BITUMEN

DECANTERS

Two models: 5-6 tph and 7-8 tph


Batch time: 60-70 minutes
Number of drums in a batch: 32 / 44
Capacity per batch: 6400 liters / 8800 liters atlastechnologiesindia.com
Storage: 16-17 tons / 19-20 tons
www.atlastechnologiesindia.com

LOADING OF
BARRELS
There is facility to load upto 32 / 44 barrels at a time in the slider
provided. Upon loading of the inverted barrels, the slider will take
the barrels inside the heating unit.
INVERTED
BARRELS
The barrels are inverted as shown in the picture before
the barrel heater takes them into the chamber for
melting.

www.atlastechnologiesindia.com

HEATING
PROCESS
Once the barrels are innside, they are heated by hot gas inside the
fully enclosed chamber. In 60-70 minutes, bitumen from the drums
would have melted and collected below.

The chamber is fully iinsulated by glasswool from all sides for


maximum thermal efficiency and fuel saving.

After heating, the drums have to be replaced for another batch.


www.atlastechnologiesindia.com

HOT OIL HEATER &


CONTROL PANEL
Hot oil heater is a strong unit which keeps the stored bitumen below in
liquid condition. Indirect heating system prevents degradation of bitumen
and is better compared to direct heating system.

Control panel allows easy and fast operation.


ATLAS TECHNOLOGIES PVT. LTD.
Block No. 97, Mehsana-Ahmedabad Highway, Behind Bhupendra Crane House, At & Po. Ditasan – 382710. Gujarat. India.

Factory: +91 90993 14000


Factory: +91 90994 14000

For export Inquiries : +91 97238 10565


For domestic Inquiries: +91 98240 40565

You might also like