Initial Setup Parts Inspection Procedure

The document outlines a working procedure for initial setup and trial parts. It instructs workers to visually inspect parts for defects, and if ok, confirm and proceed to the next operation. Parts found not ok during inspection are sent to a yellow bin for analysis. Parts determined not reworkable from analysis go to the red bin, while reworkable parts are sent to the rework station to follow instructions before another inspection. Non-conforming parts after rework are disposed of with a scrap note.

Uploaded by

kdfdfyb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views2 pages

Initial Setup Parts Inspection Procedure

The document outlines a working procedure for initial setup and trial parts. It instructs workers to visually inspect parts for defects, and if ok, confirm and proceed to the next operation. Parts found not ok during inspection are sent to a yellow bin for analysis. Parts determined not reworkable from analysis go to the red bin, while reworkable parts are sent to the rework station to follow instructions before another inspection. Non-conforming parts after rework are disposed of with a scrap note.

Uploaded by

kdfdfyb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

WORKING PROCEDURE FOR INITIAL SETUP PARTS / TRIAL PARTS

1.पपरर कक aÉåeÉ xÉå AÉæU VISUALLY TRIAL


सहह तरहकक सक चचक करक!

2. kÄrÉÉlÉ UWåû ÌMü AaÉU


mÉÉOïû REJECT Wãû iÉÉã OK IF OK
CONFIRMED
mÉÉOïû Måü xÉÉjÉ MIX lÉ WûÉå ! NEXT
INSPECTION OPERATIO
N

IF NOT OK

YELLOW

BIN

YELLOW BIN
ANALYSIS
IF NOT REWORKABLE

IF REWORKABLE RED

GO TO BIN
REWORK RESPONSIBILITY:-
STATION 1.CFT
2. ENGINEER
AND (NPD)
FOLLOW MAKE SCRAP NOTE &
REWORK DISPOSE
INSTRUCTIO
NS F/DEV/06
GO TO
REWORK
STATION
AND
FOLLOW
REWORK
INSTRUCTIO
NS
SCRAP YARD

PREPARED BY: APPROVRD BY:

F/DEV/06