12+650
12+700
12+850
12+917 12+900
EXISTING BOX CULVERT PLAN BOX CULVERT PLAN BOX CULVERT EXISTING BOX CULVERT PLAN BOX CULVERT EXISTING BOX CULVERT EXISTING BOX CULVERT EXISTING BOX CULVERT EXISTING BOX CULVERT PLAN BOX CULVERT PLAN BOX CULVERT EXISTING BOX CULVERT EXISTING BOX CULVERT PLAN BOX CULVERT EXISTING GORONG2X PLAN BOX CULVERT EXISTING BOX CULVERT PLAN BOX CULVERT
4.0 M 2.0 M 3.0 M 10.0 M 8.0 M WIDENING RO AD / CRITICAL AREA 7.0 M 2.0 M 7.0 M
STA 0+154 STA 1+520 STA 1+535 STA 5+745 STA 5+752 STA 7+844 STA 7+950 STA 8+092 STA 8+295 STA 8+410 STA 8+550 STA 9+468 STA 10+392 STA 10+407 STA 10+558 STA 11+500 STA 12+300 STA 12+917
10+200
P: 4.0 M L: 2.0 M P: 12.0 M L: 2.0 M P: 3.0 M L: 1.0 M P: 5.0 M L: 1.0 M P: 14.0 M L: 1.0 M P: 11.0 M L: 1.0 M P: 8.0 M L: 1.0 M P: 8.0 M L: 1.0 M P: 3.0 M L: 1.0 M P: 8.0 M L: 1.0 M
9+950
EXISTING BOX CULVERT
7 7.0 M
STA 6+535
6
Own's SERD Own's SERD
10+407
10+415
11+500
11+503
11+630
11+716
12+115
12+300
12+925
1s t Step for Area 3rd Step for Area
1+850
1+876
2+004
2+008
2+714
2+750
2+775
2+830
3+050
3+385
3+388
3+500
3+516
3+542
3+553
3+704
3+712
4+150
4+230
4+353
4+425
4+589
5+302
5+380
5+745
5+752
5+755
6+535
6+745
6+757
6+975
7+270
7+480
7+500
7+713
7+844
7+950
8+092
8+295
8+410
8+424
8+550
8+561
8+750
9+468
10+392
10+400
Land Compensation Land Compensation
EXISTING EXISTING
THROW
THROW
THROW
THROW
THROW
THROW
THROW
THROW
THROW
THROW
THROW
THROW
THROW
6+575
6+595
ownership Mr. ??? Mr. HIKMAN
DIVEIDER ROAD DIVEIDER ROAD
WIDENING ROAD : WIDENING ROAD :
wid th = 1 m wid th = 1 m
leng ht = 40 m leng ht = 250 m
PLAN RETAINING WALL EXISTING DRAINAGE PLAN RETAINING WALL EXISTING GABION PLAN RETAINING WALL EXISTING DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE EXISTING GABION PLAN DRAINAGE EXISTING GABION EXISTING GABION PLAN DRAINAGE EXISTING RETAINING WALL A rea = 40 m2 EXISTING GABION PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE EXISTING GABION PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE A rea = 25 0 m2 PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE EXISTING DRAINAGE PLAN DRAINAGE
PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE P LAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE
P LAN DRAINAGE
PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE
EXISTING DRAINAGE PLAN DRAINAGE PLAN DRAINAGE
EXISTING DRAINAGE 3rd Step for Area
PLAN DRAINAGE 4th Step for Area 5th Step for Area PLAN DRAINAGE 6th Step for Area 7th Step for Area 2nd Step for Area 1s t Step for Area PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE PLAN DRAINAGE 8th Step for Area EXISTING DRAINAGE PLAN DRAINAGE
11+630
11+716
12+115
12+125
12+133
12+300
12+925
Land Compensation
Land Compensation Land Compensation Land Compensation Land Compensation Land Compensation Land Compensation Land Compensation
1+940
2+052
2+097
2+850
3+370
5+850
6+535
6+745
6+975
7+270
7+844
7+950
8+092
8+295
9+468
6+385
6+425
6+575
6+595
Mr. HIKMAN
THROW
THROW
THROW
THROW
THROW
THROW
THROW
THROW
THROW
THROW
THROW
Mrs. DIANA / PIXAL Mr. WIDAR SAMAWI FAMILY MR. SAMAWI ADIK Mr. WANCIK Mr. YAKIN MR. TAMIL
WIDENING ROAD :
WIDENING ROAD : WIDENING ROAD : WIDENING ROAD : WIDENING ROAD : WIDENING ROAD : WIDENING ROAD : wid th = 1 m WIDENING ROAD :
Own's SERD Own's SERD
wid th = 1 m wid th = 1,5 m wid th = 2 m wid th = 1,5 m wid th = 2,5 m wid th = 1,5 m leng ht = 250 m wid th = 1 m
leng ht = 250 m leng ht = 150 m leng ht = 50 m leng ht = 450 m leng ht = 40 m leng ht = 40 m A rea = 25 0 m2 leng ht = 50 m
A rea = 25 0 m2 A rea = 22 5 m2 A rea = 10 0 m2 A rea = 67 5 m2 A rea = 10 0 m2 A rea = 60 m2 A rea = 50 m2
10+200
9+950
5 6
11+650
11+700
12+650
12+700
12+850
12+900
7
3+650
3+900
4+050
4+200
4+650
4+700
4+850
5+300
WIDENING RO AD / CRITICAL AREA
1 2 3 4 8 6.0 M 9 10
WIDENING RO AD / CRITICAL AREA WIDENING RO AD / CRITICAL AREA WIDENING RO AD / CRITICAL AREA WIDENING RO AD / CRITICAL AREA WIDENING RO AD / CRITICAL AREA WIDENING RO AD / CRITICAL AREA WIDENING RO AD / CRITICAL AREA
PLAN BOX CULVERT
STA 12+125
P: 8.0 M L: 1.0 M