Professional Documents
Culture Documents
PROYECTO NO.1
Actividad Imicio Durac. Fin Preced Costo directo Cos./dia
7/2
Inicio 7/22/2019 0 7/22/2019
A 7/22/2019 2 7/24/2019 Inicio $ 1,000,000.00 $ 500,000.00
B 7/24/2019 4 7/28/2019 A $ 2,000,000.00 $ 500,000.00
C 7/28/2019 2 7/30/2019 B $ 500,000.00 $ 250,000.00
D 7/28/2019 3 7/31/2019 B $ 1,200,000.00 $ 400,000.00
E 7/31/2019 3 8/3/2019 D
ACTIVIDADES
$ 900,000.00 $ 300,000.00
F 8/3/2019 2 8/5/2019 D,E $ 1,000,000.00 $ 500,000.00
G 8/3/2019 4 8/7/2019 E $ 2,400,000.00 $ 600,000.00
H 8/7/2019 2 8/9/2019 G $ 1,000,000.00 $ 500,000.00
I 8/9/2019 4 8/13/2019 HG $ 2,000,000.00 $ 500,000.00
J 8/13/2019 4 8/17/2019 I $ 1,600,000.00 $ 400,000.00
Fin 8/17/2019 0 8/17/2019 C,F,J
$ 13,600,000.00
$13600000.00000
$14000000.00000
$12000000.00000 $11500000.00000
$10000000.00000
$10000000.00000
$7800000.00000
ACUM $
$2000000.00000
$-
$10000000.00000
$7800000.00000
ACUM $
$8000000.00000 Curva tempr
$6300000.00000 Curva tardía
$6000000.00000
$3650000.00000
$3400000.00000
$4000000.00000
$2000000.00000
$-
$-
7/22/2019 7/29/2019 8/5/2019 8/12/2019 8/19/2019
SEMANA
7/22/2019 7/29/2019 8/5/2019 8/12/2019 8/19/2019
A
D
ACTIVIDADES
E
RUTA CRITIC
F Col umn B
G
TIEMPO EN SEMANAS
43668
43696 HOLGURAS
8/17/2019 8/17/2019
7/30/2019 8/5/2019
18 12
$ 13,600,000.00
100%
a s tardia
$13600000.00000
0
0
Curva tempra na
Curva tardía
Curva tempra na
Curva tardía
8/19/2019
8/19/2019
RUTA CRITICA
Col umn B
PROGRAMACION DE OBRA - METODO DE GANTT
PROYECTO NO.1
Actividad Imicio Durac. Fin Preced Costo directo Cos./dia
Inicio 7/22/2019 0 7/22/2019
A 7/22/2019 2 7/24/2019 Inicio $ 1,000,000.00 $ 500,000.00
B 7/24/2019 4 7/28/2019 A $ 2,000,000.00 $ 500,000.00
C 8/15/2019 2 8/17/2019 B $ 500,000.00 $ 250,000.00
D 7/28/2019 3 7/31/2019 B $ 1,200,000.00 $ 400,000.00
E 7/31/2019 3 8/3/2019 D $ 900,000.00 $ 300,000.00
F 8/15/2019 2 8/17/2019 D,E $ 1,000,000.00 $ 500,000.00
G 8/3/2019 4 8/7/2019 E $ 2,400,000.00 $ 600,000.00
H 8/7/2019 2 8/9/2019 G $ 1,000,000.00 $ 500,000.00
I 8/9/2019 4 8/13/2019 HG $ 2,000,000.00 $ 500,000.00
J 8/13/2019 4 8/17/2019 I $ 1,600,000.00 $ 400,000.00
Fin 8/17/2019 0 8/17/2019 C,F,J
$ 13,600,000.00
100%
19 8/19/2019
costo real del trabajo realizado (costo actual (ac))
costo programado del trabajo planeado (pv)
costo presupuestado del trabajo realizado (valor acumulado)
ogramacion= cptr/cptp
ostos= cptr/crtr