87 1.41 0.88 1.0533 146.26

15 15.7928 9:45 PM 115 178 114 1.15 1.78 1.14 1.3567 216.44

20 20.9133 10:00 PM 155 231 150 1.55 2.31 1.50 1.7867 286.62

25 26.0338 10:15 PM 198 270 181 1.98 2.70 1.81 2.1633 356.79

30 31.1543 10:30 PM 237 304 216 2.4 3.04 2.16 2.5233 426.97

35 36.2748 10:45 PM 277 341 255 2.77 3.41 2.55 2.9100 497.15

40 41.3953 11:00 PM 315 370 286 3.15 3.70 2.86 3.2367 567.32

45 46.5158 11:15 PM 364 414 335 3.64 4.14 3.35 3.7100 637.50

50 51.6363 11:30 PM 474 505 431 4.74 5.05 4.31 4.7000 707.68

55 56.7568 11:45 PM 597 617 544 5.97 6.17 5.44 5.8600 777.85

60 61.8773 12:00 AM 659 673 604 6.59 6.73 6.04 6.4533 848.03

65 66.9978 12:15 AM 1215 1119 1053 12.15 11.19 10.53 11.2900 918.21

70 72.1183 12:30 AM 1358 1268 1124 13.58 12.68 11.24 12.5000 988.38

75 77.2388 12:31 AM 1608 1609 1595 16.08 16.09 15.95 16.0400 1058.56

0 0.4313 1:16 AM 1399 1493 1468 13.99 14.93 14.68 14.5333 5.91

Plot of Pressure vs Settlement


Load
0 100 200 300 400 500 600 700 800 900
0.00

1.00

2.00
Settlement

3.00

4.00

5.00

6.00

7.00

Tested By: Checked By: Certified by:

K. L. Perez R. B. Dela Cruz D. B. Santos


Sr. Lab. Technician Geotechnical Engineer Manager
UNIVERSAL TESTING LABORATORY
AND INSPECTION, INC.
147 Pasig Boulevard
Pasig City, Metro Manila, Philippines

Client: SHIMIZU PHILIPPINES CONTRACTORS, INC.


Project: Funai Philippines Factory Project
Location: Malvar - Lipa City, Batangas
Date Tested: October 7, 2013
Tested By: K. L. F. Perez / P. Maglangit
Dead Weight of Equipment: 0.42521 kN Plate Diameter: 12 inches Ø
2
Calibration: 2.41 % Area: 0.0730 m

Test Location: No.4 (GL-3'-4/E-E')


Elevation: Ground Level

PLATE LOAD BEARING TEST REPORT

Displacement (Per Division) Displacement(Millimeter) Average Pressure


Load(kN) Adjusted Load time
Strain A Strain B Strain C Strain A Strain B Strain C (mm) (kPa)

5 5.5457 11:15 AM 25 20 15 0.25 0.20 0.15 0.2000 76.00

10 10.6662 11:30 AM 55 42 54 0.55 0.42 0.54 0.5033 146.18

15 15.7867 11:45 AM 92 68 109 0.92 0.68 1.09 0.8967 216.36

20 20.9072 12:00 PM 143 101 181 1.43 1.01 1.81 1.4167 286.53

0 0.4252 12:45 PM 85 40 89 0.85 0.40 0.89 0.7133 5.83

Plot of Pressure vs Settlement


Load
0 50 100 150 200 250 300 350
0.00

0.20

0.40

0.60
Settlement

0.80

1.00

1.20

1.40

1.60

Tested By: Checked By: Certified by:

K. L. Perez R. B. Dela Cruz D. B. Santos


Sr. Lab. Technician Geotechnical Engineer Manager
UNIVERSAL TESTING LABORATORY
AND INSPECTION, INC.
147 Pasig Boulevard
Pasig City, Metro Manila, Philippines

Client: SHIMIZU PHILIPPINES CONTRACTORS, INC.


Project: Funai Philippines Factory Project
Location: Malvar - Lipa City, Batangas
Date Tested: October 7, 2013
Tested By: K. L. F. Perez / P. Maglangit
Dead Weight of Equipment: 0.46574 kN Plate Diameter: 12 inches Ø
2
Calibration: 2.41 % Area: 0.0730 m

Test Location: No.5 (GL-8'-9/D'-E)


Elevation: Ground Level

PLATE LOAD BEARING TEST REPORT

Displacement (Per Division) Displacement(Millimeter) Average Pressure


Load(kN) Adjusted Load time
Strain A Strain B Strain C Strain A Strain B Strain C (mm) (kPa)

5 5.5862 2:15 PM 19 0 0 0.19 0.00 0.00 0.0633 76.56

10 10.7067 2:30 PM 44 1 13 0.44 0.01 0.13 0.1933 146.74

15 15.8272 2:45 PM 61 11 20 0.61 0.11 0.20 0.3067 216.91

20 20.9477 3:00 PM 84 30 39 0.84 0.30 0.39 0.5100 287.09

0 0.4657 12:45 PM 54 11 13 0.54 0.11 0.13 0.2600 6.38

Plot of Pressure vs Settlement


Load
0 50 100 150 200 250 300 350
0.00

0.10

0.20
Settlement

0.30

0.40

0.50

0.60

Tested By: Checked By: Certified by:

K. L. Perez R. B. Dela Cruz D. B. Santos


Sr. Lab. Technician Geotechnical Engineer Manager
UNIVERSAL TESTING LABORATORY
AND INSPECTION, INC.
147 Pasig Boulevard
Pasig City, Metro Manila, Philippines

Client: SHIMIZU PHILIPPINES CONTRACTORS, INC.


Project: Funai Philippines Factory Project
Location: Malvar - Lipa City, Batangas
Date Tested: October 7, 2013
Tested By: K. L. F. Perez / P. Maglangit
Dead Weight of Equipment: 0.92045 kN Plate Diameter: 12 inches Ø
2
Calibration: 2.41 % Area: 0.0730 m

Test Location: No.6 (GL-14'-15/F'-G)


Elevation: Ground Level

PLATE LOAD BEARING TEST REPORT

Displacement (Per Division) Displacement(Millimeter) Average Pressure


Load(kN) Adjusted Load time
Strain A Strain B Strain C Strain A Strain B Strain C (mm) (kPa)

5 6.0410 4:45 PM 11 2 11 0.11 0.02 0.11 0.0800 82.79

10 11.1615 5:00 PM 21 6 29 0.21 0.06 0.29 0.1867 152.97

15 16.2820 5:15 PM 41 18 38 0.41 0.18 0.38 0.3233 223.14

20 21.4025 5:30 PM 62 32 55 0.62 0.32 0.55 0.4967 293.32

0 0.9205 6:15 PM 45 31 24 0.45 0.31 0.24 0.3333 12.61

Plot of Pressure vs Settlement


Load
0 50 100 150 200 250 300 350
0.00

0.10

0.20
Settlement

0.30

0.40

0.50

0.60

Tested By: Checked By: Certified by:

K. L. Perez R. B. Dela Cruz D. B. Santos


Sr. Lab. Technician Geotechnical Engineer Manager
UNIVERSAL TESTING LABORATORY
AND INSPECTION, INC.
147 Pasig Boulevard
Pasig City, Metro Manila, Philippines

Client: SHIMIZU PHILIPPINES CONTRACTORS, INC.


Project: Funai Philippines Factory Project
Location: Malvar - Lipa City, Batangas
Date Tested: October 7, 2013
Tested By: K. L. F. Perez / P. Maglangit
Dead Weight of Equipment: 1.02120 kN Plate Diameter: 12 inches Ø
2
Calibration: 2.41 % Area: 0.0730 m

Test Location: No.7 (GL-14'-15/B'-C)


Elevation: Ground Level

PLATE LOAD BEARING TEST REPORT

Displacement (Per Division) Displacement(Millimeter) Average Pressure


Load(kN) Adjusted Load time
Strain A Strain B Strain C Strain A Strain B Strain C (mm) (kPa)

5 6.1417 8:00 PM 23 20 25 0.23 0.20 0.25 0.2267 84.17

10 11.2622 8:15 PM 56 49 55 0.56 0.49 0.55 0.5333 154.35

15 16.3827 8:30 PM 136 121 138 1.36 1.21 1.38 1.3167 224.53

20 21.5032 8:45 PM 159 149 163 1.59 1.49 1.63 1.5700 294.70

0 1.0212 6:15 PM 99 104 118 0.99 1.04 1.18 1.0700 14.00

Plot of Pressure vs Settlement


Load
0 50 100 150 200 250 300 350
0.00

0.20

0.40

0.60
Settlement

0.80

1.00

1.20

1.40

1.60

1.80

Tested By: Checked By: Certified by:

K. L. Perez R. B. Dela Cruz D. B. Santos


Sr. Lab. Technician Geotechnical Engineer Manager
UNIVERSAL TESTING LABORATORY
AND INSPECTION, INC.
147 Pasig Boulevard
Pasig City, Metro Manila, Philippines

Client: SHIMIZU PHILIPPINES CONTRACTORS, INC.


Project: Funai Philippines Factory Project
Location: Malvar - Lipa City, Batangas
Date Tested: October 7, 2013
Tested By: K. L. F. Perez / P. Maglangit
Dead Weight of Equipment: 0.63114 kN Plate Diameter: 12 inches Ø
2
Calibration: 2.41 % Area: 0.0730 m

Test Location: No.8 (GL-3'-4/B-C)


Elevation: Ground Level

PLATE LOAD BEARING TEST REPORT

Displacement (Per Division) Displacement(Millimeter) Average Pressure


Load(kN) Adjusted Load time
Strain A Strain B Strain C Strain A Strain B Strain C (mm) (kPa)

5 5.7516 10:45 PM 11 5 1 0.11 0.05 0.01 0.0567 78.83

10 10.8721 11:00 PM 33 59 54 0.33 0.59 0.54 0.4867 149.00

15 15.9926 11:15 PM 67 106 98 0.67 1.06 0.98 0.9033 219.18

20 21.1131 11:30 PM 101 151 142 1.01 1.51 1.42 1.3133 289.36

0 0.6311 12:15 AM 44 67 70 0.44 0.67 0.70 0.6033 8.65

Plot of Pressure vs Settlement


Load
0 50 100 150 200 250 300 350
0.00

0.20

0.40
Settlement

0.60

0.80

1.00

1.20

1.40

Tested By: Checked By: Certified by:

K. L. Perez R. B. Dela Cruz D. B. Santos


Sr. Lab. Technician Geotechnical Engineer Manager
UNIVERSAL TESTING LABORATORY
AND INSPECTION, INC.
147 Pasig Boulevard
Pasig City, Metro Manila, Philippines

Client: SHIMIZU PHILIPPINES CONTRACTORS, INC.


Project: Funai Philippines Factory Project
Location: Malvar - Lipa City, Batangas
Date Tested: October 8, 2013
Tested By: K. L. F. Perez / P. Maglangit
Dead Weight of Equipment: 0.57090 kN Plate Diameter: 12 inches Ø
2
Calibration: 2.41 % Area: 0.0730 m

Test Location: No.9 (GL-8'-9/A'-B)


Elevation: Ground Level

PLATE LOAD BEARING TEST REPORT

Displacement (Per Division) Displacement(Millimeter) Average Pressure


Load(kN) Adjusted Load time
Strain A Strain B Strain C Strain A Strain B Strain C (mm) (kPa)

5 5.6914 10:45 PM 134 138 146 1.34 1.38 1.46 1.3933 78.00

10 10.8119 11:00 PM 241 294 315 2.41 2.94 3.15 2.8333 148.18

15 15.9324 11:15 PM 431 471 477 4.31 4.71 4.77 4.5967 218.35

0 0.5709 12:15 AM 132 74 122 1.32 0.74 1.22 1.0933 7.82

Plot of Pressure vs Settlement


Load
0 50 100 150 200 250
0.00
0.50
1.00
1.50
2.00
Settlement

2.50
3.00
3.50
4.00
4.50
5.00

Tested By: Checked By: Certified by:

K. L. Perez R. B. Dela Cruz D. B. Santos


Sr. Lab. Technician Geotechnical Engineer Manager
UNIVERSAL TESTING LABORATORY
AND INSPECTION, INC.
147 Pasig Boulevard
Pasig City, Metro Manila, Philippines

Client: SHIMIZU PHILIPPINES CONTRACTORS, INC.


Project: Funai Philippines Factory Project
Location: Malvar - Lipa City, Batangas
Date Tested: October 8, 2013
Tested By: K. L. F. Perez / P. Maglangit
Dead Weight of Equipment: 1.17438 kN Plate Diameter: 12 inches Ø
2
Calibration: 2.41 % Area: 0.0730 m

Test Location: No.10 (GL-2/B-C)


Elevation: -4.0m. from gorund level

PLATE LOAD BEARING TEST REPORT

Displacement (Per Division) Displacement(Millimeter) Average Pressure


Load(kN) Adjusted Load time
Strain A Strain B Strain C Strain A Strain B Strain C (mm) (kPa)

5 6.2949 5:45 PM 158 140 173 1.58 1.40 1.73 1.5700 86.27

10 11.4154 6:00 PM 572 515 581 5.72 5.15 5.81 5.5600 156.45

15 16.5359 6:15 PM 1752 1782 1772 17.52 17.82 17.72 17.6867 226.62

20 21.6564 6:16 PM 2761 2785 2691 27.61 27.85 26.91 27.4567 296.80

0 1.1744 7:01 PM 2734 2757 2595 27.34 27.57 25.95 26.9533 16.09

Plot of Pressure vs Settlement


Load
0 50 100 150 200 250 300 350
0.00

5.00

10.00
Settlement

15.00

20.00

25.00

30.00

Tested By: Checked By: Certified by:

K. L. Perez R. B. Dela Cruz D. B. Santos


Sr. Lab. Technician Geotechnical Engineer Manager
UNIVERSAL TESTING LABORATORY
AND INSPECTION, INC.
147 Pasig Boulevard
Pasig City, Metro Manila, Philippines

Client: SHIMIZU PHILIPPINES CONTRACTORS, INC.


Project: Funai Philippines Factory Project
Location: Malvar - Lipa City, Batangas
Date Tested: October 10, 2013
Tested By: K. L. F. Perez / P. Maglangit
Dead Weight of Equipment: 0.67304 kN Plate Diameter: 12 inches Ø
2
Calibration: 2.41 % Area: 0.0730 m

Test Location: No.11 (GL-2/G)


Elevation: -1.50m. from gorund level

PLATE LOAD BEARING TEST REPORT

Displacement (Per Division) Displacement(Millimeter) Average Pressure


Load(kN) Adjusted Load time
Strain A Strain B Strain C Strain A Strain B Strain C (mm) (kPa)

5 5.7935 2:00 PM 13 15 9 0.13 0 0.09 0.1233 79.40

10 10.9140 2:15 PM 21 24 13 0.21 0.24 0.13 0.1933 149.58

15 16.0345 2:30 PM 30 31 18 0.3 0.31 0.18 0.2633 219.75

20 21.1550 2:45 PM 38 38 22 0.38 0.38 0.22 0.3267 289.93

25 26.2755 3:00 PM 50 47 28 0.5 0.47 0.28 0.4167 360.11

30 31.3960 3:15 PM 61 55 34 0.6 0.55 0.34 0.5000 430.28

35 36.5165 3:30 PM 74 63 40 0.74 0.63 0.40 0.5900 500.46

40 41.6370 3:45 PM 85 72 46 0.85 0.72 0.46 0.6767 570.64

45 46.7575 4:00 PM 104 89 53 1.04 0.89 0.53 0.8200 640.81

50 51.8780 4:15 PM 129 107 61 1.29 1.07 0.61 0.9900 710.99

55 56.9985 4:30 PM 161 130 74 1.61 1.30 0.74 1.2167 781.17

60 62.1190 4:45 PM 201 163 92 2.01 1.63 0.92 1.5200 851.34

65 67.2395 5:00 PM 244 198 111 2.44 1.98 1.11 1.8433 921.52

70 72.3600 5:15 PM 290 240 136 2.90 2.40 1.36 2.2200 991.70

75 77.4805 5:30 PM 334 279 162 3.34 2.79 1.62 2.5833 1061.87

80 82.6010 5:45 PM 393 335 199 3.93 3.35 1.99 3.0900 1132.05

0 0.6730 6:30 PM 247 216 117 2.47 2.16 1.17 1.9333 9.22

Plot of Pressure vs Settlement


Load
0 100 200 300 400 500 600 700 800 900
0.00

0.20

0.40

0.60
Settlement

0.80

1.00

1.20

1.40

1.60

Tested By: Checked By: Certified by:

K. L. Perez R. B. Dela Cruz D. B. Santos


Sr. Lab. Technician Geotechnical Engineer Manager